Contribuciones Tardías |
|
Número
|
Título
|
Origen
|
AI/Cuestión
|
Fecha
|
|
[ 673 ]
|
G.adsl, G.vdsl: Text for Termination impedance model of ADSL or VDSL2
|
LEA
|
Q4/15
|
2006-01-30 |
|
[ 672 ]
|
G.vdsl: Defining impedance models for VDSL for testing and designing splitters
|
LEA
,
Alcatel
|
Q4/15
|
2006-01-30 |
|
[ 671 ]
|
G.adsl, G.vdsl, G.test: Limiting the input capacitance of DSL transceivers over ISDN
|
LEA
,
Alcatel
|
Q4/15
|
2006-01-30 |
|
[ 670 ]
|
G.adsl, G.vdsl, G.test: Limiting input capacitance of DSL transceivers over POTS
|
LEA
,
Alcatel
|
Q4/15
|
2006-01-30 |
|
[ 669 ]
|
G.adsl, G.vdsl, Input capacitance of xDSL should have upper and lower bounds
|
LEA
|
Q4/15
|
2006-01-30 |
|
[ 668 ]
|
G.vdsl: 5 liaisons to SG Q4/15 and 5 papers not handled under VDSL in Munich
|
LEA on behalf of the chair of ETSI AT-A
|
Q4/15
|
2006-01-30 |
|
[ 667 ]
|
Proposed text for EoM mapping description in G.8012
|
Alcatel
|
Q11/15
|
2006-01-27 |
|
[ 666 ]
|
Proposal for Standardization of Ethernet transport networks
|
Huawei
|
Q12/15
|
2006-01-27 |
|
[ 665 ]
|
Proposal for Automatic Discovery Synchronization and Update in ASON
|
China United Telecomms
|
Q14/15
|
2006-01-27 |
|
[ 664 ]
|
Proposal for Multiple Control Channels in ASON
|
China United Telecomms
|
Q14/15
|
2006-01-27 |
|
[ 663 ]
|
Best practice of cable link test in China
|
MII China
|
Q5/15
|
2006-01-27 |
|
[ 662 ]
|
To put the formula of nominal central frequencies into G. Suppl 39
|
MII China
|
Q6/15
|
2006-01-27 |
|
[ 661 ]
|
Proposal for the introduction of Control Network Element Object in G.7718
|
MII China
|
Q14/15
|
2006-01-27 |
|
[ 660 ]
|
Proposals on the Usage of the Different Discovery Mechanisms
|
MII China
|
Q14/15
|
2006-01-27 |
|
[ 659 ]
|
Proposals for the interactions between the control plane components in G.8080
|
MII China
|
Q12/15
|
2006-01-27 |
|
[ 658 ]
|
Proposal of new drafts for survivability of ASON network
|
MII China
|
Q9/15
|
2006-01-27 |
|
[ 657 ]
|
Proposal For the Interface of Connection Controller Component in G.8080
|
MII China
|
Q12/15
|
2006-01-27 |
|
[ 656 ]
|
The response of call to a failure of connection
|
MII China
|
Q14/15
|
2006-01-27 |
|
[ 655 ]
|
Addition of three more sub-type EVPL services to G.8011.2
|
China Telecom
|
Q11/15
|
2006-01-27 |
|
[ 654 ]
|
Proposed modification of label allocation rules to G.7713.2
|
China Telecom
|
Q14/15
|
2006-01-27 |
|
[ 653 ]
|
Discussion of SPC activation/deactivation functions
|
CMCC
,
Huawei
|
Q14/15
|
2006-01-27 |
|
[ 652 ]
|
Discussion of introducing wireless protection in G.984
|
CMCC
|
Q2/15
|
2006-01-27 |
|
[ 651 ]
|
A proposal to inter-layer aspects
|
CMCC
,
Huawei
|
Q14/15, Q12/15
|
2006-01-27 |
|
[ 650 ]
|
A proposal of adding connection status attributes for connection objects
|
CMCC
,
Huawei
|
Q14/15
|
2006-01-27 |
