Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2010-05-31 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2010-05-31) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2010-05-31 al 2010-06-11

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :16 documentos
Contribuciones  [ Origen: France ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1093 ]  
 
Revised draft of Recommendation L.teib "Optical cabling shared with multiple operators in buildings"     France Télécom   Q16/15   2010-05-21
[ 1019 ]  
 
G.8251: OTN timing aspects     France Télécom   Q13/15, Q11/15   2010-05-20
[ 1017 ]  
 
Network PDV accumulation study     France Télécom   Q13/15   2010-05-20
[ 986 ]  
 
G.8265.1: Clarifications on the Telecom slave model with multiple slave-only OC instances     France Télécom   Q13/15   2010-05-20
[ 985 ]  
 
G.8265.1: Proposal for the PTP master selection process by a PTP slave in the PTPv2 telecom profile frequency-oriented     France Télécom   Q13/15   2010-05-20
[ 899 ]  
 
Updated Telecom Slave Model     Huawei , France Télécom   Q13/15   2010-05-18
[ 894 ]  
 
G.8264 Amendment: editorial comments regarding the use of physical methods to deliver timing in a multi-operator context     Huawei , France Télécom   Q13/15   2010-05-18
[ 876 ]  
 
Issues with the Transparent Clock concept of PTPv2 in a telecom environment     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 875 ]  
 
Architecture for phase and time distribution     France Télécom   Q4/15, Q2/15, Q13/15   2010-05-18
[ 873 ]  
 
G.8260: discussion on packet pre-selection criteria and comments on cluster and FWPR PDV metrics     France Télécomq   Q13/15   2010-05-18
[ 872 ]  
 
G.8260: technical comments regarding WD115 (PDV metrics) from San Jose interim meeting     France Télécom , Tellabs   Q13/15   2010-05-18
[ 871 ]  
 
G.8260: definition of floor delay, delay steps, and comments on Appendix I     France Télécom   Q13/15   2010-05-18
[ 870 ]  
 
G.8260: list of requirements for PDV metrics     France Télécom   Q13/15   2010-05-18
[ 865 ]  
 
G.8260: methodology to perform a PDV measurement     France Télécom, Ericsson   Q13/15   2010-05-18
[ 785 ]  
 
Proposed ITU-T Rec. on remote management of CPE     Alcatel-Lucent , BT , Cable & Wireless Communications , France Telecom Orange , Nokia Siemens Networks , Swisscom , Technicolor , Telecom Italia   Q4/15, Q2/15, Q1/15   2010-05-14
[ 780 ]  
 
Test plan for PDV generation of a single equipment involved in IEEE1588-2008 transport     France Télécom , Cisco   Q13/15   2010-05-10
Resultados :16 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-8-16