International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-02-06 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2006-02-06) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-02-06 to 2006-02-17

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  [ 2006-02-06 ]  2005-05-16  2004-11-29 

Results:38 total items.
Delayed Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 647 ]  
 
Draft Liaison Statement for Synchronous Ethernet OUI     BT   Q13/15   2006-01-27
[ 646 ]  
 
Input to G.pactiming on DS1 network limits for CES     USA   Q13/15   2006-01-27
[ 643 ]  
 
Ethernet timing flows     Nortel Networks   Q13/15   2006-01-27
[ 631 ]  
 
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks     Lucent Technologies Germany   Q13/15   2006-01-27
[ 630 ]  
 
Improvement of clause 10 of G.pactiming in respect to normative and informative content     Lucent Technologies Germany   Q13/15   2006-01-27
[ 625 ]  
 
Ethernet Clock extraction and insertion     BT   Q13/15, Q12/15, Q9/15   2006-01-27
[ 623 ]  
 
Limiting jitter & wander production - SyncEth Network Clock     BT   Q13/15   2006-01-27
[ 622 ]  
 
Enhancements to G.pactiming Appendix VIII     BT   Q13/15   2006-01-27
[ 620 ]  
 
Simulation and Test Configurations for Clock Synchronization over Packet Networks     Nortel Networks (Canada)   Q13/15   2006-01-27
[ 602 ]  
 
Improvements proposals for the G.pactiming     Ericsson   Q13/15   2006-01-27
[ 601 ]  
 
Proposals for improvements of Figure 2 in G.pactiming     Ericsson   Q13/15   2006-01-27
[ 600 ]  
 
Proposals on Study Point 20 in G.pactiming Living List     Ericsson   Q13/15   2006-01-27
[ 599 ]  
 
Proposals on Network Limits (clause 7) in G.pactiming     Ericsson   Q13/15   2006-01-27
[ 598 ]  
 
Proposals on Measurement Guidelines Appendix in the G.pactiming (SP23)     Ericsson   Q13/15   2006-01-27
[ 597 ]  
 
Proposals for Clause 12, IWF Requirements in G.pactiming (SP25 and SP7)     Ericsson   Q13/15   2006-01-27
[ 595 ]  
 
Timing Diagrams for TDM transport over Packet Switched Networks     Israel   Q13/15   2006-01-27
[ 593 ]  
 
Clarifications regarding Figures 4,5, and 7 of G.pactiming     Israel   Q13/15   2006-01-27
[ 592 ]  
 
Additional text for Appendix VI/G.pactiming     Israel   Q13/15   2006-01-27
[ 591 ]  
 
Proposed changes to clause 9/G.pactiming     Israel   Q13/15   2006-01-27
[ 590 ]  
 
Clarifications concerning Table 2/G.pactiming     Israel   Q13/15   2006-01-27
[ 589 ]  
 
Effect of packet loss/packet mis-order on timing recovery (High BW PLL)     Israel   Q13/15   2006-01-27
[ 588 ]  
 
Reference timing source noise model for simulation of the differential clock recovery method     Israel   Q13/15   2006-01-27
[ 546 ]  
 
Proposed editorial modification for G.pactiming     Alcatel   Q13/15   2006-01-26
[ 545 ]  
(Rev.1) 
Proposed modification of F12 G.pactiming     Alcatel   Q13/15   2006-01-26
[ 544 ]  
 
Wander proposal for Annex A Case 2A of G.pactiming     Alcatel   Q13/15   2006-01-26
[ 525 ]  
 
Characterization of Ethernet Frame Delay Variation using Time and Frequency Statistical Metrics     Nortel Networks (Canada)   Q13/15   2006-01-25
[ 524 ]  
 
Simulation and Test Configurations for Clock Synchronization over Packet Networks     Nortel Networks (Canada)   Q13/15   2006-01-25
[ 493 ]  
 
Definition of "Preservation of Service Clock"     Symmetricom   Q13/15   2006-01-25
[ 483 ]  
 
Draft of G.pactiming: SSM implementation details     Ukraine   Q13/15   2006-01-23
[ 482 ]  
 
Draft of G.pactiming: proposal to Figure 12     Ukraine   Q13/15   2006-01-23
[ 481 ]  
 
Draft of G.pactiming: proposal for IWF synchronization function     Ukraine   Q13/15   2006-01-23
[ 471 ]  
 
Settling Time     Zarlink Semiconductor   Q13/15   2006-01-19
[ 470 ]  
 
The Effect of Network Disturbances on Differential Clock Recovery Schemes     Zarlink Semiconductor   Q13/15   2006-01-19
[ 469 ]  
 
Figure 4 of Section 9 of G.Pactiming     Zarlink Semiconductor   Q13/15   2006-01-19
[ 468 ]  
 
Behaviour of Clock Recovery Mechanisms under Packet Loss     Zarlink Semiconductor   Q13/15   2006-01-19
[ 467 ]  
 
Section 11.2 of G.Pactiming     Zarlink Semiconductor   Q13/15   2006-01-19
[ 466 ]  
 
Section 11.1 of G.Pactiming     Zarlink Semiconductor   Q13/15   2006-01-19
[ 465 ]  
 
Mergers of Annex A into Section 7 of G.pactiming     Zarlink Semiconductor   Q13/15   2006-01-19
Results:38 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-5