Contributions
[ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2384 ]
(Rev.1) |
Boundary clock in networks and simulations
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2383 ]
(Rev.1) |
Boundary clock simulation model
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2381 ]
(Rev.1) |
G.8265.1 supported duration of negotiated service
|
Tellabs Oy
|
Q13/15
|
2012-08-28 |
|
[ 2375 ]
|
Cooperation of G.781 and BMCA in telecom profile for time
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2012-08-28 |
|
[ 2374 ]
|
PDV test pattern for G.8263
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2012-08-28 |
|
[ 2362 ]
|
Scope of G.8275.1
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2361 ]
|
Review of G.8272 latest draft
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2360 ]
|
G.8272: New Appendix describing possible PRTC locations
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2359 ]
|
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2358 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2357 ]
|
Development of a new Appendix of G.8261.1 on PDV generation testing
|
France Télécom Orange
|
Q13/15
|
2012-08-28 |
|
[ 2344 ]
|
Consequence of floor delay changes under tight PLL bandwidth
|
RAD Data Communications, Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2343 ]
|
The TVL of Signaling message
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2341 ]
|
The effect of MAC control pause operation for PTP synchronization
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2340 ]
|
Test error of PRTC
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2339 ]
|
PHY and intra-node noise error
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2338 ]
|
Analysis about SyncE rearrangement for different message delays of G.781
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2276 ]
|
Concerns regarding the packet selection methods for the PEC
|
China Unicom
|
Q13/15
|
2012-08-28 |
|
[ 2275 ]
|
Proposals for specifying relative aspects of T-BC recommended in G.8273.2
|
China Unicom
|
Q13/15
|
2012-08-28 |
|
[ 2274 ]
|
G.8273.3: Proposals about the functions of T-TC devices based on experimental results
|
China Unicom
|
Q13/15
|
2012-08-28 |
|
[ 2245 ]
|
DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
|
Q9/15, Q13/15
|
2012-08-28 |
|
[ 2244 ]
|
Criterion for Minimum Detectable Floor Delay Step using minMATIE
|
Huawei Technologies Co. Ltd.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2243 ]
|
Effect of Turnaround on Time Transport Performance using PTP
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2242 ]
|
Advantages of the Pdelay Mechanism in Time Transport using PTP for the case where SyncE is not Used for Frequency Transport
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2241 ]
|
Discussion of T-BC/T-TSC Noise Generation for Phase/Time Synchronization using PTP without SyncE Support
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2240 ]
|
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2239 ]
|
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2238 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2237 ]
|
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2012-08-28 |
|
[ 2235 ]
|
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths
|
China Mobile Communications Corporation
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix
|
Q13/15
|
2012-08-28 |
|
[ 2212 ]
|
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]
|
Aviat Networks
,
Calnex Solutions Limited
,
Juniper Networks
,
Sprint
,
Vitesse Semiconductor Corporation
|
Q13/15
|
2012-08-28 |
|
[ 2195 ]
|
Variable temperature test regime
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2194 ]
|
G.8263 Clarification
|
Rakon Limited
|
Q13/15
|
2012-08-27 |
|
[ 2172 ]
|
Time sync architecture based on multiple PTP domains
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2171 ]
|
Hold-off time and interactions between frequency and phase-time planes
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2170 ]
|
A possible solution for multiple GMs and operator intervention
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2169 ]
|
Sync OAM architecture and requirements
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2168 ]
|
Further analysis about BMCA of time profile
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2167 ]
|
The mapping between ToD and PTP
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2155 ]
|
Analysis of interactive mechanism between two layers
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2143 ]
|
G.8273: Test methodology annex/appendix
|
Calnex Solutions Limited
,
Deutsche Telekom AG
|
Q13/15
|
2012-08-27 |
|
[ 2106 ]
|
Architecture Considerations for Time Distribution
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2105 ]
|
G.8261.1 Network limits
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2104 ]
|
PTP Network Probe and PTP Clock Probe
|
ADVA Optical Networking
|
Q13/15
|
2012-08-26 |
|
[ 2103 ]
|
Exact PTP clockclass values in application
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2102 ]
|
Proposal on PTP multicast MAC address in 8275.1
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2101 ]
|
Test and analysis of time synchronization using 1588v2 in 100G OTN long haul transport network
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2100 ]
|
Coordinate mechanism for SyncE and PTP
|
China Mobile Communications Corporation
|
Q13/15
|
2012-08-26 |
|
[ 2095 ]
|
PRTC Timing Signal Variation for a Particular Design
|
SymmetriCom, Inc.
|
Q13/15
|
2012-08-25 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
Results:92 total items. Result page: