International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2009-09-28 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2009-09-28) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Results:24 total items.
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 601 ]  
 
Time distribution model using 1588v2 for performance indication     CMCC , ZTE Corporation   Q13/15   2009-09-18
[ 600 ]  
 
Proposal on time interface specification     CMCC , ZTE Corporation   Q13/15   2009-09-18
[ 599 ]  
 
Test and analysis of time synchronization using 1588v2 for transport network     CMCC , ZTE Corporation   Q13/15   2009-09-18
[ 590 ]  
 
Relativity Issue of Spectral Excursion & Maximum Ripple     ZTE Corporation   Q6/15   2009-09-18
[ 589 ]  
 
Proposal of Additional PT     ZTE Corporation   Q11/15   2009-09-18
[ 588 ]  
 
Proposal for avoiding re-flushing (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 587 ]  
 
Further consideration about subnetwork blocking resource management in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 585 ]  
 
Consideration on fast OPUk Client Signal Fail (CSF)     ZTE Corporation , CMCC , NSN   Q11/15   2009-09-18
[ 584 ]  
 
Solution to backward compatibility logic problem in G.8032v2 (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 583 ]  
 
Proposals to consider resource sharing in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 582 ]  
 
Proposal for ring protection information discovering in ASTN     ZTE Corporation   Q14/15   2009-09-18
[ 581 ]  
 
Proposal for adding some contents in appendix of G.696.1     ZTE Corporation   Q6/15   2009-09-18
[ 580 ]  
 
Considerations on use of P2P TC in 1588v2 telecom profile for phase/time sync     ZTE Corporation , Nokia Siemens Networks   Q13/15   2009-09-18
[ 579 ]  
 
Consideration on maximum spectral excursion for 10G_50GHz in G.698.2     ZTE Corporation   Q6/15   2009-09-18
[ 578 ]  
 
Comments on blocking the both ends of RPL (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 557 ]  
 
Description & implementation examples for a WDM1r with dedicated OTDR and RF video ports     ZTE Corporation   Q2/15   2009-09-18
[ 556 ]  
 
Description & implementation examples for a WDM1r with a dedicated OTDR port     ZTE Corporation   Q2/15   2009-09-18
[ 404 ]  
 
Propose to add Link discover Process based on OAM in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 403 ]  
 
Propose to add requirement of MAC topology management     ZTE Corporation   Q14/15   2009-09-15
[ 402 ]  
 
Propose to add MAC Link discover support in G.8051     ZTE Corporation   Q14/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 400 ]  
 
Propose to add requirement of discovery support on MPLS-TP NM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 386 ]  
(Rev.1) 
G.int: Improve the transportation efficiency of the payload in ATM cells     ZTE Corporation   Q4/15   2009-09-14
Results:24 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-28