Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 12 : Reunión 2011-10-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 12  C (2011-10-31) 

UIT-T SG 12

Calidad de funcionamiento, calidad de servicio y calidad percibida

Periodo de estudios 2009

Reunión  del 2011-10-31 al 2011-11-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-07  2012-05-29  2011-01-18  2010-09-17  2010-05-18  2009-11-03  2009-03-10 

Resultados :88 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 293 ]  
 
HRTF measurements on HATS     Brüel & Kjaer Sound & Vibration Measurements A/S   Q5/12   2011-10-27
[ 292 ]  
 
Important factors that can influence the perceived quality of telemeetings     Telefon AB - LM Ericsson   Q18/12   2011-10-19
[ 291 ]  
 
A subjective multi-party test with both audio and audiovisual telemeeting connections     Telefon AB - LM Ericsson   Q18/12   2011-10-19
[ 290 ]  
 
Subjective tests on multiparty audio and audiovisual telemeetings with additional echo-free delays     Telefon AB - LM Ericsson   Q18/12   2011-10-19
[ 289 ]  
 
P.863 results in comparison to P.862.1     SwissQual AG   Q9/12   2011-10-19
[ 288 ]  
 
P.ONRA Contribution - Additional results from a candidate algorithm     Audience, Inc.   Q9/12   2011-10-19
[ 287 ]  
 
Number of interlocutors and QoE in multiparty telephone conferences     Deutsche Telekom AG   Q18/12   2011-10-19
[ 286 ]  
 
Listening test stimuli using scalable multiparty conversation test scenarios     Deutsche Telekom AG   Q7/12, Q18/12   2011-10-19
[ 285 ]  
 
Topics for Question 18/12 in view of insights from a field survey     Deutsche Telekom AG   Q18/12   2011-10-19
[ 284 ]  
 
Initial insights for P.AMT based on reviewing existing recommendations     Deutsche Telekom AG , Telefon AB - LM Ericsson   Q7/12, Q18/12   2011-10-19
[ 283 ]  
 
Proposed text for G.VSDF     Netscout Systems   Q16/12   2011-10-19
[ 282 ]  
 
Test results on G.720.1A used as VAD for the ITU-T G.729.1 in French Language     France Télécom Orange   Q7/12   2011-10-19
[ 281 ]  
 
Proposal of definition on Superwideband and Fullband telephony in P.10     France Télécom Orange   Q1/12   2011-10-19
[ 280 ]  
 
Superwideband /fullband testing     France Télécom Orange   Q5/12   2011-10-19
[ 279 ]  
 
Template to describe a proposed new ITU-T Recommendation     France   QALL/12   2011-10-19
[ 278 ]  
 
Conversational WB speech quality & draft WB E-Model     Deutsche Telekom AG   Q8/12   2011-10-19
[ 277 ]  
 
Performance of P.863 for two narrow-band datasets     Deutsche Telekom AG , SwissQual AG   Q9/12   2011-10-19
[ 276 ]  
 
Performance of P.863 on P.AAM acoustic data     Deutsche Telekom AG , SwissQual AG   Q9/12   2011-10-19
[ 275 ]  
 
Extending the E-Model For Capturing Noise Reduction and Echo Canceller Impairments     Deutsche Telekom AG   Q8/12   2011-10-19
[ 274 ]  
 
Draft Requirement Specification for P.AMD (Perceptual Approaches for Multi-Dimensional Analysis)     Deutsche Telekom AG   Q9/12   2011-10-19
[ 273 ]  
 
Quality perception in three-party conversation tests with synchronous and asynchronous delay     Deutsche Telekom AG   Q18/12   2011-10-19
[ 272 ]  
 
3CTs - 3-party Conversation Test scenarios for conferencing assessment     Deutsche Telekom AG   Q7/12, Q18/12   2011-10-19
[ 271 ]  
 
Description of conversation scenarios for interactive audiovisual communication     Deutsche Telekom AG   Q7/12   2011-10-19
[ 270 ]  
(Rev.1) 
Performance of P.OLQA on Speech Modelling Based Codecs     Qualcomm, Inc.   Q9/12   2011-10-18
[ 269 ]  
 
