International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN-GSI : Meeting 2009-05-11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN-GSI  C (2009-05-11) 

ITU-T NGN-GSI

NGN Global Standards Initiative

Study Period 2009

Meeting  from 2009-05-11 to 2009-05-22

held in Switzerland [Geneva]

Other Meetings : 2012-12-03  2012-06-04  2012-02-06  2011-10-10  2011-05-09  2011-01-17  2010-09-06  2010-04-19  2010-01-18  2009-09-02  2009-01-12 

Results:20 total items.
Contributions  [ AI/Question: Q5/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 266 ]  
 
Proposed changes in Q.3307     Telekomunikacja Polska (Poland)   Q5/11   2009-05-06
[ 229 ]  
 
Proposed additions to draft Q.ANCP     Huawei Technologies Co. Ltd   Q5/11   2009-05-05
[ 222 ]  
 
Proposed amendment on the Rh interface of Q.3308     ETRI   Q5/11   2009-05-05
[ 142 ]  
 
A proposal to add security considerations of Ri interface     China Telecom   Q5/11   2009-05-04
[ 132 ]  
 
Proposed new Appendix V of Q.Flowstatesig, comparing Generic Internet Signalling Transport with the requirements of FSA signalling     Razoom Inc.   Q5/11   2009-05-04
[ 131 ]  
 
Proposed additions to security capabilities supported in Q.flowstatesig     Razoom Inc.   Q5/11   2009-05-04
[ 130 ]  
 
Proposed text amendments to Q.flowstatesig, dealing with AR renegotiation frequency     Razoom Inc.   Q5/11   2009-05-04
[ 91 ]  
 
Proposed reservation types in Q.QCP     British Telecom, Huawei Technologies Co., Ltd.   Q5/11   2009-05-01
[ 72 ]  
 
Proposed procedures of Rd interface     Telekomunikacja Polska, Huawei Tech Co., Ltd   Q5/11   2009-05-01
[ 70 ]  
 
Procedures of Q.rsctm     CATR, Huawei Technologies   Q5/11   2009-05-01
[ 68 ]  
 
Aggregation in Q.QCP     British Telecom, Huawei Technologies   Q5/11   2009-05-01
[ 62 ]  
 
Marking method in Q.QCP     British Telecom, Huawei Technologies   Q5/11   2009-05-01
[ 61 ]  
 
Modifications to draft Q.PCNApp based on progress in the IETF PCN Working Group     Huawei Technologies   Q5/11   2009-05-01
[ 8 ]  
 
Addition of NA(P)T-related description on procedures in Ri     KDDI Corporation   Q5/11   2009-04-27
[ 7 ]  
 
Modification of a definition about direction of Flow-Description AVP on Ri     KDDI Corporation   Q5/11   2009-04-27
[ 6 ]  
 
Additions of new clause to describe use of Diameter base protocol in Ri     KDDI Corporation   Q5/11   2009-04-27
[ 5 ]  
 
Additions of security considerations on Ri     KDDI Corporation   Q5/11   2009-04-27
[ 4 ]  
 
Additions of terms and definitions on Ri     KDDI Corporation   Q5/11   2009-04-27
[ 3 ]  
 
Modification on protocol specification of Ri     KDDI Corporation   Q5/11   2009-04-27
[ 2 ]  
 
Editorial changes on Ri     KDDI Corporation   Q5/11   2009-04-27
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-29