Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones Tardías (Reunión 2001-10-15) : 217 Nuevo -  Busque los documentos de la reunión
   
[217]  RZ signal duty cycle definition proposal and alternative parameter validation method for 40-Gbit/s application codes for new optical long haul interface specifications in G.959.1

Formato

Tamaño

Puesta a disposición

English

Word  

58368 octetos 2001-10-3 [217] - Lucent Technologies Germany(Q16/15): RZ signal duty cycle definition proposal and alternative parameter validation method for 40-Gbit/s application codes for new optical long haul interface specifications in G.959.1
 

Documento :

UIT-T SG15  (Periodo de estudios 2001)  Contribución Tardía  217

Título :

RZ signal duty cycle definition proposal and alternative parameter validation method for 40-Gbit/s application codes for new optical long haul interface specifications in G.959.1

Recibido en :

2001-10-03

Origen :

Lucent Technologies Germany

AI/Cuestión :

Q16/15

Disponibilidad :

Restringido a usuarios de TIES [UIT-T]

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2002-06-10