International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2006-01-16 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  D (2006-01-16) 

ITU-T SG13

Next-generation networks

Study Period 2005

Meeting  from 2006-01-16 to 2006-01-27

held in Switzerland [Geneva]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  2006-07-17  [ 2006-01-16 ]  2005-08-29  2005-04-25  2004-12-07 

Results:34 total items.
Delayed Contributions  [ AI/Question: Q2/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 568 ]  
 
Open Service Environment Capabilities for NGN Applications and User Services     ETRI   Q2/13   2006-01-10
[ 566 ]  
 
Proposal to split existing NGN multicast works in Q.2/13     ETRI   Q2/13   2006-01-10
[ 565 ]  
 
Proposal for NGN Multicast Service Framework     ETRI   Q2/13   2006-01-10
[ 539 ]  
 
Contribution to address the remaining issues of Y.vpn-qos     ZTE   Q2/13   2006-01-06
[ 526 ]  
 
Proposed new clauses on functional requirements and architecture in Y.ngn-account     ETRI   Q2/13   2006-01-06
[ 502 ]  
 
Proposed a new clause in the draft Y.ngn-account     Korea (Rep. of)   Q2/13   2006-01-06
[ 499 ]  
 
Additional Requirements on Draft Y.mpls-mob (MPLS capabilities for NGN services with mobility and QoS support)     Korea (Rep. of)   Q2/13   2006-01-06
[ 495 ]  
 
Addition on Multicast Capability at the Service Stratum in NGN     Korea (Rep. of)   Q2/13   2006-01-06
[ 492 ]  
 
Multicast Function for Mobile VPN in NGN     Korea (Rep. of)   Q2/13   2006-01-06
[ 491 ]  
 
A Proposal for Updated Drafting on Mobile VPN Capabilities in NGN Mobile Environment     Korea (Rep. of)   Q2/13   2006-01-06
[ 488 ]  
 
Functional Scenarios for NGN Multicast Services at the Transport Stratum     Korea (Rep. of)   Q2/13   2006-01-06
[ 479 ]  
 
The Proposed Texts of Protocol procedures for NGN Multicast service at the transport stratum on Y.ngn-mcast     Korea (Rep. of)   Q2/13   2006-01-06
[ 478 ]  
 
The updated texts of Y.ngn-mcast (NGN Multicast Service Capabilities with MPLS-based QoS Support)     Korea (Rep. of)   Q2/13   2006-01-06
[ 473 ]  
 
Additional comments on Draft Recommendation Y.2241 (CMIP)     France Telecom   Q3/13, Q2/13   2006-01-06
[ 465 ]  
 
Authoritative Directory Interoperability FAQ     VeriSign, Inc.   Q2/13   2006-01-05
[ 463 ]  
 
Proposal for the study on SIP based Real-time Conversational Voice Services     China Telecom   Q8/13, Q2/13   2006-01-05
[ 462 ]  
 
Some proposals to UPT Service Scenarios over NGN     China Telecom   Q8/13, Q6/13, Q2/13   2006-01-05
[ 451 ]  
 
Initial draft Recommendation on NGN service requirements for ID-based applications (Y.idservreqs)     ETRI   Q2/13   2006-01-05
[ 449 ]  
 
Revised initial draft Recommendation Y.mpserv - "Multi-play service scenario deployment model"     Telekomunikacja Polska (Poland)   Q8/13, Q2/13   2006-01-05
[ 426 ]  
 
Proposals for MPLS based Network QoS negotiation procedures     Huawei Technologies Co., Ltd.   Q2/13   2006-01-05
[ 425 ]  
 
Proposals for MPLS based Network Fast Handover mechanism     Huawei Technologies Co., Ltd.   Q2/13   2006-01-04
[ 424 ]  
 
Proposals for harmonizing the style of definitions for hose and pipe     Huawei Technologies Co., Ltd.   Q2/13   2006-01-04
[ 405 ]  
 
Consideration on the proposed work on IPTV toward Release 2 NGN     NTT Comware Corporation   Q8/13, Q2/13   2006-01-05
[ 404 ]  
 
Proposal for approval of "NGN Release 1 Requirements"     NTT Comware Corporation   Q2/13   2006-01-05
[ 393 ]  
 
Proposed modification of the Template for deployment models in TD 80 (WP 3/13)     Nortel Networks (Canada)   Q8/13, Q2/13   2006-01-04
[ 392 ]  
 
Overcoming Question confusion     Canada   Q8/13, Q2/13   2006-01-04
[ 383 ]  
 
Comments on the NGN roadmap     Nortel Networks (Canada)   Q2/13, Q1/13   2006-01-04
[ 376 ]  
 
Proposed changes to clauses 1 to 3 of the NGN Release 1 Scope     Nortel Networks (Canada)   Q2/13, Q1/13   2006-01-04
[ 375 ]  
 
Proposed changes to the introduction to NGN Release 1 Scope     Nortel Networks (Canada)   Q2/13, Q1/13   2006-01-04
[ 373 ]  
 
Consistency of FG NGN output documents concerning Lawful Interception     United States of America   Q8/13, Q3/13, Q2/13   2006-01-04
[ 370 ]  
 
2G Mobile Access Network Support in NGN - A Requirement for 2G Network Evolution Towards NGN for Developing Nations     Reliance Infocomm Ltd., India   Q6/13, Q3/13, Q2/13   2006-01-04
[ 367 ]  
 
Distributed Directory Interoperability Requirements     VeriSign, Inc.   Q2/13   2006-01-04
[ 327 ]  
 
Softrouter Requirements (FGNGN-OD-00043)     FGNGN Chairman   Q2/13   2005-11-23
[ 311 ]  
 
NGN Release 1 Requirements document - WG 1 output of London November 2005 FGNGN meeting (Ref. FGNGN-OD-00252)     FGNGN Chairman   Q2/13   2005-11-23
Results:34 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-17