Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
22
total items.
Contributions
[ Source: Deutsche Telekom ] [ AI/Question: Q13/15 ]
Number
Title
Source
AI/Question
Filter...
Clear filter
Date
[ 2143 ]
G.8273: Test methodology annex/appendix
Calnex Solutions Limited
,
Deutsche Telekom AG
Q13/15
2012-08-27
[ 1928 ]
Measurement Methods for Phase/Time Clocks
Deutsche Telekom AG
Q13/15
2011-11-23
[ 1927 ]
PTP and SyncE over OTN-ODU0
Deutsche Telekom AG
Q13/15
2011-11-23
[ 1926 ]
G.8271: Minor editorial improvements
Deutsche Telekom AG
Q13/15
2011-11-23
[ 1925 ]
G.8271 1pps interface performance specification
Deutsche Telekom AG
,
France Télécom Orange
Q13/15
2011-11-23
[ 1267 ]
G.8272 PRTC type approval process proposal
Deutsche Telekom
Q13/15
2011-01-31
[ 1266 ]
G.8272 PRTC Options: Temperature
Deutsche Telekom
Q13/15
2011-01-31
[ 1265 ]
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x)
Deutsche Telekom
Q13/15
2011-01-31
[ 1264 ]
Need for EEC chain hold-over management
Deutsche Telekom
Q13/15
2011-01-31
[ 990 ]
G.827x Slave Clock specification (for time)
Deutsche Telekom
Q13/15
2010-05-20
[ 989 ]
Q13 Requirements structure for time supply (G.827x)
Deutsche Telekom
Q13/15
2010-05-20
[ 988 ]
Input for G.827x Slave clock specification
Deutsche Telekom
Q13/15
2010-05-20
[ 987 ]
SyncE Jitter tolerance (high frequency)
Deutsche Telekom
Q13/15
2010-05-20
[ 844 ]
G.8262 V.2 minor comments
Deutsche Telekom
Q13/15
2010-05-17
[ 804 ]
SyncE Jitter tolerance values
Deutsche Telekom
Q13/15
2010-05-14
[ 743 ]
Mobile LTE specification and phase/time synchronization requirements
Deutsche Telekom
Q13/15
2009-09-21
[ 742 ]
NGN Synchronization requirements structure
Deutsche Telekom
Q13/15
2009-09-21
[ 741 ]
EEC - SyncE interface jitter and wander measurements
Deutsche Telekom
Q13/15
2009-09-21
[ 740 ]
PTP for Phase/ToD application: Need for in-house ToD interface specification
Deutsche Telekom
Q13/15
2009-09-21
[ 170 ]
Architecture for time supply with frequency support (related to PTP and planned G.8265)
Deutsche Telekom
Q13/15
2008-11-21
[ 169 ]
Hold-off time acc. to G.781 and SyncE
Deutsche Telekom
Q13/15
2008-11-21
[ 168 ]
G.8261/G.8262: EEC function requirements for T4 via Selector A and C
Deutsche Telekom
Q13/15
2008-11-21
Results:
22
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-10-13