International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:61 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: China ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 399 ]  
 
The requirement of optical overhead extend at IrDI     China Unicom , FiberHome Technologies Group   Q11/15   2013-06-18
[ 397 ]  
 
The discussion about OTM- n.m IaDI interface of B100G     China Mobile Communications Corporation , FiberHome Technologies Group   Q11/15   2013-06-18
[ 396 ]  
 
The suggestion about OTM-0.mvn IrDI interface of B100G     China Mobile Communications Corporation , China Mobile Communications Corporation   Q11/15   2013-06-18
[ 365 ]  
 
Propose to add 1dB and 3dB passband width parameters in G.680     China Unicom , FiberHome Technologies Group   Q6/15   2013-06-18
[ 363 ]  
 
Requirement to clarify terms of the ripple and the passband width in G.680     China Unicom , FiberHome Technologies Group   Q6/15   2013-06-18
[ 266 ]  
 
Proposal to close the item 11 in G.987.3A2 living list with answer for "ANNEX" approach     China Mobile Communications Corporation , China Telecommunications Corporation , ZTE Corporation   Q2/15   2013-06-17
[ 263 ]  
 
proposal for study on requirements for wavelength selective reflector in in-service fibre test system application     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q17/15   2013-06-17
[ 255 ]  
 
OTUCn/ODUCn proposal after Q11/15's Feb 2013 meeting     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 254 ]  
 
N*100G flexible bit rate OTUCn proposal     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Infinera Corporation   Q11/15   2013-06-17
[ 253 ]  
 
Static noise generation of G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 252 ]  
 
Delay_Req Transmission Requirements in G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 251 ]  
 
Proposals for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 250 ]  
 
Proposal for default value for offsetScaledLogVariance, for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 249 ]  
 
Discussion of Noise Tolerance in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 248 ]  
 
Proposal for Time Noise Transfer in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 243 ]  
 
Proposals for Transient and Holdover Specifications for G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 241 ]  
 
The time noise generation of T-BC in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 240 ]  
 
Explanation of Time Selector Block in G.8273.2 Functional Model     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 239 ]  
 
Network limit and HRM hops of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 238 ]  
 
HRM2 SyncE transients of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 236 ]  
 
Proposed text in G.MDSP     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2013-06-17
[ 228 ]  
 
Extension of OTN hybrid equipment     China Mobile Communications Corporation , China Unicom , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 227 ]  
 
Enhancements of OTN hybrid equipment     China Mobile Communications Corporation , China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15, Q10/15   2013-06-17
[ 226 ]  
 
Multilayer protocol stack of OTN interface     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 225 ]  
 
Comparison of OTU4Cn vs OTUCn     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 224 ]  
 
Beyond 100G use case and design considerations     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 223 ]  
 
Answers to B100G questions from Q11/15 rapporteur (TD22/GEN)     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2013-06-17
[ 222 ]  
 
Multi-carrier OCh signal and connection behaviour under optical layer faults     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2013-06-17
[ 221 ]  
 
Improving Power Saving Efficiency     China Telecommunications Corporation , Sigma Designs Israel S.D.I Ltd. , ZTE Corporation   Q18/15   2013-06-17
[ 212 ]  
 
The Coordination and Transformation of Time and Frequency Information of G.8273.2 T-BC Network Element     China Unicom   Q13/15   2013-06-17
[ 211 ]  
 
Relationship between networks PDV cumulative thresholds and 1pps performance in ITU-T Rec. G.8271.1     China Unicom   Q13/15   2013-06-17
[ 210 ]  
 
Propose about messaging behaviour of boundary clock in Multicast/Unicast network     China Unicom   Q13/15   2013-06-17
[ 209 ]  
 
Further clarification about application scenarios of new Metro DWDM     China Unicom , China Telecom , Ericsson , Fiberhome , Nokia Siemens Networks   Q6/15   2013-06-17
[ 208 ]  
 
Consideration on optical layer protection     China Unicom , Fiberhome , Nokia Siemens Networks   Q9/15   2013-06-17
[ 207 ]  
 
Proposal to add time related EVM parameters in G.698.2     China Unicom , Fiberhome   Q6/15   2013-06-17
[ 206 ]  
 
Proposal for adding skew parameters for 100Gbit/s DP-QPSK modulation format in G.698.2     China Unicom , Calnex   Q6/15   2013-06-17
[ 189 ]  
 
Multilayer protocol stack of OTN interface  
Withdrawn: Duplicate of C-0226
 
China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q11/15   2013-06-17
[ 187 ]  
 
Proposal on initiating a new work item on transport SDN  
Withdrawn: Duplicate of C-0148
 
China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ministry of Industry and Information Technology (MIIT) , Telecom Italia S.p.A. , ZTE Corporation   Q14/15, Q12/15   2013-06-17
[ 186 ]  
(Rev.1) 
Strategies for SDN control mode in IP and Optical coordinated networks     Ministry of Industry and Information Technology (MIIT) , China Telecom   Q14/15, Q12/15   2013-06-17
[ 151 ]  
 
The consideration on the interface between SDN controller and transport NE     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 150 ]  
 
The consideration on the relationship between the network operating system (OS) in SDN and EMS/NMS in transport network     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 149 ]  
 
Use cases for transport SDN     China Telecommunications Corporation   Q14/15, Q12/15   2013-06-16
[ 148 ]  
 
Proposal on initiating a new work item on transport SDN     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Telecom Italia S.p.A. , ZTE Corporation   Q14/15, Q12/15   2013-06-16
[ 147 ]  
 
T-GM: types, PRTC integration and performance     A1 Telekom Austria AG , China Mobile Communications Corporation , Deutsche Telekom AG , Orange   Q13/15   2013-06-16
[ 125 ]  
 
Proposed model for the OTUCn and OCh layer for OTN beyond 100G     China Telecommunications Corporation , China Unicom , ZTE Corporation   Q6/15, Q14/15, Q12/15, Q11/15   2013-06-15
[ 101 ]  
 
G.metro scope proposal     ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , Ericsson-LG , Italy , Nokia Siemens Networks GmbH & Co. KG , Telefon AB - LM Ericsson   Q6/15   2013-06-14
[ 66 ]  
(Rev.1-2) 
The research of the functions features of the transport network controller     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 61 ]  
(Rev.1-2) 
Proposal of research architecture for network management, controller and transport plane     China Unicom , FiberHome Technologies Group   Q14/15, Q12/15   2013-06-13
[ 53 ]  
 
Necessity to Support External Commands in ODU SMP Protocol     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q9/15   2013-06-13
[ 52 ]  
 
MPLS-TP shared ring protection(MSRP) implementation and test result     China Mobile Communications Corporation   Q9/15   2013-06-13
Results:61 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-25