Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 12 : Reunión 2011-10-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 12  C (2011-10-31) 

UIT-T SG 12

Calidad de funcionamiento, calidad de servicio y calidad percibida

Periodo de estudios 2009

Reunión  del 2011-10-31 al 2011-11-09

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-07  2012-05-29  2011-01-18  2010-09-17  2010-05-18  2009-11-03  2009-03-10 

Resultados :15 documentos
Contribuciones  [ AI/Cuestión: Q7/12 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 286 ]  
 
Listening test stimuli using scalable multiparty conversation test scenarios     Deutsche Telekom AG   Q7/12, Q18/12   2011-10-19
[ 284 ]  
 
Initial insights for P.AMT based on reviewing existing recommendations     Deutsche Telekom AG , Telefon AB - LM Ericsson   Q7/12, Q18/12   2011-10-19
[ 282 ]  
 
Test results on G.720.1A used as VAD for the ITU-T G.729.1 in French Language     France Télécom Orange   Q7/12   2011-10-19
[ 272 ]  
 
3CTs - 3-party Conversation Test scenarios for conferencing assessment     Deutsche Telekom AG   Q7/12, Q18/12   2011-10-19
[ 271 ]  
 
Description of conversation scenarios for interactive audiovisual communication     Deutsche Telekom AG   Q7/12   2011-10-19
[ 259 ]  
 
A study on tasks for assessing audiovisual quality of videoconferencing systems in multipoint conversation tests     France Télécom Orange   Q7/12, Q18/12   2011-10-18
[ 246 ]  
 
Proposed updated draft Recommendation P.STAT: Methods, metrics and procedures for statistical evaluation, qualifying and comparison of objective quality prediction models     Ascom (Switzerland) Ltd.   Q9/12, Q7/12, Q14/12, Q13/12   2011-10-18
[ 234 ]  
 
test results for the ITU-T G.729B dependent layer for G.720.1A Characterisation conducted by Huawei Technologies     Huawei Technologies Co. Ltd.   Q7/12   2011-10-18
[ 233 ]  
 
test results for the ITU-T G.729.1 VAD using G.720.1A Characterisation conducted by Huawei Technologies     Huawei Technologies Co. Ltd.   Q7/12   2011-10-18
[ 232 ]  
 
Results on P.863 Performance within the Characterization Phase's Scope Based on an Extended Set of Statistical Evaluation Metrics     Ascom (Switzerland) Ltd.   Q9/12, Q7/12   2011-10-18
[ 231 ]  
 
Clipping problem for -16dBov stereo Chinese speech signals     Huawei Technologies Co. Ltd.   Q7/12   2011-10-17
[ 228 ]  
 
P.MULTI subjective testing methodology - number of relevant Perceptual Quality scales and additional validation of the test methodology.     Dynastat, Inc.   Q7/12   2011-10-16
[ 217 ]  
 
Performance of P.863 on interruptions and lost speech     SwissQual AG   Q9/12, Q7/12   2011-10-10
[ 216 ]  
 
Subjective test method for live calls     SwissQual AG   Q9/12, Q7/12   2011-10-10
[ 212 ]  
 
Proposal for a framework for P.MULTI and P.AMD     Deutsche Telekom AG   Q9/12, Q7/12   2011-06-14
Resultados :15 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-7-12