International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 9 : Meeting 2019-06-06 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 9  TD (2019-06-06) 

ITU-T SG 9

Broadband cable and TV

Study Period 2017

Meeting  from 2019-06-06 to 2019-06-13

held in Switzerland [Geneva]

Other Meetings : 2021-11-15  2021-04-19  2021-01-26  2020-11-25  2020-07-07  2020-06-23  2020-04-16  [ 2019-06-06 ]  2018-11-21  2018-01-22  2017-05-24 

Results:23 total items.
Temporary Documents  (GEN)  [ AI/Question: Q9/9 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 666-GEN ]  
 
LS/o on ITU-T Recommendation Y.3172 "Architectural framework for machine learning in future networks including IMT-2020" [to ITU-T SG13]     ITU-T SG9   Q9/9   2019-06-12
[ 665-GEN ]  
(Rev.1) 
LS/o on FG-VM, "Use Cases and Requirements for the Vehicular Multimedia Networks" [to ITU-T FG-VM]     ITU-T SG9   Q9/9   2019-06-12
[ 664-GEN ]  
(Rev.1) 
Report of Working Party 2/9 meeting     Chairman WP2/9   Q9/9, Q8/9, Q7/9, Q6/9, Q5/9   2019-06-12
[ 657-GEN ]  
 
Draft agenda of WP2/9 Closing Plenary     Chairman WP2/9   Q9/9, Q8/9, Q7/9, Q6/9, Q5/9   2019-06-12
[ 652-GEN ]  
 
Presentation - Joint session between Q9/9 and Q8/16 on AR, VR and ILE (11 June 2019)     Rapporteur Q9/9   Q9/9   2019-06-12
[ 651-GEN ]  
 
Output - Draft Technical Paper TP.b-catv "Integrated Broadcast-Broadband digital TV application cooperated with server for functional extension including functions of digital TV reception and processing" for processing     Editor   Q9/9   2019-06-12
[ 650-GEN ]  
 
Output - Collection of issues for Question 9/9 (Issues list)     Rapporteur Q9/9   Q9/9   2019-06-12
[ 639-GEN ]  
 
Output - Draft new Recommendation J.cable-ott "Possible patterns of a cable television operator's business relationship and interface with an over-the-top (OTT) service provider"     Rapporteur Q9/9   Q9/9   2019-06-11
[ 629-GEN ]  
 
Report of Question 9/9 meeting "Requirements, methods, and interfaces of the advanced service platforms to enhance the delivery of sound, television, and other multimedia interactive services over cable television network"     Rapporteur Q9/9   Q9/9   2019-06-11
[ 604-GEN ]  
 
Question report and agenda skeleton templates     TSB   Q9/9, Q8/9, Q7/9, Q6/9, Q5/9, Q4/9, Q2/9, Q10/9, Q1/9   2019-06-05
[ 603-GEN ]  
(Rev.1) 
Draft agenda of Question 9/9 "Requirements, methods, and interfaces of the advanced service platforms to enhance the delivery of sound, television, and other multimedia interactive services over cable television network"     Rapporteur Q9/9   Q9/9   2019-06-05
[ 599-GEN ]  
 
LS/r on the new draft recommendation J.cable-ott (SG9-LS73) [from ITU-T SG15]     ITU-T SG15   Q9/9   2019-05-30
[ 595-GEN ]  
 
ITU-R Report on "Artificial intelligence systems for programme production and exchange     ITU-R WP 6C   Q9/9, Q6/9, Q5/9, Q1/9   2019-05-24
[ 593-GEN ]  
(Rev.1) 
Consent -- J.1600 (ex J.pcnp-fmw): Premium Cable Network Platform (PCNP) - Framework (e meeting, 6 March 2019)     Editor   Q9/9   2019-05-21
[ 592-GEN ]  
 
Output - J.cable-ott "Possible patterns of a cable television operator's business relationship and interface with an over-the-top (OTT) service provider" (e-meeting, 6 March 2019)     Editor   Q9/9   2019-05-21
[ 582-GEN ]  
 
Report of Rapporteur meeting of Question 9/9 (Wuhan, China, 15-17 April 2019)     Rapporteur Q9/9   Q9/9   2019-04-18
[ 581-GEN ]  
 
Collection of issues for Question 9/9 (Issues list)     Rapporteur Q9/9   Q9/9   2019-04-18
[ 569-GEN ]  
 
LS/i/r on Amendment 1 to Recommendation ITU-T J.302 (2016) "System specifications of augmented reality smart television service" (reply to SG9-LS72) [from ITU-T SG16]     ITU-T SG16   Q9/9   2019-04-11
[ 565-GEN ]  
 
LS/i on information about consent of ITU-T Recommendation Y.3172 "Architectural framework for machine learning in future networks including IMT-2020" [from ITU-T SG 13]     ITU-T SG13   Q9/9   2019-04-11
[ 551-GEN ]  
(Rev.1) 
Report of Rapporteur meeting of Question 9/9 (e-meeting, 6 March 2019)     Rapporteur Q9/9   Q9/9   2019-03-12
[ 550-GEN ]  
 
ITU Kaleidoscope 2018 - Papers of interest to ITU-T Study Group 9     TSB   Q9/9, Q7/9   2019-03-12
[ 532-GEN ]  
 
Report of Rapporteur meeting of Question 9/9 (e-meeting, 14 January 2019)     Rapporteur Q9/9   Q9/9   2019-01-29
[ 531-GEN ]  
 
Output - Collection of issues for Question 9/9 "Issues list" (Output from Q9/9 e meeting, 14 January 2019)     Rapporteur Q9/9   Q9/9   2019-01-29
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-22