International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2012-06-11 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-PLEN (2012-06-11) 

ITU-T SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting  from 2012-06-11 to 2012-06-15

held in Switzerland [Geneva]

Other Meetings : [ 2012-06-11 ]  2012-02-17  2011-10-17  2011-05-20  2011-05-13  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-09-02  2009-05-21  2009-01-19 

Results:45 total items.
Temporary Documents  (PLEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 180-PLEN ]  
 
Updated Work Programme     Chairman, WP2/11   QALL/11   2012-06-18
[ 179-PLEN ]  
 
List of outgoing liaison statements - SG11 meeting (11-15 June 2012)     TSB   QALL/11   2012-06-15
[ 178-PLEN ]  
 
List of draft Recommendations proposed for "consent", and of other deliverables for approval     TSB   QALL/11   2012-06-15
[ 177-PLEN ]  
 
Working Party 1 Outgoing Liaison Statements for SG11 approval     Chairman, WP1/11   QALL/11   2012-06-15
[ 176-PLEN ]  
 
WP1/11 Report     Chairman, WP1/11   Q2/11, Q16/11, Q14/11, Q13/11, Q1/11   2012-06-15
[ 175-PLEN ]  
 
WP1/11 Work Programme updates     Chairman, WP1/11   Q2/11, Q16/11, Q14/11, Q13/11, Q1/11   2012-06-15
[ 174-PLEN ]  
 
SG Y draft meeting work plan (25 February-1 March 2013)     TSB   QALL/11   2012-06-15
[ 173-PLEN ]  
(Rev.1) 
Draft report of the Meeting of Working Party 2/11 (Geneva 11-15 June 2012)     Chairman, WP2/11   Q5/11, Q4/11, Q3/11   2012-06-14
[ 172-PLEN ]  
(Rev.1) 
Working Party 4/11 Meeting Report (Geneva, 14 June 2012)     Chairman, WP4/11   Q9/11, Q8/11, Q12/11, Q11/11, Q10/11   2012-06-14
[ 171-PLEN ]  
(Rev.1) 
WP3/11 meeting Report     Chairman, WP3/11   Q7/11, Q6/11, Q15/11   2012-06-15
[ 170-PLEN ]  
 
WP3/11 Work Programme     Chairman, WP3/11   Q7/11, Q6/11, Q15/11   2012-06-15
[ 169-PLEN ]  
 
oLS-Testing activities     Chairman, WP4/11   Q8/11   2012-06-14
[ 168-PLEN ]  
 
Approval - Draft Revised ITU-T Recommendation Q.3304.1 v2 (Q.RcCOPS v2): Resource Control Protocol no. 4 (rcp4) Protocol at the interface between a Transport Resource Control Physical Entity (TRC-PE) and a Transport Physical Entity (T-PE) (Rc interface): COPS alternative (clean and revised versions)     Editor   Q5/11   2012-06-14
[ 167-PLEN ]  
(Rev.1) 
oLS-Request to consider Q14/17 move to SG 11 for next Study Period     Chairman, WP4/11   Q8/11   2012-06-14
[ 166-PLEN ]  
 
A.5 justification information for draft revised Revised X.603.1     Editors   Q15/11   2012-06-14
[ 165-PLEN ]  
+Add.1 
Consent - Draft Recommendation ITU-T X.603.1 Revision "Relayed multicast protocol: Specification for simplex group applications"     Editors   Q15/11   2012-06-14
[ 164-PLEN ]  
(Rev.1) 
oLS - Reply to LS on The Handbook on Network performance testing and monitoring for guarantee required QoS for NGN services     Chairman, WP3/11   Q6/11, Q11/11   2012-06-13
[ 163-PLEN ]  
(Rev.1) 
oLS on collaboration with JTC 1/SC 6 on multicast     Rapporteur, Q15/11   Q15/11   2012-06-13
[ 162-PLEN ]  
 
oLS - LS in Response to ETSI (3GPP) Liaison regarding CAT indicators in ISUP/BICC from ITU-T SG11, Q3/11 (COM 11 - LS 28 - E)     Vice Chairman, SG11   Q3/11   2012-06-13
[ 161-PLEN ]  
 
oLS - Reply LS to SG16 on collaboration on M2M and E-Health     ITU-T SG11   Q1/11   2012-06-13
[ 160-PLEN ]  
 
