International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2020-07-20 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  TD-WP1 (2020-07-20) 

ITU-T SG 13

Future networks

Study Period 2017

Meeting  from 2020-07-20 to 2020-07-31

held in E-Meeting

Other Meetings : 2021-11-29  2021-07-16  2021-03-01  2020-12-17  2020-12-07  [ 2020-07-20 ]  2020-03-13  2019-10-14  2019-06-28  2019-03-04  2018-11-02  2018-07-16  2018-04-18  2017-11-06  2017-07-14  2017-02-06 

Results:21 total items.
Temporary Documents  (WP1)  [ AI/Question: 1/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 648-WP1 ]  
(Rev.1) 
Agenda of the Closing Plenary of WP1/13 (Virtual, 20-31 July 2020)     WP1/13 Co-Chairmen   Q6/13, Q23/13, Q22/13, Q21/13, Q20/13   2020-07-30
[ 623-WP1 ]  
 
Meeting report of Q21 (Virtual, 20 - 31 July 2020)     Co-Rapporteurs   Q21/13   2020-07-28
[ 622-WP1 ]  
 
LS/o on the consent of a new Recommendation ITU-T Y.3156 (formerly Y.IMT2020-NSAA-reqts): "Framework of network slicing with AI-assisted analysis in IMT-2020 networks"     Co-Rapporteurs   Q21/13   2020-07-28
[ 621-WP1 ]  
 
Draft new Recommendation ITU-T Y.IMT2020-NSC: "IMT-2020 network slice configuration"     Editor   Q21/13   2020-07-28
[ 620-WP1 ]  
(Rev.1) 
Initial draft new Recommendation Y.IMT-2020-EIL:"Evaluating intelligence capability for network slice management and orchestration in IMT-2020"     Editors   Q21/13   2020-07-28
[ 619-WP1 ]  
 
Initial draft new Recommendation ITU-T Y.DL-AINW-fra: "Framework for data linkage between AI-based network slice management and orchestration and network slice customers in networks beyond IMT-2020"     Editors   Q21/13   2020-07-28
[ 618-WP1 ]  
 
Draft new Recommendation ITU-T Y.SLOA-arch: "End-to-end service level objective assurance architecture for future networks including IMT-2020"     Co-editors   Q21/13   2020-07-28
[ 617-WP1 ]  
 
Draft new Recommendation ITU-T Y.NSL-fra: "Framework for classifying network slice level in future networks including IMT-2020"     Co-editors   Q21/13   2020-07-28
[ 616-WP1 ]  
 
Draft new Recommendation ITU-T Y.LSMEC: "Local shunting for multi-access edge computing in IMT-2020 networks"     Editors   Q21/13   2020-07-28
[ 615-WP1 ]  
 
Draft new Recommendation ITU-T Y.3156 (formerly Y.IMT2020-NSAA-reqts): "Framework of network slicing with AI-assisted analysis in IMT-2020 networks"     Editors   Q21/13   2020-07-28
[ 614-WP1 ]  
 
Draft revised Recommendation ITU-T Y.3150: "High-level technical characteristics of network softwarization for IMT-2020"     Co-editors   Q21/13   2020-07-28
[ 584-WP1 ]  
 
Agenda of WP1/13 Plenary meeting (Virtual, 20-31 July 2020)     WP1/13 Co-Chairman   Q6/13, Q23/13, Q22/13, Q21/13, Q20/13   2020-07-20
[ 580-WP1 ]  
 
Draft agenda of Q21/13 (Virtual, 20-31 July 2020)     Co-Rapporteurs   Q21/13   2020-07-17
[ 579-WP1 ]  
 
FG ML5G Technical Specification "Vertical-assisted Network Slicing Based on a Cognitive Framework"     ITU-T FG ML5G   Q6/13, Q21/13, Q20/13   2020-06-22
[ 578-WP1 ]  
 
FG ML5G Technical Specification "Requirements, architecture, and design for machine learning function orchestrator"     ITU-T FG ML5G   Q21/13, Q20/13   2020-06-22
[ 577-WP1 ]  
 
FG ML5G Technical Specification "Machine learning based end-to-end network slice management and orchestration"     ITU-T FG ML5G   Q6/13, Q21/13, Q20/13   2020-06-22
[ 574-WP1 ]  
 
Gap Analysis: next steps in integrating machine learning in future networks including IMT-2020     ITU-T FG ML5G   Q21/13, Q20/13   2020-06-22
[ 571-WP1 ]  
 
LS/i on ongoing work within ITU-T Study Group 3 (SG3) on new Technical Report on "IMT2020-Related Policy Considering MVNOs" [from WP2/3]     WP2/3   Q22/13, Q21/13, Q20/13   2020-06-02
[ 570-WP1 ]  
 
Draft new Recommendation ITU-T Y.IMT2020-NSAA-reqts: "Requirements for network slicing with AI-assisted analysis in IMT-2020 networks" (output of e-meeting, 18-22 May 2020)     Editors   Q21/13   2020-05-26
[ 569-WP1 ]  
 
Meeting report of Q21/13 (e-meeting, 18-22 May 2020)     Co-Rapporteurs   Q21/13   2020-05-26
[ 552-WP1 ]  
 
LS/i/r on development of a draft new report ITU-R M.[IMT.C-V2X] - Application of the Terrestrial Component of IMT for Cellular-V2X (reply to SG13-LS122) [from ITU-R WP 5D]     ITU-R WP 5D   Q23/13, Q22/13, Q21/13, Q20/13   2020-04-15
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-31