|
Formato |
Tamaño |
Puesta a disposición |
|
|
|
English |
Word
|
60928 octetos |
2005-12-07 |
[267] Annex 32- Liaison statement to Working Party 8D - Off-axis e.i.r.p. emissions in the presence of motion-induced antenna pointing errors |
|
Word
|
95232 octetos |
2005-12-07 |
[267] Annex 31- Liaison statement to WP 8B - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study |
|
Word
|
65024 octetos |
2005-12-07 |
[267] Annex 30- Liaison statement to the Working Party of the Special Committee - Coordination between transmitting aircraft mobile station and receiving FSS Earth station in the band 4 500-4 800 MHz
|
|
Word
|
77312 octetos |
2005-12-12 |
[267] Annex 29- Liaison statement to WP 8B - Sharing with Aeronautical Mobile Systems Preliminary draft Report, "Compatibility between proposed systems in the aeronautical mobile service and the existing fixed-satellite service in the 5 091 5 150 MHz band"
|
|
Word
|
69120 octetos |
2005-12-06 |
[267] Annex 28- Liaison statement to the Working Party of the Special Committee and to Working Party 6S - Coordination arc value for triggering the inter-service coordination between the BSS in Region 2 and the FSS (space-to-Earth) in Region 1 in the band 17.3-17.8 GHz
|
|
Word
|
65536 octetos |
2005-12-05 |
[267] Annex 27- Liaison statement to Working Parties 4-9S, 6S, 7B, 8D, 9D, and the coordination committee for vocabulary - Development of DNR S.[HEO_Sys_Char] Characterization of HEO-type FSS systems
|
|
Word
|
61440 octetos |
2005-12-05 |
[267] Annex 26- Liaison statement to Working Party 4-9S - HEO-Type FSS system characteristics to be used for analyzing interference to FS systems
|
|
Word
|
64000 octetos |
2005-12-05 |
[267] Annex 25- Liaison statement to Working Parties 4-9S, 6S, 7B and 8D - Preliminary draft letter to Director, BR on definition of HEO (AI 7.1 (H))
|
|
Word
|
108032 octetos |
2005-12-08 |
[267] Annex 24- Liaison statement to Task Group 1/9 - Comments on Document 4A/198 regarding the use of the OOB domain masks described in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1-9 (agenda item 1.20)
|
|
Word
|
80896 octetos |
2005-12-09 |
[267] Annex 23- Liaison statement to Task Group 1/9 - FSS models for use in compatibility studies relating to WRC-07 Agenda item 1.20 |
|
Word
|
60928 octetos |
2005-12-12 |
[267] Annex 22- Liaison statement to WP 7C - Draft revision to Recommendation ITU-R S.1427 |
|
Word
|
62464 octetos |
2005-12-07 |
[267] Annex 21- Liaison statement to Special Committee - Working document towards CPM text for the review of AP 30B (WRC-07 Agenda item 1.10)
|
|
Word
|
96256 octetos |
2005-12-07 |
[267] Annex 20- Liaison statement to Working Party 8F - Elements to be considered under WRC-07 Agenda item 1.4
|
|
Word
|
61952 octetos |
2005-12-09 |
[267] Annex 19- Draft liaison statement to WP 1A and TG 1/9 - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20) |
|
Word
|
61952 octetos |
2005-12-12 |
[267] Annex 19 Revision 1- Draft Liaison statement to Working Party 1A and Task Group 1/9 - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20) |
|
Word
|
61952 octetos |
2005-12-07 |
[267] Annex 18- Liaison statement to WP 6S - Possible methodology for frequency sharing between bi-directional FSS networks comprising ubiquitously deployed earth stations
|
|
Word
|
64512 octetos |
2005-12-07 |
[267] Annex 17- Liaison statement to Working Party 7B - Modifications to proposed draft elements for CPM text for WRC-07 Agenda item 1.2
|
|
Word
|
100352 octetos |
2005-12-07 |
[267] Annex 16- Elements for the Chairman's Report - Estimation of the main lobe of FSS Earth station antennas
|
|
Word
|
64000 octetos |
2005-12-07 |
[267] Annex 15- Elements for the Chairman's Report - Discussion on Recommendation ITU-R S.524
|
