Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : TG6.1 : Contribuciones : 24 Nuevo -  Busque los documentos de la reunión
   
[24]  Report of the meeting of Task Group 6/1 (e-meeting, 19-23 October 2020)

Formato

Tamaño

Puesta a disposición

English

Word  

36498 octetos 2020-11-10 [24] Annex 08- Working document towards draft CPM Text for WRC-23 agenda item 1.5

Word  

34166 octetos 2020-11-10 [24] Annex 07- Terms of Reference of Correspondence Group on Section 2 of the Draft CPM Text for agenda item 1.5

Word  

38007 octetos 2020-11-10 [24] Annex 06- Considerations with respect to the work on sharing and compatibility studies in the band 470-960 MHz

Word  

34033 octetos 2020-11-10 [24] Annex 05- Terms of Reference and workplan of Working Group 2 - Sharing and compatibility studies in the band 470-960 MHz

Word  

43383 octetos 2020-11-10 [24] Annex 04- Structure of the working document review of the spectrum use and the study on spectrum needs of existing services within the frequency band 470-960 MHZ in Region 1

Word  

44941 octetos 2020-11-10 [24] Annex 03- Terms of reference and workplan of the Working group 1 - Spectrum use and spectrum needs of all existing services in the band 470-960 MHz

Word  

42471 octetos 2020-11-10 [24] Annex 02- Work plan for the development of CPM text on agenda item 1.5 of WRC-23

Word  

34079 octetos 2020-11-16 [24] Annex 01 Revision 1- Structure of Task Group 6/1

Word  

44778 octetos 2020-11-20 [24] - Report on the first meeting of Task Group 6/1 (19-23 October 2020)
 

Documento :

UIT-R TG6.1  Contribución  24

Título :

Report of the meeting of Task Group 6/1 (e-meeting, 19-23 October 2020)

Recibido en :

2020-10-23

Origen :

Chairman, TG 6/1

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2022-07-13