|
[ 649 ]
|
Proposal for Multiple Similar Connections per Call
|
MII China
|
Q14/15
|
2006-01-27 |
|
[ 648 ]
|
Characteristics of optical fibre submarine cable
|
MII China
|
Q8/15
|
2006-01-27 |
|
[ 647 ]
|
Draft Liaison Statement for Synchronous Ethernet OUI
|
BT
|
Q13/15
|
2006-01-27 |
|
[ 646 ]
|
Input to G.pactiming on DS1 network limits for CES
|
USA
|
Q13/15
|
2006-01-27 |
|
[ 645 ]
|
Missing words in G.707
|
Nortel Networks
|
Q11/15
|
2006-01-27 |
|
[ 644 ]
|
Client Service Management Methodology considerations
|
Nortel Networks
|
Q11/15
|
2006-01-27 |
|
[ 643 ]
|
Ethernet timing flows
|
Nortel Networks
|
Q13/15
|
2006-01-27 |
|
[ 642 ]
|
Comments on Transport MPLS SCN
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 641 ]
|
Synchronous Connection Points
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 640 ]
|
Comment on Appendix on PWE3 - MPLS Interworking
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 639 ]
|
Modelling Terminology Mapping
|
Tellabs
|
Q12/15
|
2006-01-27 |
|
[ 638 ]
|
G.shdsl, G.selt: SHDSL Test Parameters
|
Infineon
|
Q4/15
|
2006-01-27 |
|
[ 637 ]
|
ADSL: Working Text for India Annex
|
BSNL
|
Q4/15
|
2006-01-27 |
|
[ 636 ]
|
PLOAM: Proposal to change the definition of Severely errored second -line (SES-L) to accommodate for dual latency application
|
LM Ericsson AB
|
Q4/15
|
2006-01-27 |
|
[ 635 ]
|
Relation between ITU-T and other SDOs or consortia in the context of the "black link" approach
|
Deutsche Telekom
|
Q6/15
|
2006-01-27 |
|
[ 634 ]
|
Clash of SNC-P protection within TCM section and addendum to ITU-T G.803
|
MII India
|
Q12/15
|
2006-01-27 |
|
[ 633 ]
|
Reserved Labels for Transport MPLS
|
Alcatel
|
Q12/15, Q11/15, Q9/15
|
2006-01-27 |
|
[ 632 ]
|
Control of a T-MPLS packet transport network
|
Alcatel
|
Q14/15, Q12/15
|
2006-01-27 |
|
[ 631 ]
|
Issues with use of Slow protocol OAM PDUs for SSM in Ethernet networks
|
Lucent Technologies Germany
|
Q13/15
|
2006-01-27 |
|
[ 630 ]
|
Improvement of clause 10 of G.pactiming in respect to normative and informative content
|
Lucent Technologies Germany
|
Q13/15
|
2006-01-27 |
|
[ 629 ]
|
Requirements of 10GE LAN signal transport over OTN ODU connections
|
Lucent Technologies Germany
|
Q11/15, Q12/15
|
2006-01-27 |
|
[ 628 ]
|
WITHDRAWN (same as D596)
Same as D.596
|
N/A (no se aplica)
|
Q12/15
|
2006-01-27 |
|
[ 627 ]
|
Line diagnostics functionality
|
BT
|
Q4/15
|
2006-01-27 |
|
[ 626 ]
|
G.VDSL Capacity Simulations using Band Plans for 7 MHz and above
|
BT
|
Q4/15
|
2006-01-27 |
|
[ 625 ]
|
Ethernet Clock extraction and insertion
|
BT
|
Q13/15, Q12/15, Q9/15
|
2006-01-27 |
|
[ 624 ]
|
Comments/additions to G.7714.1
|
BT
|
Q14/15
|
2006-01-27 |
Resultados :217 documentos Resultados :
1 -
2 -
3 -
4 -
5
- Siguiente
|
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):