|
Word
|
110592 octetos |
2005-12-07 |
[267] Annex 14- Working document to record the results of review of ITU-R references to HEO
|
|
Word
|
81408 octetos |
2005-12-07 |
[267] Annex 13- Preliminary draft letter to the Director of the BR concerning the definition of HEO |
|
Word
|
69120 octetos |
2005-12-08 |
[267] Annex 12- Working document - Comments on Document 4A/198 regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20) |
|
Word
|
69120 octetos |
2005-12-07 |
[267] Annex 11- Working document towards a PDNR on guidelines on possible simplification of data used for coordination of FSS satellite networks
|
|
Word
|
607744 octetos |
2005-12-09 |
[267] Annex 10- Working document on OFF-AXIS EIRP emissions in the presence of motion-induced antenna pointing errors
|
|
Word
|
608768 octetos |
2005-12-12 |
[267] Annex 10 Revision 1- Working document on off-axis eirp emissions in the presence of motion-induced antenna pointing errors |
|
Word
|
108544 octetos |
2005-12-06 |
[267] Annex 09- Consideration of ultra-wideband devices |
|
Word
|
383488 octetos |
2005-12-06 |
[267] Annex 08- Working document towards a preliminary draft new Recommendation ITU-R S.[SHARING_BI-DIRECT_UBIQ] - Possible methodology for frequency sharing between bidirectional FSS networks comprising ubiquitously deployed earth stations
|
|
Word
|
417792 octetos |
2005-12-12 |
[267] Annex 08 Revision 1- Working document towards a preliminary draft new Recommendation ITU-R S.[sharing_bi-direct_ubiq] - Possible methodology for frequency sharing between bidirectional FSS networks comprising ubiquitously deployed earth stations |
|
Word
|
79872 octetos |
2005-12-05 |
[267] Annex 07- Working document towards a preliminary draft new Recommendation on "HDFSS system characteristics" |
|
Word
|
477184 octetos |
2005-12-05 |
[267] Annex 06- Working document toward preliminary draft new Recommendation on Possibilities for global broadband Internet access by FSS systems |
|
Word
|
175616 octetos |
2005-12-05 |
[267] Annex 05- Preliminary draft revision to Recommendation ITU-R S.465 - Reference earth-station radiation pattern for use in coordination
and interference assessment in the frequency range from 2 to about 30 GHz
|
|
Word
|
828928 octetos |
2005-12-02 |
[267] Annex 04- Preliminary draft revision to Recommendation ITU-R S.1524 - Coordination identification between geostationary-satellite orbit fixed-satellite service networks |
|
Word
|
93696 octetos |
2005-12-02 |
[267] Annex 03- Elements for the draft CPM text on Agenda item 1.12 - Coordination arc value for triggering the inter-service coordination between the broadcasting-satellite service in Region 2 and the fixed-satellite service (space-to-Earth) in Region 1 in the band ... |
|
Word
|
1539072 octetos |
2005-12-02 |
[267] Annex 02- Preliminary draft revision of Recommendation ITU-R S.1713 - "Methodology to calculate the minimum separation angle at the Earth's surface between a non-geostationary satellite in a HEO "active" arc and a geostationary satellite" |
|
Zip (Document)
|
575104 octetos |
2005-12-02 |
[267] Annex 02- Preliminary draft revision of Recommendation ITU-R S.1713 - "Methodology to calculate the minimum separation angle at the Earth's surface between a non-geostationary satellite in a HEO "active" arc and a geostationary satellite" |
|
Word
|
7449600 octetos |
2005-12-02 |
[267] Annex 01- Working document towards CPM text for the review of AP 30B (WRC-07 Agenda item 1.10)
|
|
Zip (Document)
|
1559223 octetos |
2005-12-02 |
[267] Annex 01- Working document towards CPM text for the review of AP 30B (WRC-07 Agenda item 1.10)
|
|
Word
|
175616 octetos |
2005-12-15 |
[267] - Chairman's Report on the meeting of Working Party 4A - Geneva, 7-16 November 2005 |
|
|