International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG19 : Meeting 2008-01-17 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG19  C (2008-01-17) 

ITU-T SG19

Mobile telecommunication networks

Study Period 2005

Meeting  from 2008-01-17 to 2008-01-24

held in Korea (Rep. of) [Seoul]

Other Meetings : 2008-09-12  2007-09-21  2007-04-19  2006-07-19  2006-01-23  2005-09-05  2005-05-03  2004-12-13 

Results:16 total items.
Contributions  [ AI/Question: Q6/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 48 ]  
 
Text on Transport Level Convergence for Draft Rec. FMC-IMS     Samsung Electronics   Q6/13, Q5/19   2008-01-08
[ 47 ]  
 
Proposed restructuring of Q.FMC-IMS     ZTE Corporation, Samsung Electronics Ltd.   Q6/13, Q5/19   2008-01-08
[ 46 ]  
 
Revision of Section 8.4 in Q.MMF     ETRI   Q6/13, Q2/19   2008-01-08
[ 45 ]  
 
Revised Text for Draft Recommendation Q.HCF (v0.8)     ETRI   Q6/13, Q2/19   2008-01-08
[ 44 ]  
 
Revised Text for Location Query Procedure in Q.MMF     Korea Telecom   Q6/13, Q2/19   2008-01-08
[ 43 ]  
 
Revised Inter-CN Location Management Architecture for Q.LMF     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 42 ]  
 
Proposed Texts for Section 5 in Q.LMF     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 41 ]  
 
Clarification of Texts in Section 7.1 in Q.MMF     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 40 ]  
 
Proposed Texts for Section 6 in Q.HCF-     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 39 ]  
(Rev.1) 
Proposal for fast authentication procedure in Q.HCF     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 38 ]  
(Rev.1) 
Editorial Modification in Q.HCF     Korea, (Rep. of)   Q6/13, Q2/19   2008-01-08
[ 35 ]  
 
Proposal for additional text for session/application layer handover     Huawei Technologies Co., Ltd.   Q2/19, Q6/13, Q3/13   2008-01-07
[ 34 ]  
(Rev.1) 
Operation of network-assisted mobility control     Huawei Technologies Co. Ltd   Q2/19, Q6/13, Q3/13   2008-01-08
[ 33 ]  
 
Reconciling draft Rec. Q.mmf with Y.FRA     Huawei Technologies Co. Ltd   Q2/19, Q6/13, Q3/13   2008-01-07
[ 32 ]  
 
Modified Pre-emptive Operations for Fast Handover     Korea (Republic of)   Q6/13, Q2/19   2008-01-07
[ 31 ]  
 
Extensible IP Version 4 Network For Convergence  
Public Access
 
China Telecom   Q6/13, Q5/19   2007-09-18
Results:16 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-17