|
Formato |
Tamaño |
Puesta a disposición |
|
|
|
English |
Word
|
40980 octetos |
2024-07-04 |
[43] Annex 19- Terms of Reference for the Correspondence Group on EMC Related Interference and Coexistence of Wired Telecommunications Systems with Radiocommunication Systems |
|
Word
|
232925 octetos |
2024-07-04 |
[43] Annex 18- Preliminary draft revision of Recommendation ITU-R SM.328-11 - Spectra and bandwidth of emissions |
|
Word
|
36319 octetos |
2024-07-04 |
[43] Annex 17- Liasion statement to ETSI on Terahertz communications |
|
Word
|
34741 octetos |
2024-07-03 |
[43] Annex 16- Draft liaison statement to Working Parties 5A, 5B, 5C, 7C AND 7D - Technical and operational characteristics and spectrum use of radiocommunication services in the frequency ranges above 275 GHz |
|
Word
|
40163 octetos |
2024-07-03 |
[43] Annex 15- Working document towards a preliminary draft new ITU-R Report SM.[RADIOCOMMUNICATION SERVICES ABOVE 275 GHZ] - Technical and operational characteristics and spectrum use of radiocommunication services in the frequency ranges above 275 GHz |
|
Word
|
43995 octetos |
2024-07-03 |
[43] Annex 14- Working document towards a preliminary draft new Report ITU-R SM.[THZ_SPEC] - Technical and operational characteristics of terrestrial terahertz spectroscopy/ISM and SRD applications of industry automation in shielded environments in the frequency range 71-275 GHz |
|
Word
|
41696 octetos |
2024-07-03 |
[43] Annex 13- Terms of Reference of the Correspondence Group on Report ITU-R SM.[UWB.EVOLUTION] |
|
Word
|
39215 octetos |
2024-07-03 |
[43] Annex 12- Working document towards a preliminary draft new Report ITU-R SM.[UWB.EVOLUTION] - Evolution of devices using ultra-wideband (UWB) technologies |
|
Word
|
11898020 octetos |
2024-07-03 |
[43] Annex 11- Working document towards a preliminary draft revision of Report ITU-R SM.2057 - Studies related to the impact of devices using ultra-wideband technology on radiocommunication services |
|
Word
|
40340 octetos |
2024-07-03 |
[43] Annex 10- Reply liaison statement from Working Party 5D to Working Party 1A (copy to Working Parties 4C, 5A, 7C and 7D for information) - Beam Wireless Power Transmission (WPT) operating in the frequency band 24.1-24.15 GHz |
|
Word
|
4794948 octetos |
2024-06-21 |
[43] Annex 9- Working document towards a preliminary draft revision of Report ITU-R SM.2505-0 - Impact studies and human hazard issues for wireless power transmission via radio frequency beam |
|
Word
|
10993451 octetos |
2024-06-21 |
[43] Annex 8- Working document towards a preliminary draft revision of Report ITU-R SM.2392-1 - Applications of wireless power transmission via radio frequency beam |
|
Word
|
40337 octetos |
2024-07-03 |
[43] Annex 7- Working document towards a preliminary draft revision of Recommendation ITU-R SM.2151-0 - Guidance on frequency ranges for operation of wireless power transmission via radio frequency beam for mobile/portable devices and sensor networks |
|
Word
|
42206 octetos |
2024-07-03 |
[43] Annex 6- Reply liaison statement to Subcommittee H of CISPR - Information on non-beam wireless power transmission for electric vehicles |
|
Word
|
6237403 octetos |
2024-07-03 |
[43] Annex 5- Working document towards a preliminary draft revision of Report ITU-R SM.2451-1 - Assessment of impact study on radiocommunication services from wireless power transmission for electric vehicle operating below 30 MHz |
|
Word
|
53065 octetos |
2024-07-03 |
[43] Annex 4- Preliminary draft revision of Recommendation ITU-R SM.2110-1 - Guidance on frequency ranges for operation of non-beam wireless power transmission for electric vehicles |
|
Word
|
42215 octetos |
2024-07-03 |
[43] Annex 3- Reply liaison statement to the ITU-T Standardization Committee for Vocabulary (SCV) on terms contained in ITU-T Study Group 5 draft Recommendations (copy for information to ITU-T Study Group 5) |
|
Word
|
4017348 octetos |
2024-07-03 |
[43] Annex 2- Working document towards a preliminary draft revision of Report ITU-R SM.2422-2 - Visible light for broadband communications |
|
Word
|
33755 octetos |
2024-06-18 |
[43] Annex 1- Note from the Acting Chair of Working Party 1A to the Chair of the CPM-27 - Identification of Working Party 1A as a contributing group under WRC-27 agenda item 1.10 |
|
PDF (acrobat)
|
1898028 octetos |
2024-08-06 |
[43] Part 1
|
|
Word
|
1784808 octetos |
2024-08-06 |
[43] - Report of the first 2023-2027 meeting of Working Party 1A (Geneva, 12-19 June 2024) |
|
|