International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG09 : Meeting 2005-10-17 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG09  D (2005-10-17) 

ITU-T SG09

Integrated broadband cable networks and television and sound transmission

Study Period 2005

Meeting  from 2005-10-17 to 2005-10-21

held in Switzerland [Geneva]

Other Meetings : 2009-11-02  2009-02-23  2008-09-19  2008-05-05  2007-10-29  2007-06-14  2006-10-02  [ 2005-10-17 ]  2005-01-17 

Results:4 total items.
Delayed Contributions  [ AI/Question: Q9/9 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 39 ]  
 
Issues related to Codec Selection in IPCablecom Recommendations     Cisco Systems, Inc; , Siemens; Texas Instruments, Inc.; , MindSpeed Technologies, Inc.;   Q9/9, Q8/9   2005-10-07
[ 26 ]  
 
Draft new ITU-T Recommendation J.rtav: Real-time video and audio transmission system over IP network     Japan   Q9/9, Q11/9   2005-10-06
[ 25 ]  
+Add.1 
Technical Information of SIP usage for real-time audio/video transmission     KDDI (Japan)   Q9/9, Q11/9   2005-10-06
[ 21 ]  
 
Draft new Recommendation J.171.2 - IPCablecom Trunking Gateway Control Protocol (TGCP) Profile 2     Editor for Rec. J.171   Q9/9   2005-10-05
Results:4 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-15