Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 11 : WP 2/11, 3/11 & 4/11 : Documentos Temporales  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 11  TD-GEN (2011-05-13) 

UIT-T SG 11

Requisitos y protocolos de señalización

Periodo de estudios 2009

Reunión  del 2011-05-13 al 2011-05-13

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-06-11  2012-02-17  2011-10-17  2011-05-20  [ 2011-05-13 ]  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-09-02  2009-05-21  2009-01-19 

Resultados :45 documentos
Documentos Temporales  (GEN)   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 672-GEN ]  
(Rev.1) 
Final List of Participants     TSB   QALL/11   2011-05-13
[ 671-GEN ]  
 
oLS-Update on FSA signalling draft Recommendation Q.Flowstatesig     Chairman, WP2/11   Q5/11   2011-05-13
[ 670-GEN ]  
(Rev.1) 
Q1/11 Meeting Report     Rapporteur, Q1/11   Q1/11   2011-05-13
[ 669-GEN ]  
 
A.5 Justification for draft Recommendation Q.3612     Editor   Q3/11, Q2/11   2011-05-13
[ 668-GEN ]  
 
Draft new Recommendation Q.3612 (formerly Q.centrexSig) for consent     Editors   Q3/11, Q2/11   2011-05-13
[ 667-GEN ]  
(Rev.1) 
Q2&Q.3/11 joint Meeting Report     Rapporteurs, Qs2&3/11   Q3/11, Q2/11   2011-05-13
[ 666-GEN ]  
 
Working Party 4/11 Meeting Report (Geneva, 13 May 2011)     Chairman, WP4/11   Q12/11, Q11/11, Q10/11, Q9/11, Q8/11   2011-05-13
[ 665-GEN ]  
(Rev.1) 
Q.12/11 meeting report     Rapporteur, Q12/11   Q12/11   2011-05-13
[ 664-GEN ]  
(Rev.1) 
oLS-Reply on JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups     Chairman, WP4/11   Q11/11, Q10/11, Q8/11   2011-05-13
[ 663-GEN ]  
(Rev.1) 
oLS-Q. real-time multimedia service testing at NGN UNI     Chairman, WP4/11   Q10/11   2011-05-13
[ 662-GEN ]  
 
Q7/11 meeting report (IoT-GSI, May 2011)     Rapporteur, Q7/11   Q7/11   2011-05-13
[ 661-GEN ]  
 
Q.7/11 meeting report (May 2011)     Rapporteur, Q7/11   Q7/11   2011-05-13
[ 660-GEN ]  
(Rev.1) 
Draft Working Party 3/11 Meeting Report (Geneva, 13 May 2011)     Chairman, WP3/11   Q15/11, Q7/11, Q6/11   2011-05-13
[ 659-GEN ]  
(Rev.1-2) 
WP3/11 Work Programme     Chairman, WP3/11   Q15/11, Q7/11, Q6/11   2011-05-13
[ 658-GEN ]  
 
Q.9/11 meeting Report     Rapporteur, Q9/11   Q9/11   2011-05-13
[ 657-GEN ]  
(Rev.1) 
Draft report of Working Party 2/11 meeting, Geneva, 13 May 2011     Chairman, WP2/11   Q5/11, Q4/11, Q3/11   2011-05-13
[ 656-GEN ]  
 
Q.11/11 Report     Rapporteur, Q11/11   Q11/11   2011-05-13
[ 655-GEN ]  
 
Q.10/11 Report     Rapporteur, Q10/11   Q10/11   2011-05-13
[ 654-GEN ]  
 
Q.8/11 Report     Rapporteur, Q8/11   Q8/11   2011-05-13
[ 653-GEN ]  
 
Justification of ETSI document ETSI TS 186 001- 4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP     Editor   Q8/11   2011-05-13
[ 652-GEN ]  
 
Justification of ETSI document ETSI TS 186 001-3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 3: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP     Editor   Q8/11   2011-05-13
[ 651-GEN ]  
 
A.5 Justification for Draft Recommendation Q.3203     Editor   Q7/11   2011-05-13
[ 650-GEN ]  
 
Draft new Recommendation Q.3203 (formerly Q.nacf.mob2) for consent     Editor   Q7/11   2011-05-13
[ 649-GEN ]  
 
A.5 justification for Draft Recommendation Q.3325     Editor   Q5/11   2011-05-13
[ 648-GEN ]  
(Rev.1) 
Draft new Recommendation Q.3325 for consent     Editor   Q5/11   2011-05-13
[ 647-GEN ]  
 
Q.6/11 Report     Rapporteur, Q6/11   Q6/11   2011-05-13
[ 646-GEN ]  
 
oLS-Handbook on Testing     Chairman, WP3/11   Q6/11   2011-05-13
[ 645-GEN ]  
 
Report of the Q.5/11 (Resource control and signalling requirements and protocols) meeting     Rapporteur   Q5/11   2011-05-13
[ 644-GEN ]  
 
Clean output draft Recommendation Q.3948 Service testing framework for VoIP at NGN UNI     Editor   Q10/11   2011-05-12
[ 643-GEN ]  
 
A.5 Justification for draft Recommendation Q. 3948     Editor   Q10/11   2011-05-12
[ 642-GEN ]  
 
Draft of Handbook on "testing and monitoring Network performance testing and control for guarantee required QoS for NGN services"     Editors   Q11/11, Q6/11   2011-05-12
[ 641-GEN ]  
 
Q.3941.4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP     Editor   Q8/11   2011-05-12
[ 640-GEN ]  
 
Q.3941.3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP     Editor   Q8/11   2011-05-12
[ 639-GEN ]  
 
Q.3941.2 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 2: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification     Editor   Q8/11   2011-05-12
[ 638-GEN ]  
 
Q.3941.1 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-ISDN     Editor   Q8/11   2011-05-12
[ 636-GEN ]  
 
Draft agenda of Working Party 2, 3 and 4/11 meeting, Geneva, 13 May 2011     Chairmen, WP 2,3,4/11   Q15/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11, Q5/11, Q4/11, Q3/11   2011-05-12
[ 635-GEN ]  
 
iLS-Liaison on definitions and terminology     ITU-T SG17     2011-05-02
[ 634-GEN ]  
 
iLS-Liaison on template for proposed new Recommendation     ITU-T SG17   QALL/11   2011-04-29
[ 633-GEN ]  
 
iLS-JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups     JCA-CIT   QALL/11   2011-04-29
[ 632-GEN ]  
 
oLS-Reply LS to JCA-IoT on invitation to the IoT-GSI     ITU-T SG11   QALL/11   2011-04-19
[ 631-GEN ]  
 
iLS-Liaison to ITU-T SG17 on Child Online Protection (COP)     JCA-AHF   QALL/11   2011-04-18
[ 630-GEN ]  
 
iLS-NGN studies     ITU-T SG3   Q1/11   2011-04-18
[ 629-GEN ]  
 
iLS-LS to TSAG on revision of Question 1/9 and deletion of Question 13/9     ITU-T SG9   QALL/11   2011-03-24
[ 628-GEN ]  
 
iLS-LS to all ITU-T Study Groups on invitation to the IoT-GSI     Convener, JCA-IoT   QALL/11   2011-03-22
[ 627-GEN ]  
 
iLS-Draft LS highlighting the changes of ITU-T portion of PP. Res. 71(Strategic plan) from (2008-20011) to (2012-2015)     Leader, TSAG Corr. Group, Strategic & Op. Plan   QALL/11   2011-03-22
Resultados :45 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-9-15