International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG11 : Meeting 2006-01-23 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG11  D (2006-01-23) 

ITU-T SG11

Signalling requirements and protocols

Study Period 2005

Meeting  from 2006-01-23 to 2006-01-27

held in Switzerland [Geneva]

Other Meetings : 2009-01-19  2008-09-12  2008-09-05  2008-01-16  2007-09-21  2007-04-23  2006-11-03  2006-07-24  [ 2006-01-23 ]  2005-09-05  2005-05-02  2004-12-06 

Results:16 total items.
Delayed Contributions  [ AI/Question: 5/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 115 ]  
 
RACF Messages' Parameters Mapping     Reliance Infocomm Ltd., India   5/11   2006-01-11
[ 112 ]  
 
Proposal for Q.rcp.4 Rc interface     NTT Corporation   5/11   2006-01-11
[ 111 ]  
 
Proposed baseline document for Q.rcp.3 Re interface     NTT Corporation   5/11   2006-01-11
[ 107 ]  
 
A proposal of renaming Go' reference point in RACF     LM Ericsson   5/11   2006-01-11
[ 106 ]  
 
Proposal for the Iq interface     Siemens   5/11   2006-01-11
[ 105 ]  
 
Q.rcp.2: Determining the affected C-TRCF in case of multiple C-TRCFs in an administrative domain     Siemens   5/11   2006-01-11
[ 104 ]  
 
Clarification regarding RCIP usage between multiple C-TRCFs     Siemens   5/11   2006-01-11
[ 95 ]  
 
Add detailed description for IPv4&IPv6 Flow Information Object in section 7.2.3 in Q.rcp.2     China (People's Republic of)   5/11   2006-01-10
[ 93 ]  
 
Modify the description of the report of resource state in section 6.5 of Q.rcp.4     China (People's Republic of)   5/11   2006-01-10
[ 87 ]  
 
Initiation of the Protocol Development Work for the RACF Go' Interface     United States of America   5/11   2006-01-04
[ 81 ]  
 
Proposal for Evaluation of IP Network Layer 3 Mechanisms for Delivery of Desired Priority and QoS (for Action)     AT&T   5/11   2006-01-03
[ 80 ]  
 
Proposal for Developing IP-Based Service Priority Classifications and Related Signalling Requirements (for information)     AT&T   5/11   2006-01-03
[ 79 ]  
 
Proposed Framework/Roadmap for QoS and Priority (for information)     AT&T   5/11   2006-01-03
[ 78 ]  
 
User Plane Priority Levels for IP Networks and Services     United States of America   5/11   2006-01-03
[ 77 ]  
 
Service Restoration Priority Levels for IP Networks     United States of America   5/11   2006-01-03
[ 69 ]  
 
Comments on Draft Technical Report Q.ncap2 in Support of ETS/TDR     Telcordia   5/11   2006-01-03
Results:16 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-17