Français
Español
Home
:
ITU-T
:
SG 5
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG 5 C
ITU-T SG 5
Max # of documents displayed/page:
Environment and climate change
Study Period 2013
Results:
10
total items.
Contributions
[ Source: Orange ] [ AI/Question: Q13/5 ]
Number
Title
Source
AI/Question
Filter...
Q17/5
Q18/5
Clear filter
Date
[ 737 ]
(Rev.1)
Connect 2020, Proposals related to KPIs on Ewaste
Orange
Q13/5
2016-04-07
[ 720 ]
Presentation on ITU Connect 2020 Agenda - Environmental Sustainability
Orange
Q18/5
,
Q17/5
,
Q13/5
2016-04-06
[ 719 ]
ITU Connect 2020 Agenda - Environmental Sustainability
Orange
Q18/5
,
Q17/5
,
Q13/5
2016-04-06
[ 272 ]
Last draft of Technical paper on life-cycle management of ICT equipment : objectives and content proposal
Orange
Q13/5
2014-05-06
[ 201 ]
L-UPA portable - Safety class 2 AC connection
Orange
,
Telecom Italia S.p.A.
Q13/5
2013-11-19
[ 200 ]
L-UPA portable - E-waste minimization
Orange
,
Telecom Italia S.p.A.
Q13/5
2013-11-19
[ 186 ]
Common contribution to progress the draft of L.UPA (result of Q13 gotomeeting 4 Nov 2013)
Orange
,
Telecom Italia S.p.A.
Q13/5
2013-11-19
[ 79 ]
Position of France Telecom for finalizing study battery
France Télécom Orange
Q13/5
2013-01-18
[ 53 ]
Slides for discussion of L.UPA portable
France Télécom Orange
Q13/5
2013-01-17
[ 51 ]
Early draft for L.UPA portable
France Télécom Orange
Q13/5
2013-01-17
Results:
10
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-10-5