International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:20 total items.
Contributions  [ Source: AT ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1329 ]  
 
Rationale for support of 1SL in Y.1731 and G.8021     AT&T , Verizon   Q9/15, Q10/15   2011-02-01
[ 1308 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1300 ]  
 
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021     Verizon , AT&T   Q9/15, Q10/15   2011-02-01
[ 1290 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1249 ]  
 
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile     CATR , China Mobile   Q10/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1235 ]  
 
Proposal on maximum PTP clock number in the time reference model     CMCC , CATR , ZTE   Q13/15   2011-01-31
[ 1234 ]  
 
TOD specification     CMCC , CATR , Huawei , ZTE   Q13/15   2011-01-31
[ 1157 ]  
 
G.ploam: Proposed Text for Upstream Xlog Test Parameter     ASSIA , AT&T   Q4/15   2011-01-31
[ 1156 ]  
 
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector     ASSIA , AT&T   Q4/15   2011-01-31
[ 1155 ]  
 
G.hnem: G.hnem management     ASSIA , AT&T , Aware , Maxim Integrated Product , Texas Instruments   Q4/15   2011-01-31
[ 1154 ]  
 
G.Gen, G.hx, G.cx: G.hn and G.cx management     ASSIA , AT&T , Aware , Marvell Semiconductor   Q4/15   2011-01-31
[ 1153 ]  
 
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2     ASSIA , AT&T   Q4/15   2011-01-31
[ 1152 ]  
 
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses     ASSIA , AT&T   Q4/15   2011-01-31
[ 1148 ]  
 
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     AT&T   Q4/15   2011-01-30
[ 1127 ]  
(Rev.1) 
Proposal to define IPv6 host config ME in G.988     Ericsson, AT&T, Alcatel-Lucent   Q2/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1123 ]  
 
Associated Channel Type for G.tpoam     CMCC, CT,CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-8-10