Français
Español
Home
:
ITU-T
:
SG 5
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG 5 C
ITU-T SG 5
Max # of documents displayed/page:
Environment and climate change
Study Period 2013
Results:
18
total items.
Contributions
[ Source: Huawei Technologies Co. Ltd. ] [ AI/Question: Q17/5 ]
Number
Title
Source
AI/Question
Filter...
Clear filter
Date
[ 485 ]
Proposal for Recommendations Standardization terms and trends in energy efficiency
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 476 ]
Proposed new Supplement on "Verification test and feasibility study of energy and space efficient cooling systems for data centres with high density ICT devices"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 475 ]
Proposed new Supplement on "Potential for primary energy savings in TLC/ICT centres through free cooling"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 474 ]
Proposed new Supplement on "Rationale for minimum data set for evaluating energy efficiency and for controlling data centre equipment in view of power saving"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 473 ]
Proposed new Supplement on "Experimental studies on plates and ducts installed at equipment inlets and outlets"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 472 ]
Proposed new Supplement on "Verification experiments related to increase of efficiency of air-conditioning and control technologies at a data centre"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 471 ]
Proposed new Supplement on "Validation test of a data centre cooling method using renewable energy in a cold region"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-25
[ 434 ]
Proposed new Supplement on "Case study of reduction of air-conditioning energy by optical fibre based thermometry"
Huawei Technologies Co. Ltd.
Q17/5
2014-11-24
[ 432 ]
Proposed new Activity on open data for SSC
Huawei Technologies Co. Ltd.
Q17/5
2014-11-24
[ 431 ]
Best practices for telecom network infrastructure
Huawei Technologies Co. Ltd.
Q17/5
2014-11-24
[ 419 ]
Proposed new Activity on IOT for SSC
Huawei Technologies Co. Ltd.
Q17/5
2014-11-24
[ 361 ]
Comments to Input Document "Updated draft of L.model EE ICT"
Consorzio Nazionale Interuniversitario per le Telecomunicazioni
,
Huawei Technologies Co. Ltd.
,
Telecom Italia S.p.A.
Q17/5
2014-11-14
[ 253 ]
Proposal for recommendation L.RBS_assesment
Huawei Technologies Co. Ltd.
Q17/5
2014-05-05
[ 238 ]
Proposal for Recommendations L.NET_Infra_assessment
Huawei Technologies Co. Ltd.
Q17/5
2014-05-02
[ 183 ]
(Rev.1)
Huawei comment on draft Recommendations L.ref
Huawei Technologies Co. Ltd.
Q17/5
2013-11-19
[ 146 ]
The influence of infrastructure on the total energy consumption of a telecommunication network
Huawei Technologies Co. Ltd.
Q17/5
2013-11-18
[ 145 ]
Proposal on study of energy efficiency metrics of mobile station cell site and best practice for energy saving
Huawei Technologies Co. Ltd.
Q17/5
2013-11-18
[ 124 ]
Proposal of reference value for routers and switch
Huawei Technologies Co. Ltd.
Q17/5
2013-11-16
Results:
18
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-9-14