Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP7B : Contribuciones : 308 Nuevo -  Busque los documentos de la reunión
   
[308]  Report of the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012) - (Geneva, 26-30 September 2011)

Formato

Tamaño

Puesta a disposición

English

Word  

106660 octetos 2011-10-27 [308] Annex 06- Preliminary draft new Recommendation ITU-R SA.[EES/METSAT USAGE 401-403 MHz] - Basic general partitioning and sharing conditions for the band 401-403 MHz for future long-term coordinated use of data collection systems on geostationary and non-geostationar

Word  

239520 octetos 2011-10-25 [308] Annex 05- Preliminary draft new Recommendation ITU-R SA.[EES/MET DCS INTERF] - Protection criteria for non-GSO data collection platforms in the band 401-403 MHz

Word  

150337 octetos 2011-10-27 [308] Annex 04- Preliminary draft new Recommendation ITU-R SA.[EES/MET CHAR] - Characteristics to be used for assessing interference to systems operating in the Earth exploration-satellite and meteorological-satellite services, and for conducting sharing studies

Word  

85577 octetos 2011-10-25 [308] Annex 03- Preliminary draft new Recommendation ITU-R SA.[EES/MET METH] - Protection criteria for MetSat and EESS services

Word  

391133 octetos 2011-10-25 [308] Annex 02- Preliminary draft revision of Recommendation ITU-R SA.509 - Research earth station and radio astronomy reference antenna radiation pattern for use in interference calculations, including coordination procedures, for frequency bands less than 30 GHz

Word  

217384 octetos 2011-10-25 [308] Annex 01- Preliminary draft revision of Recommendation ITU-R SA.1414 - Characteristics of data relay satellite systems

Word  

83058 octetos 2011-11-04 [308] - Report on the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012)
 

Documento :

UIT-R WP7B  Contribución  308

Título :

Report of the September 2011 meeting of Working Party 7B with a view to its next meeting (September 2012) - (Geneva, 26-30 September 2011)

Recibido en :

2011-10-03

Origen :

Chairman, WP 7B

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2011-11-07