Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5A : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5A  C 

UIT-R WP5A

Servicio móvil terrestre por encima de 30 MHz* (excluidas las IMT); acceso inalámbrico en el servicio fijo; servicio de aficionados y servicio de aficionados por satélite

Resultados :16 documentos
Contribuciones  [ Origen: WP 1B ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1075 ]  
 
Reply liaison statement to Working Party 6A (copy for information to Working Parties 1A, 5A, 5B and 7A) - Frequency use by non-beam Wireless Power Transmission for Electric Vehicle (WPT-EV) applications using magnetic resonance power transfer     WP 1B     2019-06-17
[ 977 ]  
 
Liaison statement to Working Party 3L (copy for information to Working Parties 1A, 1C, 5A, 5B, 6A, and 7A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field) (Question ITU-R 210-3/1)     WP 1B   AI9.1   2018-11-29
[ 859 ]  
 
Liaison statement to ETSI ERM TG 17 (copy to ITU-R Working Party 5A) - Operation of short-range radiocommunication public access system supporting hearing aid systems     WP 1B     2018-06-28
[ 858 ]  
 
Liaison statement to ITU-D Study Group 2 and ITU-R Working Party 5A - 'Bird-to-Bird' packet communication     WP 1B     2018-06-28
[ 663 ]  
 
Reply liaison statement to Working Party 5A (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, issue 9.1.8     WP 1B   AI9.1   2017-12-08
[ 489 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A and 5D - New Report ITU-R SM.2404-0 (ex. [REGULATORY TOOLS]) - Regulatory tools to support enhanced shared use of the spectrum     WP 1B   Q208/1   2017-07-10
[ 488 ]  
 
Liaison statement to APT and ITU-R Working Parties 5A and 5D - New Report ITU-R SM.2405-0 (ex.[CRS SPECTRUM MANAGEMENT CHALLENGES]) - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WP 1B     2017-07-10
[ 487 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5D and ITU-T Study Group 20 - Work on WRC-19 agenda item 9.1, issue 9.1.8     WP 1B   AI9.1   2017-07-10
[ 318 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 317 ]  
 
Reply liaison statement from ITU-R Working Party 1B to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on Resolution 9 draft output Report (copy to ITU-D Study Group 1, ITU-R Working Parties 1C and 5A)     WP 1B     2016-12-14
[ 316 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 143 ]  
 
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Working Parties 1A and 5A for information) - Working document towards a preliminary draft new Recommendation ITU-R SM.[G.WNB-FREQ]     WP 1B     2016-06-23
[ 142 ]  
 
Reply liaison statement to Working Party 5A on the study of sharing schemes in the land mobile service on the basis of geographical USE, frequencies, services, new technologies and applications     WP 1B     2016-06-22
[ 129 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...     WP 1B     2016-06-13
[ 128 ]  
 
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum     WP 1B   208-1/1   2016-06-13
[ 127 ]  
 
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)     WP 1B     2016-06-13
Resultados :16 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2024-7-17