Contributions
[ Source: Futurewei Technologies ] [ AI/Question: Q2/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2065 ]
|
Proposed future ONU management reference model in G.988
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-06 |
|
[ 2025 ]
|
Contributed text for a recommendation on Reach Extenders for XGS-PON
|
Futurewei Technologies US R&D Center
,
Orange
|
Q2/15
|
2016-09-05 |
|
[ 1944 ]
|
Technology review on transmitting 25 Gb/s over a single wavelength channel
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-02 |
|
[ 1941 ]
|
Proposal of a new PLOAM to reboot ONU in G.9807.1
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-02 |
|
[ 1940 ]
|
Proposal of a new supplement on 25 Gb/s transmission per wavelength
|
Broadcom Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
|
Q2/15
|
2016-09-02 |
|
[ 1939 ]
|
Channel Bonding Discussion in IEEE P802.3ca
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-09-02 |
|
[ 1729 ]
|
Dual-rate support in XGS-PON
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
Orange
,
ZTE Corporation
|
Q2/15
|
2016-02-02 |
|
[ 1723 ]
|
G.RoF system architecture
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-02-01 |
|
[ 1721 ]
|
Proposal for 10G burst profile in G.XGS-PON
|
Broadcom Corporation
,
Futurewei Technologies US R&D Center
|
Q2/15
|
2016-02-01 |
|
[ 1418 ]
|
Proposal for a Radio over Fiber recommendation
|
Futurewei Technologies
|
Q2/15
|
2015-06-09 |
|
[ 1244 ]
|
Comments to G.989.3 Draft 20150601
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2015-06-08 |
|
[ 1133 ]
|
Clause 17.1: Announcement
|
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-11-11 |
|
[ 995 ]
|
Proposal of G.989.2 Annex C, Wavelength-Routed PtP WDM PMD
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 993 ]
|
Proposal of G.989.2 Annex A PtP WDM PMD table parameter update with FEC enabled
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 985 ]
|
Power saving with channel selection
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 982 ]
|
Proposal of G.989.3 Annex H - PtP WDM Transmission Convergence Layer
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 979 ]
|
Proposal of G.989.3 Annex on "Transcoded Framing with FEC and OAM for PtP WDM TC"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 962 ]
|
A possible next stage of TWDM PON: 100G-PON
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 891 ]
|
Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 890 ]
|
Responses to the comments of Toshiaki Kuri on the Futurewei proposal entitled "Aggregated Analog Radio over Fiber (AA-ROF)"
No file provided
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 889 ]
|
Aggregated Analog Radio over Fiber (AA-ROF)
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-11-10 |
|
[ 709 ]
|
Comments on Clause 13 of G.989.3
|
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Verizon Communication Corporation
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 602 ]
|
Reusing PON-ID as TWDM channel ID
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 600 ]
|
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2014-03-10 |
|
[ 131 ]
|
Full capacity in NG-PON2 using line coding
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 130 ]
|
Proposal to study AWG based WDM PON proposal in mobile front-haul application
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 129 ]
|
On the editorial placement of NG-PON2 (TWDM) TC-layer specifications
|
Alcatel-Lucent USA Inc.
,
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 128 ]
|
On the concept of out-of-band ranging in TWDM PONs
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 127 ]
|
Impacts of line code change on G.989.2
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 117 ]
|
G.poc draft proposal
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
|
[ 116 ]
|
Proposal to replace NG-PON2 channel plan in Appendix VII of G.989.2 draft
|
ADVA Optical Networking
,
Futurewei Technologies US R&D Center
,
Gemfire Europe Limited
|
Q2/15
|
2013-06-15 |
|
[ 115 ]
|
Multiple rate TC extension for TWDM
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2013-06-15 |
Results:32 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):