International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN-GSI : Meeting 2010-01-18 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN-GSI  C (2010-01-18) 

ITU-T NGN-GSI

NGN Global Standards Initiative

Study Period 2009

Meeting  from 2010-01-18 to 2010-01-29

held in Switzerland [Geneva]

Other Meetings : 2012-12-03  2012-06-04  2012-02-06  2011-10-10  2011-05-09  2011-01-17  2010-09-06  2010-04-19  2009-09-02  2009-05-11  2009-01-12 

Results:30 total items.
Contributions  [ Source: AT ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 518 ]  
 
Comments & proposals on y.dpireq     AT&T , Cisco , Juniper   Q17/13   2010-01-08
[ 507 ]  
 
Proposed Appendix to FRA for IdM an illustrative deployment     AT&T , Telcordia Technologies   Q5/13, Q16/13   2010-01-08
[ 506 ]  
 
Proposed Scope Change to Y.DPIREQ     AT&T , Cisco , dpacket.org , Juniper   Q17/13   2010-01-08
[ 495 ]  
 
Proposed New Text for Section 9.7 (IETF) of TRQ.ETS-Overview     AT&T   Q13/11   2010-01-08
[ 434 ]  
 
Interworking between ANCP and RCIP in the bandwidth delegation procedure     Huawei Technologies , CATR   Q5/11   2010-01-08
[ 427 ]  
 
Proposed modifications to Q.3323.2 (Rw H.248 version 2)     Huawei Technologies , CATR   Q5/11   2010-01-07
[ 425 ]  
 
Protocol requirements of the interfaces in Q.PCNApp     Huawei Technologies , CATR   Q5/11   2010-01-07
[ 401 ]  
 
Proposal to initiate a new work item on routing and reliability of PTDN     CATR, MIIT, P.R. China   Q20/13   2010-01-07
[ 400 ]  
 
Proposal to establish the roadmap of PTDN standardization     CATR, MIIT, P.R. China   Q20/13   2010-01-07
[ 399 ]  
 
Propose to incorporate the content of clause 8 into clause 6 & 7 in Y.PTDN     CATR, MIIT, P.R. China   Q20/13   2010-01-07
[ 398 ]  
 
Propose to delete the clause 11&12 in Y.PTDN     CATR, MIIT, P.R. China   Q20/13   2010-01-07
[ 390 ]  
(Rev.1) 
Stability and Maturity of Draft ITU-T Recommendation Q.FlowStateSig     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 389 ]  
(Rev.1) 
Q.FlowStateSig: Collaboration with Q5/11 and IETF     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 388 ]  
(Rev.1) 
Q.Flowstatesig draft - Clause 7.3.1 DSCP code point and other issues     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 387 ]  
(Rev.1) 
Q.Flowstatesig draft - Comments on clause 7.3.2 IPv6 Signalling Procedures     Juniper Nettworks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 386 ]  
(Rev.1) 
Q.Flowstatesig draft - Architecture issues     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 385 ]  
(Rev.1) 
Draft Q.FlowStateSig - Packet forwarding and Scalability of the proposed solution     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AG - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 382 ]  
 
Integration of the PKI-based authentication and the SAML assertion mechanisms     Alcatel-Lucent, USA , AT&T, USA   Q16/13   2010-01-07
[ 373 ]  
 
Proposed text for section 9.8 (IdM Security) of Y.ngnIdMreq     Telcordia Technologies , AT&T   Q16/13   2010-01-07
[ 372 ]  
 
Propose text for section 9.4.3.8 (Support of Services Requiring Priority Treatment) of Y.ngnIdMreq     Telcordia Technologies , AT&T   Q16/13   2010-01-07
[ 371 ]  
 
Proposed text for section 9.5 (Identity Management Federated Identity Functions) of Y.ngnIdMreq     Telcordia Technologies , AT&T   Q16/13   2010-01-07
[ 351 ]  
 
Proposed text added of BICC and V5UA protocol into the draft Recommendation Q.3910     CATR,the MIIT of China   Q9/11   2010-01-06
[ 350 ]  
 
Proposed editorial modification to the draft Recommendation Q.3910     CATR,the MIIT of China   Q9/11   2010-01-06
[ 349 ]  
 
Proposed signalling requirements for supporting the Communication Pickup service feature in Q.centrexSig     CATR , the MIIT of China   Q3/11   2010-01-06
[ 348 ]  
 
Proposed modifications to Q.3323.2 (Rw H.248 Profile version 2)     CATR, the MIIT of China   Q5/11   2010-01-06
[ 347 ]  
 
Proposal to modify Y.mobSec according to latest output of Y.MMCF     CATR,the MIIT of China   Q16/13   2010-01-06
[ 346 ]  
 
Proposal modification to clause 7.1 in Y.mobSec     CATR,The MIIT of China   Q16/13   2010-01-06
[ 345 ]  
 
Proposal to extend the meaning of user profile in Y.NGN-SIDE-Req     CATR,The MIIT of China   Q3/13   2010-01-06
[ 331 ]  
 
Proposed Text for ITU-T Recommendation Y.2233     Telcordia Technologies , Alcatel-Lucent , AT&T , Qwest , Verizon   Q3/13   2010-01-06
[ 330 ]  
 
Review of Editor's Notes in ITU-T Recommendation Y.2233 Working Document (TD 81)     Telcordia Technologies , Alcatel-Lucent , AT&T , Qwest , Verizon   Q3/13   2010-01-06
Results:30 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-8