Reasons why having two sets of scales for P.AMD is ill-conceived.     AT&T, Inc.   Q9/12   2011-10-18
[ 268 ]  
 
Subjective testing methodology for P.AMD     AT&T, Inc.   Q9/12   2011-10-18
[ 267 ]  
 
Discussion on the use of RMSE* for P.NAMS/P.NBAMS evaluation procedure     Netscout Systems   Q9/12, Q14/12   2011-10-18
[ 266 ]  
 
P.863 performance on a narrowband acoustic to acoustic experiment     Netscout Systems   Q9/12   2011-10-18
[ 265 ]  
 
Input to ITU-T P.863 characterization     Netscout Systems   Q9/12   2011-10-18
[ 264 ]  
 
Preliminary results on P.863 NB vs. PESQ NB Behavior     Ascom (Switzerland) Ltd.   Q9/12   2011-10-18
[ 263 ]  
 
Correction to ITU-T Rec. P.58     Brüel & Kjaer Sound & Vibration Measurements A/S   Q5/12   2011-10-18
[ 262 ]  
 
Correction to ITU-T Rec. P.57     Brüel & Kjaer Sound & Vibration Measurements A/S   Q5/12   2011-10-18
[ 261 ]  
 
Ambisonic Artificial Noise-field Applications     Nokia Corporation   Q5/12   2011-10-18
[ 260 ]  
 
Contribution to P.863's characterisation: study of typical scores for various codec, selection of reference sentences, and correspondence between NB and SWB MOS scales     France Télécom Orange   Q9/12   2011-10-18
[ 259 ]  
 
A study on tasks for assessing audiovisual quality of videoconferencing systems in multipoint conversation tests     France Télécom Orange   Q7/12, Q18/12   2011-10-18
[ 258 ]  
 
Noisiness Dimension, Evaluation and Diagnostic     France Télécom Orange   Q9/12, Q16/12, Q15/12   2011-10-18
[ 257 ]  
 
P.862.3 Appendix I P.862.1 Reference values     British Telecommunications Public Ltd. Co. (BT Plc)   Q9/12   2011-10-18
[ 256 ]  
 
Wideband Frequency Response Tests using ITU-T P.501 proposed Speech Signals, Artificial Voice and CSS     HEAD Acoustics GmbH   Q6/12   2011-10-18
[ 255 ]  
 
Revision of P.501     HEAD Acoustics GmbH   Q6/12   2011-10-18
[ 254 ]  
 
Proposal for identifying P.NAMS and P.NBAMS files to be used in model selection     Netscout Systems   Q14/12   2011-10-18
[ 253 ]  
 
Multiparty test scenarios for audiovisual conferences tests     China   Q18/12   2011-10-18
[ 252 ]  
 
Propose to set up a new work item on the traffics statistical metrics of Internet services     China   Q12/12   2011-10-18
[ 251 ]  
 
Proposal for new work items of operational aspects of Internet service quality     China   Q12/12   2011-10-18
[ 250 ]  
 
Proposal for study the operational aspects of Internet service quality     China   Q12/12   2011-10-18
[ 249 ]  
 
Proposed full-band Chinese speech samples for ITU-T Rec.P.501     China   Q6/12   2011-10-18
[ 248 ]  
+Corr.1 (Rev.1) 
Web Browsing QoE Subjective Testing Methodology     A1 Telekom Austria AG   Q17/12, Q13/12, Q11/12   2011-10-18
[ 247 ]  
 
The third draft of P.UHIP     China   Q3/12   2011-10-18
[ 246 ]  
 
Proposed updated draft Recommendation P.STAT: Methods, metrics and procedures for statistical evaluation, qualifying and comparison of objective quality prediction models     Ascom (Switzerland) Ltd.   Q9/12, Q7/12, Q14/12, Q13/12   2011-10-18
[ 245 ]  
 
P.NAMS audio and audiovisual processing chain extensiont     Telchemy Incorporated   Q14/12   2011-10-18
[ 244 ]  
 
Proposal for additional consideration of femtocell for further study of Y.154HN     KDDI Corporation   Q17/12   2011-10-18
Resultados :88 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-8-5