Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : SG01 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R SG01  C 

UIT-R SG01

Gestión del Espectro

Resultados :165 documentos
Resultados :  1 - 2 - 3 - 4  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 165 ]  
 
Liaison statement on request to provide the standardization status for metaverse-related technologies     ITU-T FG-MV     2023-10-19
[ 164 ]  
 
Reply liaison statement to CISPR/H (copy for information or action to Working Parties 4A and 7D on Question 6) (copy for information to Study Group 1 and Working Parties 1A and 5A)     WP 6A     2023-09-11
[ 163 ]  
 
Note to the Chairmen of Working Parties 4A and 7D (copy to the Chairmen of Study Group 1 and Working Party 1A)     Chairman, WP 6A     2023-06-14
[ 162 ]  
+Corr.1 
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 5-6 June 2023)     Chairman, SG 1     2023-06-06
[ 161 ]  
 
Final list of participants - Study Group 1 (Geneva, 5-6 June 2023)     Director, BR     2023-06-06
[ 160 ]  
 
List of documents issued (Documents 1/112-1/160)     BR, Study Groups Department     2023-06-05
[ 159 ]  
 
Preliminary draft of the Study Group 1 Chairman's Report to RA-23 - Spectrum management     Chairman, SG 1     2023-06-05
[ 158 ]  
(Rev.1) 
Revision of Report ITU R SM.2048-0 - Use of the x dB bandwidth criterion for determination of spectral properties of a transmitter in the out-of-band domain     WP 1A     2023-06-02
[ 157 ]  
(Rev.1) 
Editorial revision of Recommendations assigned to ITU-R Working Party 1A     WP 1A     2023-06-02
[ 156 ]  
(Rev.1) 
Revision of Report ITU-R SM.2303-3 - Wireless power transmission using technologies other than radio frequency beam     WP 1A     2023-06-02
[ 155 ]  
 
Executive Report on the May - June 2023 meeting of Working Party 1A (29 May - 2 June 2023)     Chairman, WP 1A     2023-06-02
[ 154 ]  
 
Executive Report on Working Party 1B meeting (Meeting in Thessaloniki from 29 May to 2 June 2023)     Chairman, WP 1B     2023-06-02
[ 153 ]  
(Rev.1) 
Revision of Report ITU-R SM.2179-1 - Short-range radiocommunication devices measurements     WP 1C     2023-06-02
[ 152 ]  
(Rev.1) 
Editorial revision of one Report assigned to Working Party 1C     WP 1C     2023-06-02
[ 151 ]  
(Rev.1) 
Revision of Report ITU-R SM.2454-0 - Spectrum monitoring techniques in the radionavigation-satellite service frequency bands     WP 1C     2023-06-02
[ 150 ]  
(Rev.1) 
Editorial revision of eight Recommendations assigned to Working Party 1C     WP 1C     2023-06-02
[ 149 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1838-0 - Test procedure for measuring the noise figure of radio monitoring receivers     WP 1C     2023-06-02
[ 148 ]  
 
Draft revision of Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks     WP 1C     2023-06-02
[ 147 ]  
(Rev.1) 
Revision of Report ITU-R SM.2355-1 - Spectrum monitoring evolution     WP 1C     2023-06-02
[ 146 ]  
(Rev.1) 
Revision of Report ITU-R SM.2257-6 - Spectrum management and monitoring during major events     WP 1C     2023-06-02
[ 145 ]  
(Rev.1) 
Revision of Report ITU-R SM.2182-2 - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations     WP 1C     2023-06-02
[ 144 ]  
 
Preliminary draft revision of ITU-R Resolutions     WP 1B     2023-06-02
[ 143 ]  
(Rev.1) 
Editorial revision of six Recommendations assigned to ITU-R Working Party 1B     WP 1B     2023-06-02
[ 142 ]  
 
Liaison statement to ITU-R Study Group 1 - Further development of the Spectrum Management System for Developing Countries     SG 3     2023-06-02
[ 141 ]  
 
