Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : TG1/9 : Contribuciones : 55 Nuevo -  Busque los documentos de la reunión
   
[55]  Report on the meeting of Task Group 1/9, 14-17 February 2005

Formato

Tamaño

Puesta a disposición

English

Word  

69632 octetos 2005-03-10 [55] Annex 22- Liaison statement to WP 4A and to WP 7B for information - Parameters for compatibility analyses between the fixed-satellite service and the inter-satellite service with the Earth exploration-satellite service (passive)

Word  

450560 octetos 2005-03-10 [55] Annex 21- Liaison statement to WPs 4A and 6S and to WPs 7D and 8D for information - Representations of unwanted emission spectra for use in compatibility studies between active satellite services and passive services

Word  

65536 octetos 2005-03-10 [55] Annex 20- Liaison statement to Working Party 8B and for information to JRG 1A-1C-8B - Compatibility analysis between the Earth exploration-satellite (passive) service systems operating in the 1 400-1 427 MHz band and radiolocation service systems operating in the

Word  

54272 octetos 2005-03-9 [55] Annex 19- Liaison statement to Working Party 7C - Apportionment of interference criteria of Recommendation ITU-R SA.1029

Word  

479744 octetos 2005-03-10 [55] Annex 18- Liaison statement to Working Parties 9B and 9D - Representation of unwanted emission spectra and transmitter deployment models for use in compatibility studies between active and passive services

Word  

535552 octetos 2005-03-9 [55] Annex 17- Working document on GLONASS unwanted emissions in the band 1 610.6-1 613.8 MHz

Word  

748032 octetos 2005-03-9 [55] Annex 16- Working document towards a revision of Annex 5 of Recommendation ITU-R SM.1633 - Compatibility analysis between radio astronomy service systems operating in the 1 610.6-1 613.8 MHz band and radionavigation satellite service systems operating in the 1 559-

Word  

192512 octetos 2005-03-9 [55] Annex 15- Annex [RAS-5] - Compatibility analysis between radio astronomy service systems operating in the 1 400-1 427 MHz and 1 610.6-1 613.8 MHz bands and non-GSO mobile-satellite service (space-to-Earth) systems operating in the 1 525-1 559 MHz band

Zip (Document)  

138225 octetos 2005-03-9 [55] Annex 14- Annex [RAS-4] - Compatibility analysis between radio astronomy service systems operating in the 608-614 MHz band and broadcasting-satellite service (space-to-Earth) systems that may operate in the 620-790 MHz band

Word  

542720 octetos 2005-03-9 [55] Annex 13- Annex [RAS-3] - Compatibility analysis between radio astronomy service systems operating in the 406.1-410 MHz band and mobile-satelilte service (space-to-Earth) systems operating in the 400.15-401 MHz band

Word  

199680 octetos 2005-03-9 [55] Annex 12- Annex [RAS-2] - Compatibility analysis between radio astronomy service systems operating in the 322-328.6 MHz band and mobile-satellite service (space-to-Earth) systems operating in the 387-390 MHz band

Word  

989184 octetos 2005-03-9 [55] Annex 11- Annex [RAS-1] - Compatibility analysis between radio astronomy service systems operating in the 150.05-153.0 MHz band and mobile-satellite service (space-to-Earth) systems operating in the 137-138 MHz band

Word  

123904 octetos 2005-03-8 [55] Annex 10- Working Document toward draft CPM text for WRC-07 Agenda item 1.21

Word  

724480 octetos 2005-03-9 [55] Annex 9- Working document - Proposed revision of Annex 20 to Recommendation ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and the FSS (Earth-to-space) and MSS (Earth-to-space) service systems...

Word  

271872 octetos 2005-03-9 [55] Annex 8- Working document towards a new Annex to Rec. ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (space-to-Earth) systems operating in the 49.44-50.2 GHz band

Word  

797184 octetos 2005-03-8 [55] Annex 7- Working document - Proposed revision of Annex 19 to Recommendation ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (Earth-to-space) systems operating in the 47.2-50.2 GHz band

Zip (Document)  

443133 octetos 2005-03-8 [55] Annex 7- Working document - Proposed revision of Annex 19 to Recommendation ITU-R SM.1633 - Compatibility analysis between EESS (passive) systems operating in the 50.2-50.4 GHz band and FSS (Earth-to-space) systems operating in the 47.2-50.2 GHz band

Word  

952320 octetos 2005-03-8 [55] Annex 6- Working Document - Proposed revision of Recommendation ITU-R SM.1633 (Annex 14) - Compatibility analysis between the EESS (passive) in the 31.3-31.5 GHz band and the FSS (Earth-to-space) and the MSS (Earth-to-space) in the 30-31 GHz band

Zip (Document)  

1481734 octetos 2005-03-8 [55] Annex 5- Working Document - Proposed revision of Annex 13 of Recommendation ITU-R SM.1633 - Compatibility analysis between the Earth exploration-satellite service (passive) in the 23.6-24 GHz band and the ISS in the 22.55-23.55 GHz band

Word  

1127424 octetos 2005-03-8 [55] Annex 4- Working document towards a draft revision of Recommendation ITU-R SM.1633 - Annex [FS-EESS-1.4 GHz/XXE1] - Compatibility analysis between the Earth exploration-satellite (passive) service in the 1 400-1 427 MHz band and the fixed service in the 1 350-1 40

Word  

1323520 octetos 2005-03-8 [55] Annex 3- Working document on the methodology to revise Annex 3 to Recommendation ITU-R SM.1633 : Compatibility analysis between the Earth exploration-satellite (passive) service systems operating in the 1 400-1 427 MHz band and radiolocation service systems operat

Word  

643072 octetos 2005-03-7 [55] Annex 2- Working document toward draft revision of Annex 1 to Recommendation ITU-R SM.1633 ("Methodology")

Word  

81408 octetos 2005-03-7 [55] Annex 1- Working document toward draft CPM text for WRC-07 Agenda item 1.20

Word  

227328 octetos 2005-03-10 [55] - Chairman's Report to TG 1/9 on its second meeting (14-18 February 2005)
 

Documento :

UIT-R TG1/9  Contribución  55

Título :

Report on the meeting of Task Group 1/9, 14-17 February 2005

Recibido en :

2005-03-07

Origen :

Chairman, TG 1/9

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2005-03-10