Contributions
[ Source: ZTE ] [ AI/Question: Q13/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2172 ]
|
Time sync architecture based on multiple PTP domains
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2171 ]
|
Hold-off time and interactions between frequency and phase-time planes
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2170 ]
|
A possible solution for multiple GMs and operator intervention
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2169 ]
|
Sync OAM architecture and requirements
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2168 ]
|
Further analysis about BMCA of time profile
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2167 ]
|
The mapping between ToD and PTP
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 2155 ]
|
Analysis of interactive mechanism between two layers
|
ZTE Corporation
|
Q13/15
|
2012-08-27 |
|
[ 1841 ]
|
Proposal of RS422 1PPS time/phase as a time measurement interface
|
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1676 ]
(Rev.1) |
Noises Introduced by Boundary Clocks
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1674 ]
(Rev.1) |
G.8265 and G.8265.1 Editorial change
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1673 ]
(Rev.1) |
Time transient build out and time offset response
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1672 ]
(Rev.1) |
The mixed SSM_PTP application for frequency synchronization
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1667 ]
(Rev.1) |
Proposal of the combination of jumping and sliding window
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1662 ]
(Rev.1) |
Comments on G.8260 latest draft
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1660 ]
(Rev.1) |
Proposal of 1pps as an external interface of PEC
|
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1659 ]
(Rev.1) |
Proposals on the validation of the PTP master
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1657 ]
(Rev.1) |
Proposals on the factors used for the master selection of time/phase sync
|
China
,
China Mobile Communications Corporation
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1655 ]
(Rev.1) |
Analysis of selection window and oscillator
|
China
,
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1654 ]
(Rev.1) |
Analysis about timestamp process of PTP event packet
|
ZTE Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1620 ]
(Rev.1) |
Proposal on the 1588v2 over OTN by OSC
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1617 ]
|
Withdrawn: Duplicate of C-1620
Withdrawn
|
FiberHome Technologies Group
,
ZTE Corporation
|
Q13/15, Q11/15
|
2011-11-19 |
|
[ 1235 ]
|
Proposal on maximum PTP clock number in the time reference model
|
CMCC
,
CATR
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1234 ]
|
TOD specification
|
CMCC
,
CATR
,
Huawei
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1233 ]
|
PTP frequency sync with partial timing support
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1232 ]
|
Proposals on the BC simulation model in G.8273
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1070 ]
|
1588v2 transmission by OSC over OTN
|
FiberHome
,
CATR
,
ZTE
|
Q13/15, Q11/15
|
2010-05-21 |
|
[ 1066 ]
|
Analysis of time synchronization performance using PTP in hybrid transport network
|
CMCC
,
CATR
,
ZTE
|
Q13/15, Q11/15
|
2010-05-21 |
|
[ 1065 ]
|
Proposal of accelerating MTIE and TDEV mask study for time synchronization
|
CMCC
,
CATR
,
Huawei
,
ZTE
|
Q13/15
|
2010-05-21 |
|
[ 1064 ]
|
Proposal of research on link asymmetry compensation for PTP
|
CMCC, ZTE, CATR
|
Q13/15
|
2010-05-21 |
|
[ 1063 ]
|
Network limits reference model for time sync accuracy
|
CMCC
,
ZTE
|
Q13/15
|
2010-05-21 |
|
[ 1042 ]
|
Architecture of time synchronization using packet based method in G.8275
|
ZTE
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1041 ]
|
Issues about metrics of network limits for time synchronization
|
ZTE
,
CATR
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1040 ]
|
Field test of 1588v2 time sync based on physical layer frequency sync support
|
ZTE
,
CATR
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1039 ]
|
Definition related to time/phase sync in G.8260
|
ZTE
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1038 ]
|
Performance analysis of 1588v2 time/sync in field test
|
ZTE
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1037 ]
|
1588v2 test results with different clock mode and field network
|
ZTE
,
CATR
,
CMCC
|
Q13/15
|
2010-05-20 |
|
[ 1036 ]
(Rev.1) |
Consideration on Phase/Time synchronization over OTN
|
ZTE
|
Q13/15, Q11/15
|
2010-05-20 |
|
[ 601 ]
|
Time distribution model using 1588v2 for performance indication
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 600 ]
|
Proposal on time interface specification
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 599 ]
|
Test and analysis of time synchronization using 1588v2 for transport network
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 580 ]
|
Considerations on use of P2P TC in 1588v2 telecom profile for phase/time sync
|
ZTE Corporation
,
Nokia Siemens Networks
|
Q13/15
|
2009-09-18 |
|
[ 297 ]
|
BMC and SSM in 1588v2 Telecom Profiles for time/phase sync
|
ZTE Corporation
|
Q13/15
|
2008-11-23 |
|
[ 296 ]
|
Considerations about 1588v2 Telecom Profiles classification for time sync in G.8265
|
ZTE Corporation, CATR MII
|
Q13/15
|
2008-11-23 |
Results:45 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):