International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-02-06 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2006-02-06) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-02-06 to 2006-02-17

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Results:46 total items.
Delayed Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 666 ]  
 
Proposal for Standardization of Ethernet transport networks     Huawei   Q12/15   2006-01-27
[ 659 ]  
 
Proposals for the interactions between the control plane components in G.8080     MII China   Q12/15   2006-01-27
[ 657 ]  
 
Proposal For the Interface of Connection Controller Component in G.8080     MII China   Q12/15   2006-01-27
[ 651 ]  
 
A proposal to inter-layer aspects     CMCC , Huawei   Q14/15, Q12/15   2006-01-27
[ 642 ]  
 
Comments on Transport MPLS SCN     Tellabs   Q12/15   2006-01-27
[ 641 ]  
 
Synchronous Connection Points     Tellabs   Q12/15   2006-01-27
[ 640 ]  
 
Comment on Appendix on PWE3 - MPLS Interworking     Tellabs   Q12/15   2006-01-27
[ 639 ]  
 
Modelling Terminology Mapping     Tellabs   Q12/15   2006-01-27
[ 634 ]  
 
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803     MII India   Q12/15   2006-01-27
[ 633 ]  
 
Reserved Labels for Transport MPLS     Alcatel   Q12/15, Q11/15, Q9/15   2006-01-27
[ 632 ]  
 
Control of a T-MPLS packet transport network     Alcatel   Q14/15, Q12/15   2006-01-27
[ 629 ]  
 
Requirements of 10GE LAN signal transport over OTN ODU connections     Lucent Technologies Germany   Q11/15, Q12/15   2006-01-27
[ 628 ]  
 
WITHDRAWN (same as D596)  
Same as D.596
 
N/A   Q12/15   2006-01-27
[ 625 ]  
 
Ethernet Clock extraction and insertion     BT   Q13/15, Q12/15, Q9/15   2006-01-27
[ 621 ]  
 
Proposed New Draft Recommendation G.PBT     BT   Q12/15   2006-01-27
[ 617 ]  
 
Unified Functional Model     Ciena   Q12/15   2006-01-27
[ 610 ]  
 
Considerations on unified model     Siemens   Q12/15   2006-01-27
[ 609 ]  
 
Proposed extended definition of transport entity     Alcatel   Q12/15   2006-01-27
[ 603 ]  
(Rev.1) 
Support for consenting Transport MPLS Recommendations     Italy , France   Q12/15, Q11/15, Q9/15   2006-01-27
[ 596 ]  
 
Proposed Entity Definitions for the Unified Model     BT   Q12/15   2006-01-27
[ 585 ]  
 
TTL process of the transport MPLS     Huawei   Q9/15, Q12/15   2006-01-26
[ 584 ]  
 
Summary of the issues on interlayer aspects in G.8080 draft     Huawei , China Mobile   Q14/15, Q12/15   2006-01-26
[ 576 ]  
 
Proactive advertisement of MAC address in MAC-in-MAC networks     Huawei   Q12/15   2006-01-27
[ 562 ]  
 
Transport Resource Address management in ASON     ZTE   Q12/15   2006-01-26
[ 560 ]  
 
Multi-domain call and connection in ASON     ZTE   Q12/15   2006-01-26
[ 557 ]  
 
Comments on SPC activation/deactivation functions     ZTE , China Mobile   Q14/15, Q12/15   2006-01-26
[ 555 ]  
 
Proposal of updating G.8121 for Transport MPLS and PWE3 support     Fujitsu   Q12/15, Q9/15   2006-01-26
[ 551 ]  
 
Secure Ethernet VLANs for Multi-domain MCN and SCN for Transport MPLS and Ethernet Layer Networks     Fujitsu   Q14/15, Q12/15, Q9/15   2006-01-26
[ 550 ]  
 
Addition of OAM to Transport MPLS Architecture and Equipment - G.8110.1 and G.8121     Fujitsu   Q12/15, Q9/15   2006-01-26
[ 547 ]  
 
VLAN Switching (Cross-Connect)     Siemens AG   Q12/15   2006-01-26
[ 540 ]  
 
Proposed Updates to G.7715 on RC-RC Communications for Route Query     Cisco   Q11/15, Q12/15, Q14/15   2006-01-25
[ 539 ]  
 
Proposed Additional form for components Interactions for Connection Setup in G.8080     Cisco   Q11/15, Q12/15, Q14/15   2006-01-25
[ 537 ]  
 
Modelling Aggregation     Tellabs   Q12/15   2006-01-26
[ 523 ]  
 
RPR in G.8010 and G.8021     Nortel Networks (Canada)   Q9/15, Q12/15   2006-01-25
[ 519 ]  
 
G.8010 Amendment concerns     Nortel Networks (Canada)   Q12/15   2006-01-25
[ 518 ]  
 
G.7713 - Restoration - SP10     Nortel Networks (Canada)   Q3/15, Q12/15, Q14/15   2006-01-25
[ 517 ]  
 
Unified Model, identifiers     Nortel Networks (Canada)   Q12/15   2006-01-25
[ 516 ]  
 
Unified Model, relationship between topological components and transport entities     Nortel Networks (Canada)   Q12/15   2006-01-25
[ 510 ]  
 
Proposed list of requirements for "Next Generation Ethernet"     NTT   Q12/15   2006-01-24
[ 494 ]  
 
Ethernet Ring Protection     Siemens AG   Q12/15, Q9/15   2006-01-26
[ 485 ]  
 
Proposed Text for G.asm     Ceterus Networks , Lucent , Sprint Nextel   Q14/15, Q11/15, Q9/15, Q12/15   2006-01-23
[ 484 ]  
 
List of topics related to G.asm (Client Service Management)     USA   Q14/15, Q11/15, Q9/15, Q12/15   2006-01-23
[ 476 ]  
 
Proposal on the standardization of fully transparent 10GbE-LANPHY transport scheme     Japan   Q12/15, Q11/15   2006-01-23
[ 464 ]  
 
In Service and Out of Service State in G.8010     Hitachi   Q12/15   2006-01-18
[ 461 ]  
 
Comment on the categorization of on-demand and proactive OAM in G.8010     Hitachi   Q12/15   2006-01-18
[ 460 ]  
 
Comment on the categorization of OAM injection method in G.ufatn     Hitachi   Q12/15   2006-01-18
Results:46 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-5