International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2019-03-06 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD (2019-03-06) 

ITU-T SG 11

Protocols and test specifications

Study Period 2017

Meeting  from 2019-03-06 to 2019-03-15

held in Switzerland [Geneva]

Other Meetings : 2021-12-01  2021-07-15  2021-03-17  2020-12-18  2020-12-04  2020-11-19  2020-07-22  2020-03-04  2019-10-16  2019-06-26  [ 2019-03-06 ]  2018-10-31  2018-07-18  2017-11-08  2017-07-12  2017-02-06 

Results:11 total items.
Temporary Documents  (GEN)  [ AI/Question: Q3/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 786-GEN ]  
 
Draft Report for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 6-15 March 2019)     Chairman WP1/11   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2019-03-10
[ 773-GEN ]  
 
Draft Report of Q3/11 meeting "Signalling requirements and protocols for emergency telecommunications" (Geneva, 6-15 March 2019)     Acting Rapporteur Q2/11   Q3/11   2019-03-10
[ 770-GEN ]  
 
LS/o/r on disaster relief use cases (reply to ITU-D SG2RGQ/088-E) [to ITU-D SG02]     ITU-T SG11   Q3/11   2019-03-10
[ 769-GEN ]  
 
Output - draft Recommendation ITU-T Q.ETN-DS "Signalling architecture of the fast deployment emergency telecommunication network to be used in a natural disaster"     Editors   Q3/11   2019-03-10
[ 768-GEN ]  
 
Output - draft Supplement Q.suppl.Multi_Device_ETS "Signalling requirements for VoLTE-based network and GSM/UMTS network supporting Multi-device emergency telecommunications service" (Geneva, 6-15 March 2019)     Editors   Q3/11   2019-03-10
[ 756-GEN ]  
 
Agenda for WP1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 5-16 March 2019)     Chairman WP1/11   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2019-03-05
[ 743-GEN ]  
 
Agenda for Q3/11 "Signalling requirements and protocols for emergency telecommunications" (Geneva, 6-15 March 2019)     Rapporteur Q3/11   Q3/11   2019-03-05
[ 706-GEN ]  
 
LS/i/r on disaster relief use cases (reply to SG11 LS47) [from ITU-D Q5/2]     ITU-D Q5/2   Q3/11   2018-11-23
[ 666-GEN ]  
 
Output - draft Supplement Q.suppl.Multi_Device_ETS "Signalling requirements for VoLTE-based network and GSM/UMTS network supporting Multi-device emergency telecommunications service" (Geneva, 22-31 October 2018)     Editors   Q3/11   2018-10-31
[ 665-GEN ]  
(Rev.1) 
Draft Report of Rapporteur meeting of Question 3/11 (Geneva, 22-31 October 2018)     Acting Rapporteur Q3/11   Q3/11   2018-10-31
[ 664-GEN ]  
 
Output - Initial text of " Q.suppl.ETS_Multi_Access: Signalling requirements for IMS emergency telecommunications service in support of multiple accesses", Geneva, 22-31 October 2018     Editors   Q3/11   2018-10-31
Results:11 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-9