Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones : 300 Nuevo -  Busque los documentos de la reunión
   
[300]  On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Formato

Tamaño

Puesta a disposición

English

Zip (Document)  

1078356 octetos 0001-10-3 [300] - [4A/300] On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]
 

Documento :

UIT-R WP4A  Contribución  300

Título :

On the use of simulation techniques to verify compliance of non-GSO FSS satellite systems with the additional operational limits to epfd down and proposed modification of PDNR S.[4A/TEMP/100]

Recibido en :

2001-10-03

Origen :

United Kingdom of Great Britain and Northern Ireland

Reunión :

2001-10-03

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2002-07-19