A.5 justification information for draft new Q.3940 (ex Q.SIP-ISDN-IT B (integration tests))     Editor   Q8/11   2012-06-13
[ 159-PLEN ]  
 
Consent - Q.3940 - NGN/IMS interconnection tests between network operators at the 'Ic' Interface and NGN NNI / SIP-I     Editors   Q8/11   2012-06-13
[ 158-PLEN ]  
 
Consent - Draft Recommendation ITU-T Q.3912     Editor   Q9/11   2012-06-13
[ 157-PLEN ]  
 
Consent - Draft new Recommendation Q.3304.2 v2 "Resource control protocol no. 4 SNMP Profile version 2, Protocol at the Rc interface between a Transport Resource Control Physical Entity (TRC-PE) and a Transport Physical Entity (T-PE) (Rc interface)"     Acting Editor   Q5/11   2012-06-13
[ 156-PLEN ]  
 
A.5 justification information for draft revised Q.3304.2 v2 (ex Q.3324.2 (Q.RcSNMP))     Editor   Q5/11   2012-06-13
[ 155-PLEN ]  
 
Consent - Draft new Recommendation Q.MMtesting     Editor   Q10/11   2012-06-13
[ 154-PLEN ]  
 
A.5 justification information for draft new Q.MMtesting     Editor   Q10/11   2012-06-13
[ 153-PLEN ]  
(Rev.1) 
Consent - Draft new Recommendation ITU-T Q.3930 "Performance Testing of Distributed Systems; Concepts and Terminology     Editor   Q11/11   2012-06-13
[ 152-PLEN ]  
(Rev.1) 
Consent - Output of Q.3303.1 v2: Resource control protocol no.3- Protocol at the interface between a Policy Decision Physical Entity (PD-PE) and a Policy Enforcement Physical Entity (PE-PE): COPS Profile version 2     Editor   Q5/11   2012-06-13
[ 151-PLEN ]  
 
A.5 justification information for draft revised Q.3303.1 v2 (ex Q.3323.1 (Q.RwCOPS v2))     Editor   Q5/11   2012-06-13
[ 150-PLEN ]  
 
Consent - Draft Recommendation ITU-T Q.3230(formerly Q.nacp.M13) "Signalling Requirements and Protocol at the M13 interface between TLM-PE and NID-PE"     Editors   Q7/11   2012-06-13
[ 149-PLEN ]  
 
A.5 justification information for draft new Q.3230 (ex Q.nacp.M13)     Editors, Q.3230   Q7/11   2012-06-13
[ 148-PLEN ]  
 
Consent - Draft Recommendation Q.3050 (formerly Q.NGN-SigProt)     Editor   Q1/11   2012-06-13
[ 147-PLEN ]  
 
A.5 justification information for draft new Q.3050 (formerly Q.NGN-SigProt)     Editor   Q1/11   2012-06-13
[ 146-PLEN ]  
(Rev.1) 
Final List of Participants     TSB   QALL/11   2012-06-12
[ 145-PLEN ]  
 
Debriefing of TSAG meeting 10-13 January 2012     TSB   QALL/11   2012-06-08
[ 144-PLEN ]  
 
List of incoming liaison statements to SG11 meeting     TSB   QALL/11   2012-06-07
[ 143-PLEN ]  
 
Newcomer welcome pack     TSB   QALL/11   2012-06-07
[ 142-PLEN ]  
 
Summary results of action taken at and since last SG11 meeting (17-21 October 2011)     TSB   QALL/11   2012-06-07
[ 141-PLEN ]  
 
SG11 meeting facilities and useful information     TSB   QALL/11   2012-06-07
[ 140-PLEN ]  
(Rev.1) 
List of SG11 meeting documents (Contributions, TD-PLEN and TD-GEN)     TSB   QALL/11   2012-06-07
[ 139-PLEN ]  
(Rev.1-3) 
SG11 meeting work plan     TSB   QALL/11   2012-06-07
[ 138-PLEN ]  
(Rev.1-2) 
Draft Agenda: Study Group 11 Plenary meetings (Geneva, 11-15 June 2012)     TSB   QALL/11   2012-06-07
[ 137-PLEN ]  
(Rev.1-4) 
Considering updating SG 11 portion of Resolution 2 text     Chairman SG11   QALL/11   2012-06-06
[ 136-PLEN ]  
 
ITU's conformity assessment program and ITU interop events and their relevance to ITU-T SG11     TSB   QALL/11   2012-06-06
Results:45 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-26