Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
16
total items.
Contributions
[ Source: Alcatel-Lucent ] [ AI/Question: Q10/15 ]
Number
Title
Source
AI/Question
Filter...
Q12/15
Q14/15
Q9/15
Clear filter
Date
[ 2272 ]
Proposed updated draft for ITU-T Recommendation G.8011.4/Y.1307.4
Alcatel-Lucent USA Inc.
Q10/15
2012-08-28
[ 2271 ]
Considerations re ETH-LM and Link Aggregation
AimValley BV
,
Alcatel-Lucent USA Inc.
Q14/15
,
Q10/15
2012-08-28
[ 2190 ]
Definition of Signal Degrade in packet networks
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
Q9/15
,
Q14/15
,
Q10/15
2012-08-27
[ 2166 ]
Requirements for Signal Degrade in packet networks
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
Q9/15
,
Q10/15
2012-08-27
[ 1854 ]
(Rev.1)
Clarification questions on MCC PDU definition in Y.1731
Alcatel-Lucent Italia S.p.A.
Q10/15
2011-11-22
[ 1853 ]
(Rev.1)
Alignment on dUNP between Y.1731 and G.8021
Alcatel-Lucent Italia S.p.A.
Q9/15
,
Q14/15
,
Q10/15
2011-11-22
[ 1851 ]
(Rev.1)
Proposed clarifications for Ethernet CSF Description in Y.1731
Alcatel-Lucent Italia S.p.A.
Q10/15
2011-11-22
[ 1840 ]
G.8032 ERP as a sub-type of G.8011.5 EPLAN and of G.8011.3 EVPLAN types 1, 2, and 3
Alcatel-Lucent Bell N.V.
Q10/15
2011-11-22
[ 1717 ]
(Rev.1)
Progressing MPLS-TP OAM, Equipment, and Management Recommendations
Alcatel-Lucent USA Inc.
Q9/15
,
Q12/15
,
Q10/15
2011-11-21
[ 1207 ]
Support for consent of G.tpoam
ZTE
,
Alcatel-Lucent Shanghai Bell
,
Fiberhome
,
Huawei
Q9/15
,
Q14/15
,
Q12/15
,
Q10/15
2011-01-31
[ 1199 ]
1DM checking and DMR generation
Alcatel-Lucent USA
Q9/15
,
Q10/15
2011-01-31
[ 1164 ]
MAC Operations using Y.1731
Alcatel-Lucent USA
,
Verizon
Q9/15
,
Q14/15
,
Q10/15
2011-01-31
[ 1161 ]
MAC Operations using Y.1731 Motivation and Rationale
Alcatel-Lucent USA
,
Verizon
Q9/15
,
Q14/15
,
Q10/15
2011-01-31
[ 786 ]
Ethernet Proactive Frame Delay Measurement
Alcatel-Lucent Italy
Q9/15
,
Q14/15
,
Q10/15
2010-05-14
[ 525 ]
MAC Operations using Y.1731 PDU
Alcatel-Lucent USA
,
Verizon
Q10/15
2009-09-18
[ 399 ]
CSF Indication for Y.1731 (Ethernet OAM)
Alcatel-Lucent
Q9/15
,
Q10/15
2009-09-15
Results:
16
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-10-16