International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:52 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: ZTE ]  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2284 ]  
(Rev.1) 
Server layer-based SD detection method in packet network     ZTE Corporation   Q9/15, Q10/15   2012-08-28
[ 2263 ]  
 
Propose a new equipment model of converged access and transport node     ZTE Corporation   Q9/15, Q2/15, Q12/15   2012-08-28
[ 2225 ]  
 
Proposed text for ODU SMP Protocol     China Unicom , ZTE Corporation   Q9/15   2012-08-28
[ 2224 ]  
 
Proposed text of Commands for G.odusmp     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2222 ]  
 
Editorial proposal for G.smp     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2220 ]  
 
Example scenarios for protection interworking     China Unicom , ZTE Corporation   Q9/15   2012-08-28
[ 2219 ]  
 
Proposal of bi-directional failure in G.873.1     FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2190 ]  
 
Definition of Signal Degrade in packet networks     Alcatel-Lucent Italia S.p.A.; China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orckit Corrigent , Telecom Italia S.p.A. , ZTE Corporation   Q9/15, Q14/15, Q10/15   2012-08-27
[ 2166 ]  
 
Requirements for Signal Degrade in packet networks     Alcatel-Lucent Italia S.p.A.; China , China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orckit Corrigent , Telecom Italia S.p.A. , ZTE Corporation   Q9/15, Q10/15   2012-08-27
[ 2131 ]  
(Rev.1-2) 
example of state machine for SMP     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-27
[ 2099 ]  
(Rev.1-2) 
Analysis and comparison on PTN ring protection proposals     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2098 ]  
(Rev.1-3) 
MPLS-TP Shared-Ring protection (MSRP) mechanism for ring topology     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 2097 ]  
(Rev.1-2) 
PTN requirements on Ring protection  
Revision 2 of this Contribution is incorrectly titled; the correct title is: PTN requirements on Ring protection
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2012-08-26
[ 1992 ]  
(Rev.1) 
Inverse multiplexing for ODUS     China Telecommunications Corporation , ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2012-08-23
[ 1991 ]  
(Rev.1) 
Architecture Consideration for the extension of OTN Beyond 100G     China Telecommunications Corporation , ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2012-08-23
[ 1802 ]  
(Rev.1) 
Progress on ICCP extension for the MSP application     ZTE Corporation   Q9/15   2011-11-22
[ 1799 ]  
(Rev.1) 
Comments and proposals on G.8131.1 text     ZTE Corporation   Q9/15   2011-11-22
[ 1797 ]  
(Rev.1) 
Proposals on the conditions for dLOC and dUNP defined in G.8021     China , China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q9/15   2011-11-22
[ 1763 ]  
(Rev.1) 
Consideration on the use of a new Ethertype for MPLS-TP     Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2011-11-22
[ 1762 ]  
(Rev.1) 
OTN SMP     China Unicom , ZTE Corporation   Q9/15   2011-11-22
[ 1761 ]  
(Rev.1) 
Consideration on scope of OTN SMP     China Unicom , ZTE Corporation   Q9/15   2011-11-22
[ 1760 ]  
(Rev.1) 
One service with multiple protection paths in SMP     China Unicom , ZTE Corporation   Q9/15   2011-11-22
[ 1759 ]  
(Rev.1) 
Race conditions in G.smp     China Unicom , ZTE Corporation   Q9/15   2011-11-22
[ 1758 ]  
(Rev.1) 
Automatic switch in G.smp     China Unicom , ZTE Corporation   Q9/15   2011-11-22
[ 1754 ]  
(Rev.1) 
Proposal of new recommendation on multi layer converged transport network (G.mlctn)     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1753 ]  
(Rev.1) 
Draft of multi layer converged network informative document     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1748 ]  
(Rev.1) 
Consideration on the node numbers and transmission distance of OTN SRP     ZTE Corporation   Q9/15   2011-11-22
[ 1747 ]  
(Rev.1) 
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2     ZTE Corporation   Q9/15   2011-11-22
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1688 ]  
(Rev.1) 
Proposal for joint discussion about flexible grid network     ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-21
[ 1348 ]  
 
Proposal for an alternative method for SD detection     ZTE   Q9/15   2011-02-01
[ 1347 ]  
 
Comments on aTSF of ETHx in G.8021     ZTE   Q9/15   2011-02-01
[ 1281 ]  
 
Proposed texts for G.smp     ZTE   Q9/15   2011-01-31
[ 1280 ]  
 
Automatic Protection Switching (APS) protocol for Shared Mesh Protection     ZTE   Q9/15   2011-01-31
[ 1257 ]  
 
Propose a latency measurement model of equipment     ZTE   Q9/15   2011-01-31
[ 1208 ]  
(Rev.1) 
Non-ERP node in ring (G.8032)     ZTE , China   Q9/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1035 ]  
 
Proposal of Misconnection in Ring Protection     ZTE   Q9/15   2010-05-20
[ 1034 ]  
 
Consideration on LO ODUk Ring Protection     ZTE   Q9/15   2010-05-20
[ 1033 ]  
 
Comments on draft of G.ptneq generics     ZTE   Q9/15   2010-05-20
[ 1032 ]  
 
DNF at NR messages (G.8032)     ZTE   Q9/15   2010-05-20
[ 1031 ]  
 
SD scenarios (G.8031)     ZTE   Q9/15   2010-05-20
[ 1030 ]  
 
SD detection in G.8031     ZTE   Q9/15   2010-05-20
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
[ 588 ]  
 
Proposal for avoiding re-flushing (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 584 ]  
 
Solution to backward compatibility logic problem in G.8032v2 (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 578 ]  
 
Comments on blocking the both ends of RPL (G.8032)     ZTE Corporation   Q9/15   2009-09-18
[ 294 ]  
 
Includes pending state to support flushing FDB in non_revertive mechanism (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 293 ]  
 
Flushing behaviour in interconnected ring protection (G.8032)     ZTE Corporation, China   Q9/15   2008-11-23
[ 292 ]  
 
FDB Flush Problem in non_revertive operation     ZTE Corporation, China   Q9/15   2008-11-23
Results:52 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-17