International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2009-09-28 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2009-09-28) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Results:14 total items.
Contributions  [ Source: Alcatel-Lucent ]  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 524 ]  
 
Proposal to determine BS/GS based on near-end information in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 523 ]  
 
Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 522 ]  
 
G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 521 ]  
 
G.8031 state transition when WTR timers differ at both ends     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 520 ]  
 
G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 519 ]  
 
G.8031 state transitions when working recovers from SF     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 518 ]  
 
Maintaining the independence of the two ring interconnection options in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 516 ]  
 
Proposal to rename the "RPL Node" in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 514 ]  
 
Proposal to review and update G.8032 Study Points and Living List     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 512 ]  
 
Proposed modifications to G.8021 and G.8032 for R-APS-specific dFOP-PM and dFOP-TO     Alcatel-Lucent USA, AimValley BV   Q9/15   2009-09-17
[ 406 ]  
 
BIP-8 handling in adaptation of 40GBASE-R into OPU3 and 100GBASE-R into OPU4     Alcatel-Lucent   Q9/15, Q11/15   2009-09-15
[ 405 ]  
 
Adaptation of STM-256 over multichannel parallel interfaces     Alcatel-Lucent , Cisco , Finisar , Juniper   Q9/15, Q11/15   2009-09-15
[ 399 ]  
 
CSF Indication for Y.1731 (Ethernet OAM)     Alcatel-Lucent   Q9/15, Q10/15   2009-09-15
[ 382 ]  
 
Automatic control of the ODUkT TCM control function     Alcatel-Lucent   Q9/15   2009-09-14
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-8