Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP4A : Contribuciones : 63 Nuevo -  Busque los documentos de la reunión
   
[63]  Report on the meeting of Working Party 4A (Geneva, 13-22 April 2016)

Formato

Tamaño

Puesta a disposición

English

Word  

60682 octetos 2016-05-20 [63] Annex 37- List of liaison statements to ITU-R Groups

Word  

64062 octetos 2016-05-19 [63] Annex 36- Working document towards a preliminary draft revision of Report ITU-R S.2261 (ANNEX - [AIRBORNE] ESOMPS) - Guidelines that could be used by Administrations wishing to license [airborne] ESOMPs operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services

Word  

72199 octetos 2016-05-19 [63] Annex 35- Working document towards a preliminary draft revision of Report ITU-R S.2261 (ANNEX - ESOMPS ON VESSELS) - Guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in non-GSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services

Word  

78728 octetos 2016-05-19 [63] Annex 34- Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-MS SHARE METHODOLOGY] - Methodology for calculating separation distances for sharing in the 3 400-3 600 MHz range between earth stations of the fixed-satellite service and stations in the mobile service

Word  

60444 octetos 2016-05-18 [63] Annex 33- Note to the Director, Radiocommunication Bureau - Use of linear polarization for RR Appendices 30 and 30A Article 4 networks in Region 2

Word  

68026 octetos 2016-05-18 [63] Annex 32- Draft note to Director, Radiocommunications Bureau - Circular letter to Administrations requesting link budget information of FSS and BSS GSO systems for non-GSO studies

Word  

62547 octetos 2016-05-18 [63] Annex 31- Draft liaison statement to Working Party 7C - WRC-19 agenda item 9.1, issue 9.1.9

Word  

61828 octetos 2016-05-18 [63] Annex 30- Draft liaison statement to Task Group (TG) 5/1 (copy to Working Party 7B) - Protection requirements for the ISS and FSS relevant to considerations under WRC-19 agenda item 1.13

Word  

59935 octetos 2016-05-18 [63] Annex 29- Draft liaison statement to ITU-R Working Party 7C - WRC-19 agenda item 1.6

Word  

63376 octetos 2016-05-06 [63] Annex 28- Work plan for WRC-19 agenda item 9.1, issue 9.1.9

Word  

69980 octetos 2016-05-03 [63] Annex 27- Working document towards elements for the draft Conference Preparatory Meeting (CPM) Report - WRC-19 agenda item 9.1, issue 9.1.3

Word  

63499 octetos 2016-05-06 [63] Annex 26- Work plan for WRC-19 agenda item 9.1, issue 9.1.3

Word  

63121 octetos 2016-05-02 [63] Annex 25- Work plan for WRC-19 agenda item 9.1, issue 9.1.2

Word  

62470 octetos 2016-05-13 [63] Annex 24- Working document toward preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Discrepancy and / or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment

Word  

65991 octetos 2016-05-13 [63] Annex 23- Working document toward preliminary draft CPM text for WRC-19 agenda item 7 - Issue B: Modification (characteristics reduction) of a recorded assignment under RR Appendices 30 and 30A Regions 1 & 3 List

Word  

64570 octetos 2016-05-13 [63] Annex 22- Working document toward preliminary draft CPM Text for WRC-19 agenda item 7 - Issue A: Factors related to the bringing into use of frequency assignments of non-GSO systems subject to coordination

Word  

61905 octetos 2016-05-02 [63] Annex 21- Work plan for WRC-19 agenda item 7

Word  

63608 octetos 2016-05-02 [63] Annex 20- Work plan for WRC-19 agenda item 1.6

Word  

68600 octetos 2016-05-02 [63] Annex 19- Work plan for WRC-19 agenda item 1.5

Word  

62675 octetos 2016-05-02 [63] Annex 18- Work plan for WRC-19 agenda item 1.4

Word  

1639329 octetos 2016-05-02 [63] Annex 17- Considerations on the content and application of Recommendation ITU-R S.1503-2

Word  

94834 octetos 2016-05-02 [63] Annex 16- Application of coordination arc in the KA band, to determine coordination requirements between the FSS and other satellite services

Word  

63852 octetos 2016-05-02 [63] Annex 15- Working document on parameters for inter service sharing studies between FSS/BSS and other services

Word  

907979 octetos 2016-05-13 [63] Annex 14- Working document on range of notified characteristics of recorded frequency assignments of GSO satellite networks

Word  

210573 octetos 2016-05-13 [63] Annex 13- Working document on treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth

Word  

93103 octetos 2016-05-02 [63] Annex 12- Working document regarding the studies on compatibility of International Mobile Telecommunications and broadcasting-satellite service (sound) in the frequency band 1 452-1 492 MHz in Regions 1 and 3 - WRC-19 agenda item 9.1, issue 9.1.2

Word  

1913015 octetos 2016-05-02 [63] Annex 11- Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz

Word  

1654322 octetos 2016-05-02 [63] Annex 10- Working document on WRC-19 AI 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions

Word  

61142 octetos 2016-05-02 [63] Annex 09- Working document [towards a preliminary draft new Report] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 nearby bands - WRC-19 agenda item 9.1, issue 9.1.9

Word  

77491 octetos 2016-05-02 [63] Annex 08- Working document [towards a preliminary draft new Report] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9

Word  

63430 octetos 2016-05-02 [63] Annex 07- Working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6

Word  

66287 octetos 2016-05-02 [63] Annex 06- Working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems -WRC-19 agenda item 1.6

Word  

114459 octetos 2016-05-02 [63] Annex 05- Working document [towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4GHZ GSO/NON-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3

Word  

715290 octetos 2016-04-29 [63] Annex 04- Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-29.5 GHZ] - Uplink interference associated with closely separated GSO FSS VSAT networks in the 27.5-29.5 GHz frequency band

Word  

63074 octetos 2016-05-02 [63] Annex 03- Working document towards a preliminary draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band 14.5-14.75 GHz, for Regions 1 and 2 countries...

Word  

133044 octetos 2016-04-29 [63] Annex 02- Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] - A guiding methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases described in the Tables of Appendix 7 of the Radio Regulations

Word  

200510 octetos 2016-04-29 [63] Annex 01- Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B

Word  

1841755 octetos 2016-05-20 [63] - Report on the meeting of Working Party 4A (Geneva, 13-22 April 2016)
 

Documento :

UIT-R WP4A  Contribución  63

Título :

Report on the meeting of Working Party 4A (Geneva, 13-22 April 2016)

Recibido en :

2016-04-22

Origen :

Chairman, WP 4A

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2016-05-20