International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2022-12-07 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-WP1 (2022-12-07) 

ITU-T SG 11

Protocols and test specifications

Study Period 2022

Meeting  from 2022-12-07 to 2022-12-07

held in Switzerland [Geneva]

Other Meetings : 2024-05-01  2024-02-07  2023-10-10  2023-05-10  [ 2022-12-07 ]  2022-07-06 

Results:11 total items.
Temporary Documents  (WP1)  [ Source: Rapporteur ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 89-WP1 ]  
 
Living list of Q5/11 (Geneva, 28 November - 7 December 2022)     Rapporteur Q5/11   Q5/11   2022-12-05
[ 79-WP1 ]  
 
Living list of Q2/11 (Geneva, 28 November - 7 December 2022)     Rapporteur Q2/11   Q2/11   2022-12-02
[ 48-WP1 ]  
 
Living list of Q3/11 (Geneva, 28 November - 7 December 2022)     Rapporteur Q3/11   Q3/11   2022-12-02
[ 35-WP1 ]  
 
Draft Report of interim RGM meeting Q5/11 "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (Geneva, 28 November - 7 December 2022)     Rapporteur Q5/11   Q5/11   2022-10-18
[ 34-WP1 ]  
 
Draft Report of interim RGM meeting Q4/11 "Protocols for control, management and orchestration of network resources" (Geneva, 28 November - 7 December 2022)     Rapporteur Q4/11   Q4/11   2022-10-18
[ 33-WP1 ]  
(Rev.1) 
Draft Report of interim RGM meeting Q3/11 "Signalling requirements and protocols for emergency telecommunications" (Geneva, 28 November - 7 December 2022)     Rapporteur Q3/11   Q3/11   2022-10-18
[ 32-WP1 ]  
 
Draft Report of interim RGM meeting Q2/11 "Signalling requirements and protocols for services and applications in telecommunication environments" (Geneva, 28 November - 7 December 2022)     Rapporteur Q2/11   Q2/11   2022-10-18
[ 31-WP1 ]  
 
Draft Report of interim RGM meeting Q1/11 "Signalling and protocol architectures for telecommunication networks and guidelines for implementations" (Geneva, 28 November - 7 December 2022)     Rapporteur Q1/11   Q1/11   2022-10-18
[ 12-WP1 ]  
 
Draft Report of Q5/11 Interim Rapporteur Group meetings "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (e-meeting, 15-16 September 2022)     Rapporteur Q5/11   Q5/11   2022-10-11
[ 9-WP1 ]  
 
Draft Report of interim Q3/11 Rapporteur Group e-meeting "Signalling requirements and protocols for emergency telecommunications" (13-14 September 2022)     Rapporteur Q3/11   Q3/11   2022-09-14
[ 7-WP1 ]  
 
Draft Report of interim Q4/11 RGM "Protocols for control, management and orchestration of network resources" (e-meeting, 6-8 September 2022)     Rapporteur Q4/11   Q4/11   2022-09-13
Results:11 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-7-26