Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : NGN-GSI : Reunión 2010-01-18 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T NGN-GSI  C (2010-01-18) 

UIT-T NGN-GSI

Iniciativa de normalización mundial de las redes de la próxima generación

Periodo de estudios 2009

Reunión  del 2010-01-18 al 2010-01-29

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-12-03  2012-06-04  2012-02-06  2011-10-10  2011-05-09  2011-01-17  2010-09-06  2010-04-19  2009-09-02  2009-05-11  2009-01-12 

Resultados :30 documentos
Contribuciones  [ AI/Cuestión: Q5/11 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 580 ]  
 
Proposed additions to Enhancement of resource and admission control protocols to use pre-congestion notification (PCN) (Draft Q.PCNApp)     NEC corporation   Q5/11   2010-01-14
[ 579 ]  
 
Proposed additions to Resource Control Protocol no. 4 (rcp4)     NEC corporation   Q5/11   2010-01-14
[ 578 ]  
 
Proposed additions to Resource control protocol no.3 (H.248 Rw Profile version 2) (Q.3323.2)     NEC corporation   Q5/11   2010-01-14
[ 577 ]  
 
Proposed additions to Q.3320 "Architectural framework for the Q.332x series of Recommendations"     NEC corporation   Q5/11   2010-01-14
[ 576 ]  
 
Proposed additions to Q.3308.1: Resource control protocol 8 (rcp8)     NEC corporation   Q5/11   2010-01-14
[ 547 ]  
 
Proposal for the Rw interface (Q.3323.3)     ZTE Corporation   Q5/11   2010-01-11
[ 546 ]  
 
Proposal for the Rt interface (Q.3325.1)     ZTE Corporation   Q5/11   2010-01-11
[ 545 ]  
 
Proposal for the Rs interface (Q.3321.1)     ZTE Corporation   Q5/11   2010-01-11
[ 544 ]  
 
Proposal for the QCI over Rw interface (Q.3323.3)     ZTE Corporation   Q5/11   2010-01-11
[ 519 ]  
 
Proposed update of Q.3320     Telecomunikacja Polska (Poland)   Q5/11   2010-01-08
[ 514 ]  
 
Scalability of Q.Flowstatesig     Anagran   Q5/11   2010-01-08
[ 513 ]  
 
Support for Q.Flowstatesig     Anagran   Q5/11   2010-01-08
[ 512 ]  
 
Edits to Q.Flowstatesig     Anagran   Q5/11   2010-01-08
[ 511 ]  
 
Signal Packet Marking Options for Q.Flowstatesig     Anagran   Q5/11   2010-01-08
[ 502 ]  
 
Proposal To Remove QoS Signalling Text Clause 7.3.1.1     Cisco   Q5/11   2010-01-08
[ 496 ]  
 
Proposal To Remove Reference QoS Signalling Text Clause 7.3.2     Cisco   Q5/11   2010-01-08
[ 494 ]  
 
Proposed text for the Rh' interface     ETRI   Q5/11   2010-01-08
[ 493 ]  
 
Revised texts of the Draft Recommendation Q.3308.1     ETRI   Q5/11   2010-01-08
[ 492 ]  
 
Proposed division to Q.3308.1     ETRI   Q5/11   2010-01-08
[ 434 ]  
 
Interworking between ANCP and RCIP in the bandwidth delegation procedure     Huawei Technologies , CATR   Q5/11   2010-01-08
[ 427 ]  
 
Proposed modifications to Q.3323.2 (Rw H.248 version 2)     Huawei Technologies , CATR   Q5/11   2010-01-07
[ 425 ]  
 
Protocol requirements of the interfaces in Q.PCNApp     Huawei Technologies , CATR   Q5/11   2010-01-07
[ 390 ]  
(Rev.1) 
Stability and Maturity of Draft ITU-T Recommendation Q.FlowStateSig     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 389 ]  
(Rev.1) 
Q.FlowStateSig: Collaboration with Q5/11 and IETF     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 388 ]  
(Rev.1) 
Q.Flowstatesig draft - Clause 7.3.1 DSCP code point and other issues     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 387 ]  
(Rev.1) 
Q.Flowstatesig draft - Comments on clause 7.3.2 IPv6 Signalling Procedures     Juniper Nettworks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 386 ]  
(Rev.1) 
Q.Flowstatesig draft - Architecture issues     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AB - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 385 ]  
(Rev.1) 
Draft Q.FlowStateSig - Packet forwarding and Scalability of the proposed solution     Juniper Networks , AT&T , Cisco Systems , Nokia Siemens Networks GMBH & Co. KG , Telefon AG - LM Ericsson , Verizon   Q5/11   2010-01-07
[ 348 ]  
 
Proposed modifications to Q.3323.2 (Rw H.248 Profile version 2)     CATR, the MIIT of China   Q5/11   2010-01-06
[ 302 ]  
 
Editorial changes to draft recommendation Q.Flowstatesig     Razoom Inc.   Q5/11   2009-12-23
Resultados :30 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-9-3