Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1B : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1B  C 

UIT-R WP1B

Metodologías para la gestión eficaz del espectro

Resultados :11 documentos
Contribuciones  [ Origen: WP 6A ]   Documents / Contributions
 
Número 
Título Origen Fecha
[ 316 ]  
 
Liaison statement to Study Group 1 and Working Party 1B - Technical and operating parameters and spectrum use for short-range Radiocommunication devices     WP 6A   2011-10-19
[ 315 ]  
 
Liaison statement to Study Group 1 (for information to Study Group 7 and Working Parties 1A, 1B, 4A, 4C, 5B and 5C) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS)     WP 6A   2011-10-10
[ 270 ]  
(Rev.1) 
Liaison statement to ITU-R Study Groups - Methodology for calculation of maximum [PERMISSIBLE] power flux-density limits for the protection of digital terrestrial television broadcasting services from interference generated by mobile services including IMT systems where identified in the Radio Regulations     WP 6A   2010-11-08
[ 216 ]  
 
Liaison statement on WRC-12 Agenda item 1.2     WP 6A   2010-05-14
[ 162 ]  
 
Liaison statement to Working Party 1B - WRC-12 Agenda item 1.19     WP 6A   2009-12-08
[ 94 ]  
 
Liaison statement to Working Party 1B - On the study of software-defined radio and congnitive radio systems for WRC-11 Agenda item 1.19     WP 6A   2009-05-14
[ 50 ]  
 
Liaison statement to Working Party 1B - Requirements for protection against interference generated by short-range devices (SRD) operating in the terrestrial broadcast bands     WP 6A   2008-11-21
[ 49 ]  
 
Liaison statement to Working Party 1B - On the study of software-defined radio and cognitive radio systems for WRC-11 Agenda item 1.19     WP 6A   2008-11-21
[ 29 ]  
 
Liaison reply to Working Party 4C (copied to Working Parties 3J, 3K, 3L, 3M, 7A, 7B, 7C, 7D, 4A, 4B, 6A, 6B, 6C, 1A, 1B, 1C, 5A, 5B, 5C and 5D for information) - Studies related to WRC-11 Agenda item 1.25     WP 6A   2008-06-11
[ 28 ]  
 
Liaison statement to ITU-R Working Party 1B on software-defined radio and congnitive radio systems - (copy for information to ITU-R Working Party 5A, 5B and ITU-R Study Groups 3, 4 and 7)     WP 6A   2008-06-11
[ 27 ]  
 
Liaison statement to Working Party 1B - Requirements for protection against interference generated by short range devices (SRD) operating in the terrestrial broadcast bands     WP 6A   2008-06-11
Resultados :11 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-7-26