Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5C : Contribuciones : 217 Nuevo -  Busque los documentos de la reunión
   
[217]  Report of the third meeting of Working Party 5C (Geneva, 18 - 27 May 2009)

Formato

Tamaño

Puesta a disposición

English

Word  

283648 octetos 2009-07-16 [217] Annex 20- List of output documents (Documents 5C/TEMP/89 to 5C/TEMP/134)

Word  

876032 octetos 2009-05-28 [217] Annex 19- Preliminary draft revision of Recommendation ITU-R F.1335 - Technical and operational considerations in the phased transitional approach for bands shared between the mobile-satellite service and the fixed service at 2 GHz

Word  

543232 octetos 2009-06-16 [217] Annex 18- Working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER] - Guidance to administrations wishing to reach an agreement on compatibility within the fixed service and sharing between stations of fixed service with stations of other terre

Word  

1722880 octetos 2009-06-16 [217] Annex 17- Preliminary draft revision to Report ITU-R F.2106 - Fixed service applications using free-space optical links

Word  

137728 octetos 2009-06-16 [217] Annex 16- Review of the F-series Recommendations developed by the former Working Party 9D

Word  

1813504 octetos 2009-06-16 [217] Annex 15- Working document towards a preliminary draft revision of Recommendation ITU-R F.1336-2 - Reference radiation patterns of omnidirectional, sectoral and other antennas in point-to-multipoint systems for use in sharing studies in the frequency range from 1 G

Word  

830464 octetos 2009-06-17 [217] Annex 14- Working document towards a preliminary draft revision to Recommendation ITU-R F.758-4

Word  

172032 octetos 2009-06-16 [217] Annex 13- Agreed distribution of actions related to texts that are the joint responsibility of Working Party 5A and Working Party 5C

Word  

1021952 octetos 2009-06-12 [217] Annex 12- Working document towards a preliminary draft new Report [AMS-FS] - Sharing between the aeronautical mobile service and the fixed service in the band 37-38 GHz

Word  

574976 octetos 2009-06-15 [217] Annex 11- Consideration of a preliminary draft new ITU-R Recommendation for interference between HAPS gateways and conventional FS systems

Word  

979456 octetos 2009-06-15 [217] Annex 10- Preliminary draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateway links in the fixed service using high altitude platform stations in the band 5 850-7 075 MHz to be used in sharing studies

Word  

1690624 octetos 2009-06-16 [217] Annex 09- Working document towards a preliminary draft new Recommendation ITU-R F.[HAPS MODELLING] - Interference analysis modelling for sharing between HAPS gateway links and existing services in the range 5 850-7 075 MHz

Word  

349696 octetos 2009-06-15 [217] Annex 08- Preliminary review of certain SF-series Recommendations - (Updating of the text, addition of the scope and proposed suppression)

Word  

212992 octetos 2009-06-16 [217] Annex 07- Preliminary review of certain ITU-R F-series Recommendations for further consideration

Word  

1003520 octetos 2009-06-16 [217] Annex 06- Working document on WRC-11 Agenda item 1.8 for further discussion within Working Party 5C - fixed wireless services in the 71 GHz to 238 GHz

Word  

118784 octetos 2009-06-12 [217] Annex 05- Working document - Framework for studies related to WRC-11 Agenda item 1.8

Word  

225280 octetos 2009-06-16 [217] Annex 04- Methods to satisfy the agenda item (WRC-11 AI 1.5)

Word  

209408 octetos 2009-06-16 [217] Annex 03- Working document towards draft CPM text on WRC-11 Agenda item 1.12 - Agenda item 1.12 (WP 7B/WP 4A, WP 5B, WP 5C, (WP 5A))

Word  

162304 octetos 2009-06-16 [217] Annex 02- Working document towards a preliminary draft revision of Recommendation ITU-R F.1245-1 - Mathematical model of average and related radiation patterns for Line-of-Sight Point-to-Point radio-relay system antennas for use in certain coordination studies...

Word  

115712 octetos 2009-06-16 [217] Annex 01- Working document - Framework for studies related to WRC-11 Agenda item 1.5

Word  

439296 octetos 2009-07-21 [217] - Report of the third meeting of Working Party 5C (Geneva, 18 - 27 May 2009)
 

Documento :

UIT-R WP5C  Contribución  217

Título :

Report of the third meeting of Working Party 5C (Geneva, 18 - 27 May 2009)

Recibido en :

2009-05-27

Origen :

Chairman, WP 5C

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2009-07-21