International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2022-09-19 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2022-09-19) 

ITU-T SG15

Transport, access and home

Study Period 2022

Meeting  from 2022-09-19 to 2022-09-30

held in Switzerland [Geneva]

Other Meetings : 2024-07-01  2023-11-20  2023-04-17 

Results:79 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 288 ]  
 
Beyond 800G format considerations     Nokia USA (United States)   Q11/15   2022-09-06
[ 287 ]  
 
B400G Objectives     Nokia USA (United States)   Q11/15   2022-09-06
[ 286 ]  
 
G.798 clarifications     Nokia USA (United States)   Q14/15, Q11/15   2022-09-06
[ 285 ]  
 
Clarifying the functional models for IMP mapping of packet traffic     Nokia USA (United States)   Q11/15, Q10/15   2022-09-06
[ 282 ]  
 
Single-lane OTU4 interfaces (OTL4.1)     Nokia Corporation (Finland) , Nokia USA (United States)   Q6/15, Q11/15   2022-09-06
[ 281 ]  
 
Comments on Draft G.8321 (TD6/P)     Nokia USA (United States)   Q11/15   2022-09-06
[ 280 ]  
 
VC-n clients and sub1G paths     Nokia USA (United States)   Q11/15   2022-09-06
[ 278 ]  
 
Work items for sub1G transport     Nokia USA (United States)   Q14/15, Q13/15, Q12/15, Q11/15   2022-09-06
[ 277 ]  
 
Common sub1G path layer considerations     Nokia USA (United States)   Q11/15   2022-09-06
[ 276 ]  
 
Sub1G over MTN architecture     Nokia USA (United States)   Q12/15, Q11/15   2022-09-06
[ 275 ]  
 
OTN server layers for sub1G traffic     Nokia USA (United States)   Q11/15   2022-09-06
[ 274 ]  
 
Consideration on mapping Packet client into OSU via IMP     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 273 ]  
 
Consideration on mapping CBR client into OSU via GMP     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 271 ]  
 
TS interleaving width proposal for OSU     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 270 ]  
 
Proposed text for revision of G.Sup58 (OTL4.2)     Infinera Corporation (United States)   Q11/15   2022-09-06
[ 269 ]  
 
OSU overhead analysis and consideration     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 267 ]  
 
OSU frame format analysis and consideration     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 261 ]  
 
Mapping analysis and consideration of OSU over OPU     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 260 ]  
 
B400G discussion of the frame of a possible cross-digital and optical layer hitless rate adjustable OTN interface     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 259 ]  
 
Proposed text modifications for Draft G.8321 - Characteristics of MTN equipment functional blocks     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q11/15   2022-09-06
[ 255 ]  
 
Analysis of GMP scheme applied into resizing     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 254 ]  
 
Latency and implementation complexity analysis of OSU with different TS interleaving widths     ZTE Corporation (China) , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2022-09-06
[ 253 ]  
 
Consideration of OSU multiplexing structure identifier     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2022-09-06
[ 252 ]  
 
Consideration of real-time indication for OSU mapping and multiplexing     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q11/15   2022-09-06
[ 236 ]  
 
Transparent mode for GCC0     ZTE Corporation (China) , China Mobile Communications Co. Ltd.   Q14/15, Q11/15   2022-09-06
[ 232 ]  
 
B400G OTN short reach interface solution     ZTE Corporation (China)   Q11/15   2022-09-06
[ 230 ]  
 
Analysis on B400G OTN error marking mechanism     China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q11/15   2022-09-06
[ 228 ]  
 
A proposal to solve the undesirable dMSIM and service interruption     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , ZTE Corporation (China)   Q11/15   2022-09-06
[ 227 ]  
 
Consideration on MTN fine granularity frame size     China Mobile Communications Co. Ltd.   Q11/15   2022-09-06
[ 214 ]  
 
Proposals to solve open issues in G.8321     ZTE Corporation (China)   Q11/15   2022-09-06
[ 207 ]  
 
Mapping OSU into OSTUF     China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 206 ]  
 
Consideration on Ethernet-optimized FlexO     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q11/15   2022-09-06
[ 205 ]  
 
A new OSTU structure for multiplexing OSU into OPU     China Telecommunications Corporation , China Unicom , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 204 ]  
 
Consideration on direct ODUk multiplexing into FlexO-n     Nippon Telegraph and Telephone Corporation (NTT) (Japan) , Orange (France)   Q11/15   2022-09-06
[ 203 ]  
 
B400G OTN application scenario and requirements     Nippon Telegraph and Telephone Corporation (NTT) (Japan) , Orange (France)   Q11/15   2022-09-06
[ 202 ]  
 
Considerations on PKT mapping into OSU     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 201 ]  
 
Considerations on OSU solution     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 189 ]  
 
Analysis of MTN sub1G from architecture perspective     Ministry of Industry and Information Technology (MIIT) (China) , China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q12/15, Q11/15   2022-09-06
[ 188 ]  
 
Some considerations on MTN Sub-1G     ZTE Corporation (China)   Q11/15   2022-09-06
[ 185 ]  
 
Analysis of interleaving granularity for MTN Sub-1G     China Mobile Communications Co. Ltd. , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 182 ]  
 
Requirements of hitless bandwidth resizing     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 180 ]  
 
MTN fine granularity layer interleaving basic unit and interleaving length discussion     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 178 ]  
 
MTN sub1G OAM solution     China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 177 ]  
 
Proposal to develop new work item on fine granularity MTN     Broadcom Corporation (United States) , China Electric Power Research Institute , China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2022-09-06
[ 152 ]  
 
Evaluation on Updating Architectural and Management recommendations for G.osu     China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q14/15, Q12/15, Q11/15   2022-09-05
[ 136 ]  
 
Consideration of timing for CBR over OSU     China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China)   Q13/15, Q11/15   2022-09-05
[ 135 ]  
 
Elaboration of MTN fine granularity hitless resizing requirements     Huawei Technologies Co., Ltd. (China)   Q11/15   2022-09-05
[ 134 ]  
 
Draft Recommendation outline for "Interfaces for Fine granularity Metro Transport Network Layer"     Huawei Technologies Co., Ltd. (China)   Q11/15   2022-09-05
[ 133 ]  
 
A comparison Table for a single layer vs two layers for fgMTN and OSU     Huawei Technologies Co., Ltd. (China)   Q11/15   2022-09-05
[ 132 ]  
 
Consideration on the length of pseudo 66B encoded MAC frame multiplex structure     Huawei Technologies Co., Ltd. (China)   Q11/15   2022-09-05
Results:79 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-10-20