Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1B : Contribuciones : 80 Nuevo -  Busque los documentos de la reunión
   
[80]  Report on the fourth 2019-2023 meeting of Working Party 1B (Geneva, 28 June - 7 July 2022)

Formato

Tamaño

Puesta a disposición

English

Word  

1504954 octetos 2022-07-12 [80] Annex 4- Working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - [Methodologies for assessing or predicting spectrum availability]

Word  

928244 octetos 2022-07-12 [80] Annex 3- Preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - Assessment of spectrum efficiency and economic value

Word  

34853 octetos 2022-07-12 [80] Annex 2- Work plan for a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems

Word  

37096 octetos 2022-07-12 [80] Annex 1- Working document towards a preliminary draft new Report ITU-R SM.[GPR/WPR FREQ] - Spectrum management framework for the introduction of Ground- and Wall-Penetrating Radar (GPR/WPR) imaging systems

Word  

50540 octetos 2022-07-25 [80] - Report on the fourth 2020-2023 meeeting of Working Party 1B (Geneva, 28 June to 7 July 2022)
 

Documento :

UIT-R WP1B  Contribución  80

Título :

Report on the fourth 2019-2023 meeting of Working Party 1B (Geneva, 28 June - 7 July 2022)

Recibido en :

2022-07-06

Origen :

Chairman, WP 1B

Disponibilidad :

Restringido a usuarios de TIES [UIT-R]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2022-08-11