International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2024-06-17 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2024-06-17) 

ITU-T SG05

EMF, environment, climate action, sustainable digitalization, and circular economy

Study Period 2022

Meeting  from 2024-06-17 to 2024-06-21

held in Poland [Wroclaw]

Other Meetings : 2023-11-13  2023-06-13  2023-02-09  2022-12-05  2022-10-17  2022-06-21 

Results:7 total items.
Contributions  [ Source: Huawei Technologies Co., Ltd. (China) ]  [ AI/Question: Q6/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 601 ]  
(Rev.1) 
Proposals for draft Supplement ITU-T L.Sup.MDEE "Study of Multi-dimensional network energy efficiency metrics"     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q6/5   2024-06-04
[ 600 ]  
(Rev.1) 
Proposals for draft new Recommendation ITU-T L.FNEE "Assessment of Fixed Network Energy Efficiency"     Huawei Technologies Düsseldorf GmbH (Germany) , Huawei Technologies Co., Ltd. (China)   Q6/5   2024-06-04
[ 598 ]  
 
Proposals for draft revised Recommendation ITU-T L.1310rev "Energy efficiency metrics and measurement methods for telecommunication equipment"     Cisco Systems, Inc. (United States) , Huawei Technologies Co., Ltd. (China) , Telefon AB - LM Ericsson (Sweden)   Q6/5   2024-06-04
[ 597 ]  
(Rev.1) 
Proposed new work item on "Design of Sustainable AI-based and XR-based Systems"     Consorzio Nazionale Interuniversitario per le Telecomunicazioni CNIT (Italy) , Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany) , Telecom Italia S.p.A. (Italy)   Q6/5   2024-06-04
[ 593 ]  
(Rev.1) 
Proposal Baseline text of draft Recommendation ITU-T L.MCI_BAT: "Monitoring and control interface for infrastructure equipment (Power, Cooling and environment systems used in telecommunication networks) - Battery system with integrated control and monitoring information model     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q6/5   2024-06-04
[ 566 ]  
(Rev.1) 
Proposal Baseline text of draft Recommendation ITU-T L.MCI_MIM: "Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) - ICT equipment power, energy and environmental parameters monitoring information model"     Huawei Technologies Co., Ltd. (China) , Huawei Technologies Düsseldorf GmbH (Germany)   Q6/5   2024-06-04
[ 516 ]  
(Rev.1) 
Proposal Baseline draft Recommendation ITU-T L.MCI_Gen: "Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) - Generic Interface"     Huawei Technologies Düsseldorf GmbH (Germany) , Huawei Technologies Co., Ltd. (China)   Q6/5   2024-06-03
Results:7 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-5