Executive Report to Study Group 1 (Working Party 1C meeting in Thessaloniki, Greece, from 29 May to 2 June 2023)     Chairman, WP 1C     2023-06-02
[ 140 ]  
(Rev.1) 
New Report ITU-R SM.2523-0 - Assessment of Spectrum efficiency and economic value     WP 1B     2023-06-02
[ 139 ]  
(Rev.1) 
Editorial revision to Recommendation ITU-R SM.1756-0 - Framework for the introduction of devices using ultra-wideband technology     WP 1B     2023-06-02
[ 138 ]  
(Rev.1) 
Editorial revision of Report ITU-R SM.2153-9 - Technical and operating parameters and spectrum use for short range radiocommunication devices     WP 1B     2023-06-02
[ 137 ]  
 
Liaison statement to the Coordination Committee for Terminology (CCT) (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D, and Study Group 1 for information) - Proposed revision of Recommendation ITU-R V.431-8     WPs 3J, 3K & 3M     2023-06-02
[ 136 ]  
 
Liaison statement to ITU-T Study Groups 16 and 20, ITU-R SG 1 and Working Parties 1B, 5A and 5D (copy to ITU-T SGs 2, 3, 5, 9, 13, and ITU-R WPs 1C, 4A, 5B, 5C, 6A, 7B) on question of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) for e-services including e-health and e-education     ITU-D SG2     2023-05-31
[ 135 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 and ITU-R Study Group 1 (copy to ITU-R Working Parties 1C, 4A, 5A, 5B, 5C, 5D and 6A) on questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022) - ITU-D Study Group 2 Question 7/2: Strategies and policies concerning human exposure to electromagnetic fields     ITU-D SG2     2023-05-27
[ 134 ]  
 
Report of Correspondence group on editorial review and maintenance of ITU-R Recommendations, Reports and Questions assigned to the Study Group 1     Chairman, SG 1 CG on editorial review     2023-05-26
[ 133 ]  
(Rev.2) 
Report on CISPR activities from June 2022 to May 2023 - On WPT and general issues     SG 1 Rapp. to CISPR on WPT Issues     2023-05-26
[ 132 ]  
 
Draft reply liaison statement from Study Group 1 to the Coordination Committee for Terminology - Revising Recommendation ITU-R V.431-8     ATDI     2023-05-25
[ 131 ]  
 
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and Working Party 1B on the questions of mutual interest and implementation of the WTDC Resolution 9 (Rev. Kigali, 2022)     ITU-D SG1     2023-05-23
[ 130 ]  
 
Editorial revisions of ITU-R SM-series Recommendations that cite CISPR publications     SG 1 Rapp. to CISPR     2023-05-22
[ 129 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) Standards Overview and Work plan     ITU-T SG15     2023-05-04
[ 128 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) Standards Overview and Work plan     ITU-T SG15     2023-05-04
[ 127 ]  
 
Liaison response from International Special Committee on Radio Interference - CISPR/H to ITU-R Working Party 6A (copy to ITU-R Study Group 1 and Working Party 1A for information)     International Special Committee on Radio Interference     2023-04-28
[ 126 ]  
 
WTDC Resolution 9 (Rev. Kigali, 2022) implementation ITU-R and ITU-D collaboration - Participation of countries, particularly developing countries, in spectrum management     Kenya (Republic of) , ATDI     2023-04-21
[ 125 ]  
 
Liaison statement to ITU-T Study Group 5, ITU-D Study Group 2 and ITU-R Study Group 1 - Revision of Recommendation ITU-R BS.1698     WP 6A     2023-03-21
[ 124 ]  
 
Recommendation ITU-R M.1732-3 - Characteristics of systems operating in the amateur and amateur-satellite services for use in sharing studies     SG 5     2023-02-23
[ 123 ]  
 
Liaison statement from ITU-D Study Group 2 Question 6/2 to ITU-T Study Groups 5 and 20, and ITU-R Study Groups 1, 4, 6 and 7 on new Question 6/2 and collaboration     ITU-D SG2     2022-12-21
[ 122 ]  
 
Liaison statement from ITU-D Study Group 1 Question 6/1 to ITU-R Study Group 1 and Working Party 1B on consumer information, protection and rights     ITU-D SG1     2022-12-20
[ 121 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration     ITU-D SG1     2022-12-20
[ 120 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF     WP 5C     2022-11-30
[ 119 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5A     2022-11-28
[ 118 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5D     2022-10-28
[ 117 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2022-10-14
[ 116 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan     ITU-T SG15     2022-10-14
Resultados :165 documentos
Resultados :  1 - 2 - 3 - 4  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2023-10-19