International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-02-11 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG15  TD-WP2 (2008-02-11) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  [ 2008-02-11 ]  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Results:20 total items.
Temporary Documents  (WP2)  [ AI/Question: Q6/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 287-WP2 ]  
 
Agenda for the WP2 closing plenary     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 286-WP2 ]  
 
Interim activities     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 281-WP2 ]  
 
Report of the Q. 6/15 meeting     Q6/15 Rapporteur   Q6/15   2008-02-20
[ 278-WP2 ]  
 
Response to OIF liaison regarding EDC-based application codes (oif2008.050)     SG15 Q6   Q6/15   2008-02-20
[ 277-WP2 ]  
 
Interim activities     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 276-WP2 ]  
 
Liaison Statements     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 275-WP2 ]  
 
Status of Recommendations     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 274-WP2 ]  
 
List of texts for consent, for agreement and for deletion     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 273-WP2 ]  
 
WP2/15 Report (Part I)     Chairman WP2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-21
[ 271-WP2 ]  
 
Summary of correspondence on 40G/100G     Correspondence group leader   Q6/15   2008-02-12
[ 266-WP2 ]  
 
Draft agenda for the Q.6/15 meeting, version 2     Q6/15 Rapporteur   Q6/15   2008-02-09
[ 265-WP2 ]  
 
LS regarding EDC Modeling Project     OIF   Q6/15   2008-02-08
[ 264-WP2 ]  
 
Summary of correspondence on clause 7 of sup39     Correspondence leader   Q6/15   2008-02-07
[ 259-WP2 ]  
 
Correspondence report of study on changes within IEC 60825-1 and 60825-2 with potential impact on G.664     Correspondence leader   Q6/15   2008-02-06
[ 257-WP2 ]  
 
Application parameters for G.959.1 version 4.8     Editor G.959.1   Q6/15   2008-02-05
[ 255-WP2 ]  
 
Correspondence on draft revised G.698.2     Editor G.698.2   Q6/15   2008-02-05
[ 254-WP2 ]  
 
Draft revised Recommendation G.698.2 Version 1.11     Editor G.698.2   Q6/15   2008-02-05
[ 252-WP2 ]  
 
Correspondence on draft revised G.959.1     Editor G.959.1   Q6/15   2008-01-21
[ 251-WP2 ]  
 
Liaison report of the October meeting of SC86C     Rep IEC SC86C   Q7/15, Q6/15, Q5/15, Q10/15   2008-01-18
[ 248-WP2 ]  
 
Agenda for WP 2/15     Chairman, WP 2/15   Q10/15, Q8/15, Q7/15, Q6/15, Q5/15   2008-02-10
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-6