International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:190 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 2127 ]  
 
Proposal to add a new information model controller component to G.cca     ZTE Corporation   Q14/15, Q12/15   2016-09-06
[ 2126 ]  
 
Proposal to enhance the description of the NOSM in G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-06
[ 2113 ]  
 
Incremental Query in SDN     ZTE Corporation   Q14/15, Q12/15   2016-09-06
[ 2112 ]  
 
Alarm Processing in Virtual Network     ZTE Corporation   Q14/15, Q12/15   2016-09-06
[ 2111 ]  
 
Transport network batch query and processing solution in SDN environment     ZTE Corporation   Q14/15, Q12/15   2016-09-06
[ 2110 ]  
(Rev.1) 
Transport synchronization message in FlexO interface     ZTE Corporation   Q13/15, Q11/15   2016-09-06
[ 2109 ]  
 
Overhead processing of FlexE and FlexO atomic function     ZTE Corporation   Q11/15   2016-09-06
[ 2097 ]  
(Rev.1) 
Basic requirements for channel bonding of NG-PON2     ZTE Corporation   Q2/15   2016-09-06
[ 2095 ]  
(Rev.1) 
Channel bonding establishment for NGPON2     ZTE Corporation   Q2/15   2016-09-06
[ 2093 ]  
(Rev.1) 
Big channel scheme for channel bonding of NG-PON2     ZTE Corporation   Q2/15   2016-09-06
[ 2092 ]  
(Rev.1) 
proposal for 25G PON     ZTE Corporation   Q2/15   2016-09-06
[ 2090 ]  
 
Attributes for SyncE extended SSM     ZTE Corporation   Q14/15, Q13/15   2016-09-06
[ 2088 ]  
(Rev.1) 
Synchronization OAM     ZTE Corporation   Q14/15, Q13/15   2016-09-06
[ 2057 ]  
 
Proposal on new Recommendation "Optical fibre cables for in-home directly wall surface applications"     China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q16/15   2016-09-05
[ 2047 ]  
 
Wavelength plan consideration of G.metro     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2045 ]  
 
Proposal to study OSNR related issues of beyond 100G physical interface     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2039 ]  
 
G.Fast: Application reference model(s) for coax     ZTE Corporation   Q4/15   2016-09-05
[ 2038 ]  
 
G.Fast: Indication of QoS queues status for DTA control     ZTE Corporation   Q4/15   2016-09-05
[ 2037 ]  
 
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables     ZTE Corporation   Q4/15   2016-09-05
[ 2036 ]  
 
G.Fast: Consideration for signalling mechanism of DTA updates     ZTE Corporation   Q4/15   2016-09-05
[ 2035 ]  
 
G.fast: Considerations on pre-coding of 212MHz profile     ZTE Corporation   Q4/15   2016-09-05
[ 1954 ]  
 
Synchronization management model, comments on TD549/WP3 Rev.1     ZTE Corporation   Q14/15, Q13/15   2016-09-02
[ 1953 ]  
(Rev.1) 
Proposal for an information model for media     ZTE Corporation   Q14/15, Q12/15   2016-09-02
[ 1952 ]  
 
Proposals to update draft Recommendation G.cca to describe ODUflex     ZTE Corporation   Q14/15, Q12/15   2016-09-02
[ 1951 ]  
 
Proposed new text for clause 7.4 of G.cca     ZTE Corporation   Q14/15, Q12/15   2016-09-02
[ 1950 ]  
 
Proposal to add an appendix to G.872 to describe FlexE     ZTE Corporation   Q12/15, Q11/15   2016-09-02
[ 1949 ]  
 
Replacement text for Appendix II of G.872     ZTE Corporation   Q12/15   2016-09-02
[ 1948 ]  
 
Proposal to update clause 11 "OTN survivability techniques" in G.872     ZTE Corporation   Q9/15, Q12/15, Q11/15   2016-09-02
[ 1947 ]  
 
Replacement text for clause 10 of G.872     ZTE Corporation   Q12/15   2016-09-02
[ 1946 ]  
 
Proposal to add a description of the use of FlexO in G.872     ZTE Corporation   Q12/15, Q11/15   2016-09-02
[ 1945 ]  
 
Proposed modification to Clause 8 of G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-02
[ 1940 ]  
 
Proposal of a new supplement on 25 Gb/s transmission per wavelength     Broadcom Corporation , China Telecommunications Corporation , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , ZTE Corporation   Q2/15   2016-09-02
[ 1933 ]  
 
considerations about the wavelength plan of G.metro     ZTE Corporation   Q6/15   2016-09-02
[ 1932 ]  
 
Considerations on the EVM in the G.698.2     ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-02
[ 1785 ]  
 
Alarm processing in G.asdtn and G.gim     ZTE Corporation   Q14/15, Q12/15   2016-02-02
[ 1766 ]  
 
XGS-PON TC considerations on XGS-PON and XG-PON1 co-existence     ZTE Corporation , China Unicom   Q2/15   2016-02-02
[ 1764 ]  
 
Proposal for NG-PON2 amendment on channel bonding     ZTE Corporation   Q2/15   2016-02-02
[ 1763 ]  
 
Comments on G.988 Amendment 2     ZTE Corporation   Q2/15   2016-02-02
[ 1762 ]  
 
Comments on G.988 Amendment 1     ZTE Corporation   Q2/15   2016-02-02
[ 1761 ]  
 
Proposal of line coding for 25Gb channel rate     ZTE Corporation   Q2/15   2016-02-02
[ 1758 ]  
 
DNI protection method in G.MDSP     ZTE Corporation   Q9/15   2016-02-02
[ 1729 ]  
 
Dual-rate support in XGS-PON     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Futurewei Technologies US R&D Center , Huawei Technologies Co., Ltd. , Orange , ZTE Corporation   Q2/15   2016-02-02
[ 1686 ]  
 
Eye diagram Mask for XGS-PON     Huawei Technologies Co., Ltd. , China Telecommunications Corporation , ZTE Corporation   Q2/15   2016-02-01
[ 1683 ]  
 
Text for clause 9 of G.872     ZTE Corporation   Q12/15   2016-02-01
[ 1682 ]  
 
Text for clause 8 of G.872     ZTE Corporation   Q12/15   2016-02-01
[ 1681 ]  
 
Text for clause 7 of G.872     ZTE Corporation   Q12/15   2016-02-01
[ 1679 ]  
 
Proposal to modify the question text for Q12 in the next study period     ZTE Corporation   Q12/15   2016-02-01
[ 1678 ]  
 
Information model for the NE synchronization functions     ZTE Corporation   Q14/15, Q13/15   2016-02-01
[ 1661 ]  
 
G.Fast: Requirements for operation on copper lines extended to include coaxial cables     ZTE Corporation   Q4/15   2016-02-01
[ 1660 ]  
 
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax     ZTE Corporation   Q4/15   2016-02-01
Results:190 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-11-18