Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1908 ]
|
Alignment of G.7044 and G.798
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1903 ]
(Rev.1) +Add.1 |
Differences between APS and PSC for MPLS-TP linear protection
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1883 ]
|
Y.1731 extension for Throughput Measurement
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1878 ]
(Rev.1) |
Further Consideration of the Enhancement of LMM/LMR to support proactive LM
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1877 ]
(Rev.1) |
Another EOTN Equipment Type in G.798.1
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1876 ]
(Rev.1) |
Correction of ODUkP_TT and ODUkT_TT function in G.798
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1853 ]
(Rev.1) |
Alignment on dUNP between Y.1731 and G.8021
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15, Q14/15, Q10/15
|
2011-11-22 |
|
[ 1850 ]
(Rev.1) |
Proposed changes to G.8021 to avoid dLOC flapping
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15
|
2011-11-22 |
|
[ 1847 ]
|
China Propose to make progress on MPLS-TP OAM Standardization
|
China
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1844 ]
|
Requirements for L0/L1/L2 Multi-layer Convergence Network
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1843 ]
|
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1839 ]
|
Proposed modifications to draft G.8032v3
|
AimValley BV
,
Alcatel-Lucent Bell N.V.
|
Q9/15
|
2011-11-22 |
|
[ 1838 ]
|
G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1837 ]
|
Withdrawn - Duplicate of C-1838
Forthcoming
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1836 ]
|
Clarification on the meaning of "top priority local request" for CLEAR, clearance of SF(-P) (or of SD if applicable), or expiration of WTR in G.8031
|
Alcatel-Lucent Bell N.V.
,
Orckit Corrigent
|
Q9/15
|
2011-11-22 |
|
[ 1830 ]
(Rev.1) |
Updated requirement description and proposed text for adaptive bandwidth scenario in G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1829 ]
(Rev.1) |
Proposal to add ETH CL-SNCG/I protection to G.8031
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1822 ]
(Rev.1) |
Considerations about PTN and PSN applications for MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1821 ]
(Rev.2) |
Considerations about collaboration between ITU-T and IETF on MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1817 ]
(Rev.1) |
G.8021 editors contribution: OAM extraction process
|
Huawei Technologies Co. Ltd.
,
NEC Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1816 ]
(Rev.1) |
ODU SMP signalling considerations
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1815 ]
(Rev.1) |
Interworking G.873.2 ODUk SRP with G.873.1 ODUk SNCP
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1814 ]
(Rev.1) |
Proposal of ODU Shared Mesh Protection
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1813 ]
(Rev.1) |
Protection Switching Interwoirking
|
Ericsson UK
,
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1812 ]
|
Withdrawn, duplicate
Withdrawn
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1809 ]
(Rev.1) |
Consideration of APS communication and protection architectures for Ethernet rooted multipoint connection protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1803 ]
(Rev.1) |
Multi-VID ETH MEP and MIP functions
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1802 ]
(Rev.1) |
Progress on ICCP extension for the MSP application
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1799 ]
(Rev.1) |
Comments and proposals on G.8131.1 text
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1797 ]
(Rev.1) |
Proposals on the conditions for dLOC and dUNP defined in G.8021
|
China
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1796 ]
(Rev.1) |
Consideration of agenda items for p2mp protection switching
|
Hitachi, Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1794 ]
(Rev.1) |
Comment on p2mp protection switching documentation
|
Hitachi, Ltd.
|
Q9/15, Q10/15
|
2011-11-22 |
|
[ 1785 ]
(Rev.1) |
Terms for rooted multipoint (RMP) tree
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1779 ]
(Rev.1) |
Ethernet transport network node and port examples for inclusion in G.8021.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1778 ]
(Rev.1) |
Update 1+1 SNC/N protection descriptions in clause 11.2/G.808.1
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2011-11-22 |
|
[ 1769 ]
(Rev.1) |
Scope of G.smp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2011-11-22 |
|
[ 1763 ]
(Rev.1) |
Consideration on the use of a new Ethertype for MPLS-TP
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1762 ]
(Rev.1) |
OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1761 ]
(Rev.1) |
Consideration on scope of OTN SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1760 ]
(Rev.1) |
One service with multiple protection paths in SMP
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1759 ]
(Rev.1) |
Race conditions in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1758 ]
(Rev.1) |
Automatic switch in G.smp
|
China Unicom
,
ZTE Corporation
|
Q9/15
|
2011-11-22 |
|
[ 1756 ]
(Rev.1) |
MPLS-TP OAM Recommendations - Proposed way forward
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1748 ]
(Rev.1) |
Consideration on the node numbers and transmission distance of OTN SRP
|
ZTE Corporation
|
Q9/15
|
2011-11-22 |
Results:122 total items. Result page:
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):