International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2017-07-12 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-WP2 (2017-07-12) 

ITU-T SG 11

Protocols and test specifications

Study Period 2017

Meeting  from 2017-07-12 to 2017-07-13

held in Switzerland [Geneva]

Other Meetings : 2021-12-01  2021-07-15  2021-03-17  2020-12-18  2020-12-04  2020-11-19  2020-07-22  2020-03-04  2019-10-16  2019-06-26  2019-03-06  2018-10-31  2018-07-18  2017-11-08  [ 2017-07-12 ]  2017-02-06 

Results:22 total items.
Temporary Documents  (WP2)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 22-WP2 ]  
(Rev.1) 
Draft report for Working Party 2/11 "Control and management protocols for IMT-2020" (Geneva, 13 July 2017)     Chairman WP2/11   Q8/11, Q7/11, Q6/11   2017-07-13
[ 21-WP2 ]  
(Rev.1) 
Agenda for WP2/11 "Control and management protocols for IMT-2020"     Chairman WP2/11   Q8/11, Q7/11, Q6/11   2017-07-13
[ 20-WP2 ]  
(Rev.1) 
Report of Rapporteur meeting of Question 8/11 (Geneva, 3-12 July 2017)     Rapporteur Q8/11   Q8/11   2017-07-13
[ 19-WP2 ]  
(Rev.1-2) 
Report of Q7/11 Rapporteur meeting "Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020" (Geneva, 3-12 July 2017)     Rapporteur Q7/11   Q7/11   2017-07-13
[ 18-WP2 ]  
 
Output-Draft Recommendation Q.MEA-SRA "Signalling requirement and architecture for media service entity attachment" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017)     Editors   Q7/11   2017-07-13
[ 17-WP2 ]  
(Rev.1) 
Output - Draft Recommendation ITU-T Q.NEA-REQ, "Signalling requirements of NFV entity management for network attachment " (Geneva, 3-12 July 2017)     Editors   Q7/11   2017-07-13
[ 16-WP2 ]  
 
Output - draft Recommendation Q.IEC-REQ, "Signalling requirement of intelligent edge computing" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017)     Editors   Q7/11   2017-07-13
[ 15-WP2 ]  
(Rev.1) 
Output - Draft Recommendation Q.SAN-MIM "Signalling requirements of SDN-based access networks with media independent management capabilities" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017)     Editors   Q7/11   2017-07-13
[ 14-WP2 ]  
 
Output - Draft Recommendation X.mp2p-msomp "Managed P2P communications: Multimedia streaming overlay management protocol"(03-12 July 2017)     Editors   Q8/11   2017-07-12
[ 13-WP2 ]  
 
Output - Initial draft Recommendation X.mp2p-cdp, "Managed P2P communications: Content distribution protocol (03-12 July 2017)     Editors   Q8/11   2017-07-12
[ 12-WP2 ]  
 
Output - Draft new Recommendation X.mp2p-mspp "Managed P2P communications: Multimedia streaming peer protocol" (03 - 12 July 2017)     Editors   Q8/11   2017-07-12
[ 11-WP2 ]  
(Rev.1) 
Consent - Draft new Recommendation ITU-T X.609.3 (ex X.mp2p-mssr) "Managed P2P communications: Multimedia streaming signalling requirements" (Geneva, 03 - 12 July 2017)     Editors   Q8/11   2017-07-12
[ 10-WP2 ]  
(Rev.1) 
LS/o on recent IMT-2020 development in SG11: one new work item in Q6/11 about protocol for network slice lifecycle management [to ITU-T SG13]     ITU-T SG11   Q6/11   2017-07-12
[ 9-WP2 ]  
 
Output - Initial draft Recommendation ITU-T Q.NS-LCMP, "Protocol for network slice lifecycle management" (Geneva, 03-12 July 2017)     Editors   Q6/11   2017-07-11
[ 8-WP2 ]  
 
Report of Rapporteur meeting of Question 6/11 (Geneva, 3-12 July 2017)     Rapporteur Q6/11   Q6/11   2017-07-11
[ 7-WP2 ]  
 
Incoming LS for WP2/11     TSB   Q8/11, Q7/11, Q6/11   2017-06-29
[ 6-WP2 ]  
 
Report of Rapporteur meeting of Question 8/11 (e-meeting, 22-26 May 2017)     Rapporteur Q8/11   Q8/11   2017-06-07
[ 5-WP2 ]  
 
Output - Draft new Recommendation X.mp2p-msomp "Managed P2P communications: Multimedia streaming overlay management protocol" (E-meeting, 22 - 26 May 2017)     Editors   Q8/11   2017-06-05
[ 4-WP2 ]  
 
Consent - Draft new Recommendation X.mp2p-mssr "Managed P2P communications: Multimedia streaming signalling requirements" (E-meeting, 22 - 26 May 2017)     Editors   Q8/11   2017-06-05
[ 3-WP2 ]  
 
Output - Draft new Recommendation X.mp2p-mspp "Managed P2P communications: Multimedia streaming peer protocol" (E-meeting, 22 - 26 May 2017)     Editors   Q8/11   2017-06-05
[ 2-WP2 ]  
 
List of participants     TSB   QALL/11   2017-05-08
[ 1-WP2 ]  
(Rev.1-2) 
Draft time plan of Rapporteur group meetings and WP1, WP2 meetings (Geneva, 3-13 July 2017)     TSB   Q8/11, Q7/11, Q6/11   2017-05-15
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-8-9